Isle of Wight (Newport and Ryde)

2020-2030


image


image

/ ISLEo1

"t1'=--..._ ' W I G H1/T

/COUNCIL

Contents


3 Executive summary 4 Introduction 5 Background

Isle of Wight: cycling and walking

6 Local cycling and walking infrastructure plans

Local cycling and walking infrastructure plans – process

8 Stage 1 – geographical scope 9 Stage 2 – gathering information

National walking cycling statistics

Isle of Wight Council travel behaviour change programmes

15 Stage 3 – network planning for cycling

Identifying trip origin and destinations The cycle route selection process Newport cycling route proposals Route summary

Route summary

23 Stage 4 – network planning for Walking Identifying key walking routes and core walking zones Route selection and auditing

Newport walking routes Route summary

Ryde walking routes Route summary

31 Stage 5 – action plan 32 Stage 6 – action plan


Executive

summary

In 2017 the Government published its first Cycling and Walking Strategy (CWIS), setting out an ambition to make cycling and walking the natural choice for shorter journeys, or as key stages within longer journeys.

The CWIS references ambitious targets for increasing cycling and walking, including:

to aim to double cycling, where cycling activity is measured as the estimated total number of cycle stages made each year, from 0.8 billion stages in 2013 to 1.6 billion stages in 2025;

to aim to increase walking activity, where walking activity is measured as the total number of walking stages per person per year, to 300 stages per person per year in 2025.

In recognising that improvements to infrastructure are critical to increasing volumes of cycling and walking, the CWIS introduces local cycling and walking infrastructure plans (LCWIPs) – a new strategic approach to identifying cycling and walking improvements required at the local level, to enable a long-term approach to developing local cycling and walking networks.

To assist local authorities in the preparation of LCWIPS, the Department for Transport (DfT) has prepared technical guidance together with a number of software tools which support route audit and selection. A number of local authorities have also benefitted from external technical support facilitated through the DfT.

This document presents the first LCWIP for the Isle of Wight covering the towns of Newport and Ryde. Following the stages set out in the LCWIP Guidance, the Isle of Wight LCWIP considers a range of background evidence and stakeholder engagement, setting out 16 cycle route corridors


and 24 walking routes and zones, which if implemented, will lead to a transformation in volumes of cycling and walking in Newport and Ryde, in line with the ambition of the CWIS.

This LCWIP process sets out how we work towards delivering ambitious plans to increase walking and cycling opportunities across the Isle of Wight. The plan will help support the delivery of planning policy, regeneration plans, health and wellbeing policy, and Island’s emerging climate and environment strategy supporting the Island going carbon neutral by 2035.


Introduction


Local cycling and walking Infrastructure plans are identified in the Government’s strategy as a new tool to identify strategic cycling and walking improvements at the local level. They enable a long-term approach to developing local cycling and walking networks, ideally over a 10-year period.

In 2017 the Government published its first cycling and walking investment strategy, which sets out their ambition to make walking and cycling the natural choices for shorter journeys or as part of a longer journey. This report has been developed to support the emerging new planning policy and the local transport plan. This local cycling and walking infrastructure plan (LCWIP) is a live strategy developed in partnership with key stakeholders.

The plan has been produced to help plan new or improved walking and cycling routes, and to prioritise future resources.

The LCWIP was developed using ‘local cycling and walking infrastructure plan technical guidance for local authorities’, issued by the Department for Transport (DfT), and also considering existing local walking and cycling plans. Technical support was provided by DfT’s appointed consultant, WSP, and guidance and advice was provided by Sustrans, who are part of the strategic support team.

The Isle of Wight LCWIP (‘The plan’) brings together existing evidence on potential improvements to the walking and cycling networks within selected geographical areas, and provides a consistent methodology to prioritise interventions aimed at:


improving the cycling network to reduce the propensity to travel by private vehicle and increase active travel, by walking and cycling; identifying and prioritising walking infrastructure opportunities to increase the number of walking trips to local destinations;

ensuring new development complements and connects to the existing and planned walking and cycling network; and

Isle of Wight to bid for funding to make improvements to the network.

Background


Isle of Wight: cycling and walking

The Isle of Wight is the nation’s Bicycle Island and home of Walk the Wight, the largest sponsored walk of its kind in Europe. It’s a place where active

image

modes are welcomed and their benefits realised; the geography, demography and spatial design of the Isle of Wight are all enablers of active

travel.

The Isle of Wight Council is committed to cycling and walking and has an ambition to normalise cycling and walking for short distance journeys.

Will seek to achieve this by:

identifying, prioritising and appraising cycling and walking networks which link origins and destinations;

developing and presenting compelling business cases for active mode infrastructure investment from all possible funding sources;

maximising the volume of cycling and walking stages through the delivery of travel behaviour


Local cycling and walking

infrastructure plans

change campaigns across a variety of target markets;

working closely with our key stakeholders (Ramblers, CycleWight, town and parish councils and local regeneration and business groups) to seek to resource new or improved walking and cycling routes.

Whilst ongoing investment in travel behaviour change interventions on the Island is evidencing an increasing volume of trips using active modes, there remains a clear demand for additional investment in cycling and walking infrastructure.

A number of Island settlements are already linked by traffic free cycling and walking corridors, and where this is the case, trip volumes are encouraging.

The challenge going forward is to ensure that many more settlements, and other logical origins and destinations, are connected by high quality cycling and walking infrastructure which inspires use. The tools and processes set out in the LWCIP guidance will provide confidence that future schemes are robust.

The Isle of Wight is England’s only island local highway authority, which presents a unique set of circumstances for cycling and walking. 90.2 per cent of economically active Island residents are employed in jobs which are based on the Island; only five per cent of jobs on the Island are taken up by non-residents, indicating a residence based self-containment level of 95 per cent. Around 8.9 million passenger journeys are made across The Solent each year, and just over half of these trips are generated by visitors to the Island.

What this means is that unlike other local authority areas, many of the products and services required by Island residents can be obtained on the Island via short distance trips. In addition, distances between many settlements on the Isle of Wight are lower that the 15km average commuting distance identified through the 2011 census.

Local cycling and walking infrastructure plans (LCWIPs), as set out in the Government’s cycling and walking investment strategy, are a new, strategic approach to identifying cycling and walking improvements required at the local level.

They enable a long-term approach to developing local cycling and walking networks, ideally over a 10-year period, and form a vital part of the

Government’s strategy to increase the number of

trips made on foot or by cycle.

The key outputs of LCWIPs are:

a network plan for walking and cycling which identifies preferred routes and core zones for further development;

a prioritised programme of infrastructure improvements for future investment;

a report which sets out the underlying analysis carried out and provides a narrative which supports the identified improvements and network.

By taking a strategic approach to improving conditions for cycling and walking, LCWIPs will assist local authorities to:

identify cycling and walking infrastructure improvements for future investment in the short, medium and long term;



ensure that consideration is given to cycling and walking within both local planning and transport policies and strategies;

make the case for future funding for walking and cycling infrastructure.

While the preparation of LCWIPs is nonmandatory, local authorities which have completed and adopted LCWIPs will be well placed to make the case for future investment.

The development of a LCWIP has be directed by the Department of Transport who produced clear


Local cycling and walking infrastructure plans – process


guidance for local authorities to follow. The stages of development and resources required to complete each stage varied. Stakeholders were assisted throughout the process and additional resource from local contractors was procured to assist the auditing and mapping elements of the plan.

Alongside local support the production of the LCWIP has been supported through active travel consultants, WSP. WSP provided 30 days of support across all stages of the LCWIP process and were funded directly by the DfT.


Stage

Name

Description

1

Determining scope

Establish the geographical extent of

the LCWIP, and arrangements for governing and preparing the plan.

2

Gathering information

ldentify existing patterns of walking and cycling and potential new journeys. Review existing conditions and identify barriers to cycling and walking. Review related transport and land use policies and

programmes.

3

Network planning for cycling

Identify origin and destination points and cycle flows. Convert flows into a network of routes and determine the type of

improvements required.

4

Network planning for walking

Identify key trip generators, core walking zones and routes. Audit existing provision and determine the type of improvements required.

5

Prioritising improvements

Prioritise improvements to develop

a phased programme for future investment.

6

Integration and application

Integrate outputs into local planning

and transport policies, strategies, and delivery plans.

Recognising the scale of the process, the LCWIP guidance suggest that authorities divide their LCWIP into sub-areas, enabling the development of the LCWIP to be phased. In this case, authorities should prioritise areas which have the greatest potential for growing cycling and walking trips.


Stage 1 – geographical

scope


The LCWIP guidance recommends that where

authorities are dividing their LCWIP into a number of sub-areas, priority should be given to areas which have the greatest potential for growing cycling and walking trips.

As such, Newport and Ryde have been selected as priority settlements because:

by population, they are the Island largest settlements on the Isle of Wight;

they have the highest transport movements, as measured in journeys to work and school;

they have the highest propensity for increased

cycling and walking;

they are centres for future growth and regeneration;

of opportunities to support partnerships with external partners of securing external resources, eg, Ryde’s link to the South Hampshire application to the Transforming Cities Fund.


Newport: Geographical extent of LCWIP


Ryde: Geographical extent of LCWIP

image image

© openstreetmap.org contributors & opendatacommons.org © openstreetmap.org contributors & opendatacommons.org


Stage 2 – gathering

Propensity to Cycle Tool (PCT). This webbased

information

After agreeing the scope of the LCWIP the stakeholder groups reviewed as much local, regional and national data possible to help inform the selection of walking and cycling routes.

Whilst is it noted that travel behaviour change interventions are not covered by the LWCIP guidance, it is accepted that they have an important role to play alongside the delivery of infrastructure schemes.

The Isle of Wight is one of a small number of local authorities which has benefitted from concurrent rounds of sustainable transport funding from DfT since 2012. The key milestones and learning from these programmes has been reviewed and used to support the LWCIP process of identifying key capital infrastructure improvements.

The Island is fortunate to benefit from proactive, well regarded advocacy groups for cycling and walking, including CycleWight and the Isle of Wight Ramblers. CycleWight is in the process of developing an Isle of Wight cycling strategy, including a detailed set of network enhancements and future routes. Isle of Wight Ramblers provided a comprehensive and considered response to the recent reassessment of the council’s rights of way improvement plan. Both organisations played a key role in providing information and data to the project team.

As a further layer of evidence to assist in the development of the LCWIP cycling network, origin and destination points were analysed using The

tool is an online resource developed by the DfT which has been designed to assist with the strategic planning of cycling networks. It comprises an interactive map which displays the current and potential distribution of commuter cycling trips under different growth scenarios.

This data was shared with stakeholders.

The maps on the following page show the proportion of commuters in each zone with a fast route commute distance less than 10km (calculated excluding people with no fixed workplace). The average proportion was 58 per cent across zones in the Isle of Wight, compared with a national average of 56 per cent. The right- hand map shows the average hilliness of the fastest routes used by commuters living in each zone. The average was three per cent across zones in the Isle of Wight, compared with a national average of 1.9 per cent.

Local cycling and walking infrastructure plan Isle of Wight (Newport and Ryde) 2020 to 2030


Proportion of commuters with a fast route commute distance less than 10km

image


The maps below compare the most recent cycling commuter flows (2011 census) for Newport and Ryde alongside those required to achieve the CWIS cycling target by 2025 (doubling cycling).


Newport: Percentage cycling to work (2011 census)

The average hilliness of commute trips less than 10km

image image


image

9

Black lines represent the boundaries of middle super output areas (MSOAs). The maps below sets out the cycling to work 2011 data alongside the national target.


image

Newport: Percentage cycling to work (CWIS 2025 target)


image

image

image

image

0-1% 2-3%

4-6%

image

image

7-9%

© openstreetmap.org contributors & opendatacommons.org

© openstreetmap.org contributors &

opendatacommons.org

Ryde: Percentage cycling to work (2011 census)

Ryde: Percentage cycling to work (CWIS 2025 target)


image


© openstreetmap.org contributors & opendatacommons.org © openstreetmap.org contributors & opendatacommons.org


For this study the top fifteen straight line desire lines between census local super output areas (LSOAs) were determined, applying the ‘go Dutch scenario’ which considers the increase in cycle users if England had the same infrastructure and cycling culture as the Netherlands. Whilst the tool

outputs are not predictions of the future, they provide snapshots indicating how the spatial distribution of cycling may shift as cycling grows based on current travel patterns

Comparison of desire lines for cycle trips in Newport (top 15 clustered desire lines and top 15 propensity to cycle tool straight line flows)


image

Clustered analysis Line width


parish

desire lines based on origin destination (top 15 lines)

image

indicates potential for cycling

Propensity to cycle tool straight line flow


image

scenario (top 15 lines)

indicates potential for cycling

civil parish


image

desire lines based on origin destination (top 15 lines)

indicates potential for cycling

Propensity to cycle tool straight line flow

image


image

scenario (top 15 lines)

indicates potential for cycling Ryde civil


© openstreetmap.org contributors & opendatacommons.org

Further maps illustrating the above analysis can be found in appendix A.

The Government wants walking and cycling to be a normal part of everyday life, and the natural choices for shorter journeys such as going to


school, college or work, travelling to the station, and for simple enjoyment.

In 2017 the Government published its first cycling and walking investment strategy (CWIS). The strategy sets out the Government’s ambition to


make walking and cycling the natural choices for shorter journeys or as part of a longer journey.

Realising this ambition will take sustained investment in cycling and walking infrastructure, and partnership working with local bodies, the third sector and the wider public and private sector to build a local commitment.

The strategy supports the transformation of local areas: change which will tackle congestion, change which will extend opportunity to improve physical and mental health, and change which will support local economies. The strategy’s objectives are to:

increase cycling activity, where cycling activity is measured;

increase walking activity, where walking activity is measured;

increase the percentage of children aged 5 to 10 that usually walk to school;

support appropriate training of young people, eg, Bikeability to primary schools;

increase the percentage of children aged five to 10 that usually walk to school from 49 per cent in 2014 to 55 per cent in 2030;

promote the Island as walking and cycling destination supporting an increase in sustainable transport, green tourism and regional and national events.


National walking cycling statistics

Walking and cycling statistics available from the DfT presents data using two main sources, the National Travel Survey (NTS) and the Active Lives Survey (ALS).

The NTS is a household survey of personal travel by residents of England travelling within Great Britain, from data collected via interviews and a one-week travel diary. The ALS is a household survey by residents of England, from data collected via a push-to-web survey.

The data provides insight into levels of activity across the Isle of Wight. The data cannot be attributed to residents of Ryde or Newport, although the key datasets of relevance to the LCWIP are:

Proportion of adults who do any walking or cycling, for any purpose, by frequency and local authority, England, 2017-2018

Proportion of adults that cycle, by frequency, purpose and local authority, England, 2017-2018

Proportion of adults that walk, by frequency, purpose and local authority, England, 2017-2018

Proportion of adults who do any walking or cycling, for any purpose, by frequency and local authority, England, 2017-2018

The charts on page 13 show the proportion of adults which cycle or walk for any purpose across a range of frequencies. Data for the Isle of Wight is compared alongside that of the South East and England. ‘Walking’ refers to any continuous walk of over 10 minutes, irrespective of purpose;

‘cycling’ refers to any cycling, irrespective of length or purpose.

image

The chart shows that levels of walking and cycling are higher on the Isle of Wight than the south east and England as a whole. 86.4 per cent of Isle of Wight residents cycle or walk once per month, and over 53 per cent cycle or walk three times per week.


Proportion of adults that cycle for travel, by frequency (2017-2018)

The chart below shows the proportion of Isle of Wight adult residents which cycle for travel across four frequency criteria. Cycling for travel refers to cycling from place to place, e.g. from home to work. The chart shows that cycling five times per week, or three times per week, at 2.1 per cent and 3.5 per cent respectively, is higher than the

data for England as a whole, but slightly lower than the data for the south east. The proportion of adults cycling less frequently, once a month or once a week, is lower than the equivalent data for both the south east and England as a whole.

Proportion of adults that cycle for travel, by frequency (2017-2018)

image


image image image image image image

Proportion of adults that walk for utility purposes, by frequency (2017-2018).

The chart below shows the proportion of Isle of Wight adult residents which walk across four frequency criteria. Walking for travel refers to walking from place to place, eg, from home to a place of employment. The proportion

of Isle of Wight residents walking five times a week (18.2 per cent) or three times a week (23.6 per cent) is higher than the both the south east and England as a whole. The proportion walking at least once a month (86

per cent) is significantly higher than the equivalent frequency for the south east (81.5 per cent) and England as a whole (78.2 per cent).

Isle of Wight Council travel behaviour change programmes

Access fund

The LCWIP guidance recognises that behaviour change interventions should be considered alongside the infrastructure schemes. Since 2011, the Isle of Wight Council has been successfully in securing funding from the Department for

Proportion of adults that walk for travel, by frequency (2017-2018)

image


image image image image image image


Transport to deliver target market specific travel behaviour change programmes. These programmes have included a specific focus on

residents accessing employment and education, and visitor travel.

Employers participating in the programme demonstrate the following mode share:


Mode share (%)



Organisation


Location


Car

Car Share


Walk


Cycle


Bus


Other

Volume of employees

Southern Vectis

Newport

53

8

11

13

11

4

263

Isle of Wight NHS Trust

Newport

68

7

8

5

2

2950

Broadlands House

Newport

52

23

18

0

4

3

140

Isle of Wight Council

Newport

68

8

9

6

8

1

1800

School participating in the programme demonstrate the following mode share:


Mode share (%)



School name


Location


Cycle


Walk

Scoot or skate


Bus


Car


Pupils

Bembridge C of E Primary School

Ryde

13.4

39.7

12.9

0.9

33.1

194

Oakfield CofE Primary

Ryde

3.9

42.7

17.1

5.0

30.4

275

Binstead Primary School

Ryde

17.0

34.4

14.8

0.3

33.4

208

Greenmount Primary

Ryde

2.7

44.8

8.9

2.2

41.5

418

Dover Park Primary School

Ryde

2.8

62.2

12.1

0.6

22.3

197

Wootton Primary

Ryde

5.2

52.2

11.6

0.7

29.8

189

St Mary's Catholic Primary

Ryde

2.4

35.8

6.5

0.0

55.3

188

Haylands Primary School

Ryde

5.8

52.4

8.3

0.2

33.3

403

Newport CE Primary

Newport

3.5

60.6

9.6

0.6

25.7

306

Summerfields Primary

Newport

2.9

41.5

11.4

1.0

43.1

189

Barton Primary School

Newport

0.0

75.9

3.4

0.0

20.7

255

Hunnyhill Primary

Newport

2.7

53.2

12.2

1.9

30.0

332

Nine Acres Primary

Newport

6.6

59.5

10.7

0.0

23.1

337


Stage 3 – network

planning for cycling

This chapter provides an overview of how a network plan for cycling has been determined. An initial stage is to consider where the propensity for cycling exists within Newport and Ryde, and where the targeted investment in infrastructure can generate more journeys by bicycle. This task was advanced through a series of sequential stages of evidence gathering, analysis and options development.

The Isle of Wight LCWIP has been developed in consultation with key stakeholders to ensure the views of a variety of road users have been captured. The consultation process and the development of the LCWIP has been informed by stake holder feedback and key data sources.

A number of engagement/consultation meetings were coordinated with key stakeholders across a number of months in 2019 to help gather information, review data, identify key routes and shape the priorities contained within the report.

Information contained within school and business active travel plans were reviewed during the route selection process, including current modes of transport.

Stakeholder events were held in Newport and Ryde:

Wednesday 27 March: Cycling, Ryde Thursday 28 March: Cycling, Newport

The objectives of the workshops were to: introduce the LCWIP process to a broad range of local stakeholders;

review cycle movement data;

agree key origins and destinations per town – considering population clusters, regeneration sites, businesses, commuting routes, education routes, and tourist links;

share initial proposals for cycling networks in Newport and Ryde which should be progressed for auditing;

utilise local knowledge and experience to refine the cycling and walking proposals.

Organisations represented at workshops included:

Ryde Regeneration Working Group, comprising: Ryde Town Council

Ryde Business Association Isle of Wight Council

Ryde Society

Newport and Carisbrooke Parish Council Isle of Wight Council

Isle Access: a user led charity committed to encouraging and promoting greater accessibility and inclusion for people on the Isle of Wight

Isle of Wight Ramblers

CycleWight: local cycling advocacy group Tourism businesses

Separate consultation was undertaken with the local authorities PFI contractor in relation to aligning the core principles of the LCWIP and network links to the esplanade travel interchange and the emerging transforming cities project.

Consultation aligned key routes from both a cycling and walking perspective.

Ryde and Newport regeneration groups were heavily involved in the development of the routes and actively engaged in stakeholder workshops. The LCWIP network routes were focused on aligning with both Ryde and Newport regeneration priorities.


Consultation workshops focused on a number of key routes for each town. Cycle routes that focused on joining with town centre central walking zones and esplanade with key regeneration, economic, tourist and education zones.

Consultation groups reviewed and considered existing plans including: rights of way improvement plans; cycle forum strategies; and emerging regeneration plans.

Routes used by pupils to travel to and from school/college were considered in the scoping of the plan. Some routes have been identified to help pupils move towards a more sustainable mode of transport to school. Schools in Ryde and Newport were consulted and where safe route to school travel plans identified

Routes identified were prioritised against a number of key criteria – scheme feasibility and design, road safety, accessibility and community benefit, value for money and potential to attract external funding (linking to existing regeneration plans).

The consultation process identified the need to: identify trip origins and destinations (current and future) and barriers to cycle movement; determine the cycle desire lines for movement between trip origins and destinations;

establish routes that serve the primary desire lines to support the development of cycle route infrastructure options for routes highlighted for auditing.

It should be noted that updated feasibility studies and consultations with stakeholders and the local community will be required as and when schemes come forward for consideration.

The following sub-sections present the outcome from this the process.

Identifying trip origin and destinations

Desk studies of the key cycle origins and destinations (ODs) in Newport and Ryde were

carried out to understand where people are currently travelling to and in the future.

The ODs were plotted within a buffer of 5km radius from the town centre area, which considers a feasible cycle distance of 5km. The following data was sourced and plotted using Geographic Information Systems (GIS) software:

Town centre areas.

Employment areas, or large individual employers. Educational establishments.

Hospitals. Supermarkets. Leisure facilities.

Transport interchange facilities.

Future employment and residential developments.

Firstly, it was necessary to consider where people make journeys from; otherwise known as trip origins. This was achieved by identifying significant residential areas in Ryde and Newport; taken as being lower super output areas (Census 2011).

These were mapped in GIS software to show where the population is greatest within each area, thereby representing a greater potential for trips. Future planned residential developments with over 100 units were also taken from the current local plan and plotted in GIS – recognising the value in LCWIP planning to connect with anticipated future trip demands.

Following this it was necessary to determine where people will make local journeys to destinations within the town, otherwise known as trip-attractors, were identified. These were then categorised based on how many trips that may attract and mapped in GIS software. Local amenities such as education, leisure centres and healthcare were treated as destination points with equal demand, whereas primary destinations such as the retail centre and railway stations were given a higher weighting.



The town centres are a key destination, with numerous shops and services, this was rated accordingly from the perspective of potential cycling and walking demand, in comparison to individual local amenities outside of the main town centre area. Additionally, key employment areas were plotted. Each site was weighted based on its estimated number of jobs. This was calculated by halving the area of the building footprint to give an estimated usable floorspace,


by trained audit teams visiting each route corridor on location and applying the Department for Transport’s route selection tool (RST). The primary function of the tool is to assess the suitability of a route in its existing condition against the core design outcomes of being coherent, direct, safe, comfortable and attractive, then compare it with the potential future state, if improvements were made. It also enables the easy comparison of alternative routes.

image

suitable?

Use route

Route selection process (Source: LCWIP Technical Guidance for Local Authorities, DfT, 2017)

assuming there is one job for every 30m2.

For all other destination types, a desire line for travel was identified from each origin to the closest of each type. The assumption behind this is that people are likely to only travel to their closest for example library or leisure centre.


The cycle route selection process

Following identification of the key desire lines in Newport and Ryde, these desire line corridors were then mapped to the network and verified by key stakeholders, creating a list of actual cycle routes for inclusion in the LCWIP. To select the preferred routes for each corridor, the council followed the route selection process in line with

the DfT’s guidance for LCWIP, this is shown below.

Consistent with the guidance, for each of the identified desire line corridors the most direct routes were identified and then a route auditing process was undertaken. Audits were undertaken

The RST uses a range of criteria to assess how well a route meets the core design outcomes for cycling, based around the following criteria: directness;

gradient; safety;

connectivity; and comfort.

A total of fifteen routes were audited using the RST tool. The RST process allowed for an assessment to be made of both existing conditions and the potential for route development. The following factors were also taken into consideration when auditing and determining the potential for routes:

The quality of existing cycling provision/infrastructure.

The potential of the route to connecting other origins and destinations within the corridor.


The potential for and feasibility of route improvements, based on any apparent constraints.

Critical junctions, to determine how these could be either avoided or enhanced to make the route more attractive, safe and direct for cyclists.

The potential integration with other highways or active travel schemes or infrastructure programmes to add wider value.

The route selection process led to the derivation of a Provisional Network Plan for Cycling. The deliverability of the route has been ranked on a scale of one (complex) to five (easy). Generally, scores of three to five suggest highly deliverable schemes while score of one or two suggest significant technical or legal issues would need to be addressed to enable delivery. A score of one or two should not mean a scheme is not considered, rather that its delivery will be more complex.


Newport cycling route proposals

The cycle routes which are to be taken forward for prioritisation are discussed in this section. Accompanying maps detailing each of the audited routes, covering both existing conditions and identified cycling infrastructure improvements can be found in Appendix B.


Code


Route name

Route length

NC1

Mews Lane to Newport Quay

1.5km

An overview of the routes is highlighted in the in the table below:


image

NC2 Pan to Furrlongs       0.7km NC3 Shide to Stag Lane 4.0km


NC4Church Litten to Newport town centre0.7km


NC7

Parkhurst to Newport town centre

1.6km

NC8

Dodnor Lane (North to South)

1.6km


NC9

Medina College/1Leisure Medina to Newport town

centre


1.5km

NC10 Cross Medina route 0.8km


image


Route summary

NC1 Mews Lane to Newport Quay

This route involves the Improvement of an existing sub-standard former railway line route to allow

all-weather cycling, improve convenience and comfort and strengthen links with local residential areas. Improvements proposed include surfacing, widening and lighting of the route. It connects with the cycle route to Wootton/Ryde (NCN22), existing and proposed housing, Medina College, Medina Leisure Centre, Orchards Hospital and Mountbatten Hospice. A spur links to Cooper Road providing connections to the quiet residential streets beyond. A short spur connects with NC9 and links Medina College directly to the route. Future extension of the route along the former railway line as far as Wootton Bridge would be desirable, creating a high-quality link between the two settlements and providing an improved route for NCN22.

NC2: Pan to Furrlongs

This route links the south and west of the Pan housing estate and the new housing

development off Godric Road with Newport town

NC5

Gunville to Newport town centre

2.7km

NC6

Mountbatten Drive to Petticoat Lane

0.7km

centre and NCN 23. New cycle tracks through Isobel Park and alongside Home Mead and the western end of Furrlongs are proposed. These sections are linked via Garden Way, improved as a Quietway. Junction improvements at St George’s Way provide a safe link on to NC3 next to Matalan. A short spur links the route along Garden Way to the new housing development off Godric Road.



NC3: Shide to Stag Lane

An existing cycle route forming the main north- south route across Newport in need of improvement to reach the standards required to support growth in everyday cycling. Proposed improvements focus on removal of barriers and widening of narrow sections including several narrow bridges, new, safe road crossings and significant improvements to Little London to prioritise walking and cycling. This will make the route more attractive and accessible to ride and facilitate extended use of the route which will form a key link between other routes, connecting with NC1, NC2, NC4, NC5, NC7, NC8, NC9 and

NC10. It also provides onward links to Cowes and Sandown. NC4: Church Litten to Newport town centre

A new route providing safe access to the town centre from areas of housing on the south side of Newport, improving connectivity between NC3 and the town centre and increasing the permeability of the town centre by bike. A new cycle track is proposed alongside Church Litten, with improvements to junctions at Medina Avenue and South Street. A contraflow cycle track along Town Lane allows for two-way cycling in this section, and the east end of Pyle Street is proposed to be converted to a Quietway.

Supporting measures to reduce traffic and improve permeability on surrounding streets would maximise the impact of this route. NC5 Gunville to Newport town centre

This provides a link between Gunville (residential areas and retail developments) and the town centre. This route would utilise Quietway treatment on Fieldfare Road, then a new dedicated cycle track from Purdy Road to Hazel Close, improved existing shared-use path to Foxes Road then Quietway treatment to Newport Harbour, including contraflow cycle track/lane on Crocker Street. A spur alongside Wellington Road provides access to the schools in this area. This route links five schools, multiple residential estates and the town centre. It also connects into NC3 at Newport Harbour for onward links on the


existing and proposed cycle network. NC6 Mountbatten Drive to Petticoat Lane

This proposal is for the improvement and completion of an existing link between a large housing estate and Petticoat Lane, for onward connections to the town centre via NC5. Widening and improvement of existing dedicated and shared use route sections, addition of priority crossings where the route meets roads and a new cycle track to fill in a missing section between St

Augustine’s Road and the Petticoat Lane/ Sylvan Drive junction are proposed. This route links housing with a local primary school and the wider existing and proposed cycle network. NC7: Parkhurst to Newport town centre

This route will provide a high-quality route linking existing and planned housing at Parkhurst; St Mary’s Hospital; employment areas at Riverway and Dodnor; Isle of Wight College and Wakes retail park with the town centre, Newport Harbour regeneration area and other cycle routes.

The route would require new track alongside Medina Way, possibly within hospital land, a safe, convenient crossing of the link between St Mary’s junction and the B&Q roundabout, a new track alongside Medina Way between the Isle of Wight college and Little London, with a safe, convenient crossing of Riverway, possibly in the form of a new bridge and controlled crossing. This route could also provide a key connection to proposed new housing on the Camp Hill site. NC8: Dodnor Lane (north to south)

Part of this route involves the creation of a cycle priority route on a lightly trafficked lane (a rural Quietway) connecting the existing CowesNewport cycle track to the Dodnor and Riverway industrial estates. The second part involves the construction of a new cycle track along the west side of the more heavily trafficked part of Dodnor Lane between Sevenacres and the B&Q roundabout.

This route offers a high-quality link between St Mary’s Hospital and the CowesNewport cycle track and provide key connectivity between routes NC3 and NC7 and various parts of the employment area. It also connects housing to the north of


Newport to Cowes and ferry services to the mainland.

NC9: Medina College/1Leisure Medina to Newport town centre

Improvements to this sub-standard cycle route are proposed to include widening, surfacing and improved crossings and creation of a Quietway section along Newport Quay. This would be accompanied by a short extension to provide a safe onward link to Fairlee Road and NC1 using a combination of new two-way cycle track and improvements to the car park access road including a contraflow cycle track. This route provides a key link between the town and Medina College (secondary school) and 1Leisure Medina, improved sustainable access to Seaclose Park and connectivity to the Newport Harbour regeneration area. It also forms part of the link to Island Harbour (proposed to continue to East Cowes in the future).

NC10: Cross Medina route

This ambitious new route offers a valuable new connection across the River Medina providing key east-west connectivity and linking NC1, NC9 and NC10. The route involves improvements to the Seaclose/Fairleee Road junction to provide a safe cycle crossing, creation of a two-way cycle track alongside the Seaclose access road, construction of a new walking/cycling bridge across the Medina and improvement of the existing cycle link between NC3 and Riverway to create a link to the employment area here and Isle of Wight College. It also links the two National Cycling Network routes NCN 22 and NCN 23.

The figure on the oppostie page shows the proposed strategic routes for cycling in Newport.

Ryde cycling network: route proposals

The cycle routes which are to be taken forward for prioritisation are discussed in this section, with accompanying maps and intervention costs in Appendix C.

An overview of the routes is highlighted in the in the table below :


Code


Route name

Route length

image


RC4

Smallbrook Lane to Ryde Esplanade


1.9km

RC5

Great Preston Road to Ashey Road

1.0km

RC1 Tesco to Ryde Esplanade 2.2km RC2 Appley Road        0.6km RC3 Puckpool to Ryde Interchange 1.9km


RC6 Binstead to Ryde Interchange 2.5km


image


Route summary

RC1: Tesco to Ryde Esplanade

This route links Ryde Esplanade with large areas of housing at Elmfield and Bullen Village, Westridge Business Park and Tesco. It also provides connectivity to the proposed Pennyfeathers and Hope Road housing developments. The route requires a new twoway cycle track along Brading Road, and a shared use route alongside Marlborough Road where available width is restricted. Junction remodelling is required at Bullen Cross and the Appley Road mini- roundabout. From Appley Road the route would use the existing traffic-free link to the esplanade, upgraded as required. The route then joins RC3 for onward connection to Ryde Transport Interchange (trains/ferries/buses) and town centre.

RC2: Appley Road

This short route connects residential estates to the east of Ryde into RC1 for onward trips towards Tesco or the Esplanade and provides a safe route to



Newport cycling network

image

© openstreetmap.org contributors & opendatacommons.org


Oakfield primary school. The route runs adjacent to various areas of proposed future housing development. It requires creation of new sections of shared use route linked by a Quietway along Seldon Avenue. The links between the shared use sections and quietway will need to ensure a

seamless connection and avoid cyclists being interrupted by side roads that cross the route.

RC3: Puckpool to Ryde Interchange

This route follows the seafront and involves the improvement and extension of an existing route to provide a high-quality route from Puckpool to Ryde Transport Interchange (trains/ferries/buses)


and town centre. This route plays an important role in interconnecting several other routes (RC1,

Local cycling and walking infrastructure plan Isle of Wight (Newport and Ryde) 2020 to 2030


RC4 and RC6), provides a route for people passing through Ryde, links with the interchange and forms part of an important tourist cycle route along the north coast. It lays the foundation for further extension to Seaview, St Helens and Bembridge. New cycle track takes the route through Puckpool Park onto the existing shared use route which will be improved with a particular focus on minimising conflict between people walking and cycling. From the end of the current route to the transport interchange a new cycle track is proposed using excess carriageway width. RC4: Smallbrook Lane to Ryde Esplanade

A new route using a mixture of dedicated off- road routes and quiet streets. This route links the esplanade with housing at Oakfield, St John’s Station, Nicholson Road industrial estate, proposed housing at Rosemary Vineyard and Pennyfeathers and the Nicholson Road regeneration area. The southern section utilises an existing bridleway, which requires upgrading to allow all-weather cycling. Most of the remainder of the route is on local streets proposed for Quietway treatment. Ideally the route will pass through what is current a BT depot between Park Road and Rink Road; it may be possible to achieve this as part of a redevelopment of this area. Alternatively, a less direct and hillier route could be provided on existing roads. The route passes through Simeon Street Recreation Ground, where the existing path built alongside the flood containment wall requires widening to allow shared use.

RC5: Great Preston Road to Ashey Road

This route provides an important orbital link for the cycle network and will reduce community severance caused by the railway line. It requires the upgrade of an existing lane and bridleway to create an all-weather route providing an eastwest link to the south of Ryde. It opens up new cycling possibilities between residential areas, employment opportunities and schools either side of the railway line. The route directly links into the planned Nicholson Road regeneration area.

Surfacing upgrades are needed along the length of the route along with a bridge over the railway line to replace the current open level-crossing. RC6: Binstead to Ryde Interchange

Part of this route is already recognised as NCN22 but requires upgrading. The rest of the route requires the construction of new cycle tracks.

The route links the large Binstead residential estates with the town centre and Ryde Transport Interchange (trains/ferries/buses). It provides safe links to several schools near the route. The western end of the route is proposed be created on an existing bridleway and highway verges.

Binstead Road (the A3054) requires realignment to allow creation of a cycle track alongside, and a safe crossing of the main road is also proposed. From Spencer Road to the town centre the route follows lightly trafficked roads where a Quietway is recommended.

image

The figure on the next page shows the proposed strategic routes for cycling in Ryde.



image


Ryde cycling network

image

© openstreetmap.org contributors & opendatacommons.org



image


Stage 4 – network

planning for Walking

This chapter provides an overview of how a network plan for cycling has been determined. The initial stage is to consider where the propensity for walking exists, and where targeted investment in infrastructure can generate more journeys on foot. This task was advanced through a series of sequential stages of evidence gathering, analysis and options development. This has involved the following steps:

Identifying and clustering trip origin and destination points.

Establishing walking routes and core walking zones (CWZs).

Auditing the main routes and identifying barriers.

image

25

The key output for Stage 4 is a proposed future walking network map, detailing preferred walking routes and core walking zones for

further development. Routes and zones which were not to be of sufficient quality to meet the needs of people who would wish to travel by foot, were mapped and taken forward to develop a programme of walking infrastructure improvements.

The walking elements of the LCWIP has been developed in consultation with key stakeholders to ensure views have been captured. The consultation process and the development of the LCWIP has been informed by stakeholder feedback, reviewing existing data (eg, Rights of Way Improvement Plan) and key movement data sources.

A number of engagement/consultation meetings were coordinated with key stakeholders across a number of months in 2019 to help shape the priorities contained within the report.


Information contained within school and business active travel plans were reviewed during the route selection process, including current modes of transport.

Stakeholder workshops were held in Newport and Ryde in March 2019 as follows: • Wednesday 27 March: Walking, Ryde Thursday 28 March: Walking, Newport

The objectives of the workshops were to: introduce the LCWIP process to a broad range of local stakeholders;

review movement data;

agree key origins and destinations per town – considering population clusters, regeneration sites, businesses, commuting routes, education routes, and tourist links;

share initial proposals for cycling and walking networks in Newport and Ryde which should be progressed for auditing;

utilise local knowledge and experience to refine the cycling and walking proposals.

Organisations represented at workshops included: Ryde Town Council

Ryde Regeneration Working Group, comprising: Ryde Business Association

Isle of Wight Council Ryde Society

Shaping Newport steering group Newport and Carisbrooke Parish Council



Isle Access: a user led charity committed to encouraging and promoting greater accessibility and inclusion for people on the Isle of Wight Isle of Wight Ramblers

Tourism businesses CycleWight

Separate consultation was undertaken with the IW Ramblers in relation to aligning the core principles of the LCWIP with ROW network.

Ryde and Newport Regeneration groups were heavily involved in the development of the routes and actively engaged in stakeholder workshops. The LCWIP network routes were focused on aligning with both Ryde and Newport regeneration priorities, especially links to Newport Harbour and Ryde Nicholson Road redevelopments.

Consultation workshops focused on a number of key routes from the core walking zones (Town Centres) to key destinations. (key regeneration, economic, tourist and education zones)

Consultation groups reviewed and considered existing plans including, Rights of Way improvement plans, Cycle Forum Strategies, and emerging Regeneration Plans.

Routes used by pupils to travel to and from school/college were considered in the scoping of the plan. Some routes have been identified to help pupils move towards a more sustainable mode of transport to school. Schools in Ryde and Newport were consulted and where safe route to school travel plans identified. (Dft Access Fund)

Routes identified were prioritised against a number of key criteria – scheme feasibility and design, road safety, accessibility and community benefit, value for money and potential to attract external funding (linking to existing regeneration plans).

More detailed and comprehensive consultation with stakeholders and the local community will be required as and when schemes come forward for development.


Appendix D and E provides the full details of each of the walking routes, covering both existing conditions and identified walking infrastructure improvements. The appendix includes proposed interventions which set out a list of schemes required to make the route attractive and usable. The list includes:

Scheme type: the type of intervention proposed, eg, footway creation, footway widening etc.

Description: a short description of the proposed intervention.

Route map.

Indicative cost: Costs provided are based on standard costings from a number of local authority reference sources and make significant assumptions. These should only be seen as a very approximate idea of costs for any scheme, and as such an optimum bias of +/- 28 per cent should be assumed. Individual schemes are costed independently, but when several schemes are delivered together costs may be significantly reduced.

Deliverability: Deliverability has been ranked on a scale of one (complex) to five (easy). Generally, scores of three to five suggest highly deliverable schemes while score of one or two suggest significant technical or legal issues would need to be addressed to enable delivery. A score of one or two should not mean a scheme is not considered, rather that its delivery will be more complex.


Identifying key walking routes and core walking zones

The CWZs represent the focal points for pedestrian journeys within Newport and Ryde, therefore the important walking routes that serve the CWZs have been identified and mapped.

A total of eight routes were identified for Ryde and 13 for Newport from key residential areas surrounding the CWZ.

As recommended by the DfT, only walking routes within 2km of the CWZs have been included


because the proportion of journeys made on foot decreases significantly beyond this distance.

Following the mapping of the Key Walking Routes, the next step was to prioritise the routes.

Category Name Description

As recommended by the DfT the routes were prioritised using the following definitions:


Primary Busy urban shopping

  1. Walking and business area, and Routes   main pedestrian routes


    image

    Medium usage routes Secondary through local areas


    3 Link Footways

    Linking local access footways through urban areas and busy rural

    footways.

    Local

    4 Access

    Footways

    Footways associated with low usage, short estate road to the main roads and cul-de-sacs.

  2. Walking feeding into primary Routes routes, local shopping centres etc.


image


Route


Route Name


Score


Maximum

Percentage Score (%)

NW1

Halberry Lane to Newport Quay

27

34

79

NW2

Wellesley Way (Pan) to Coppins Bridge

21

43

63

NW3

Furrlongs to St George’s Way

29

34

85

NW4

St John’s Rd to Medina Ave

23

34

68

NW5

Carisbrooke Rd to town centre

15

40

38

NW6

Mountbatten Drive to Sainsbury’s / Mill St

27

34

79

Following the classification of the key route network hierarchy, specific route corridors were


image

image

then identified for auditing. Typically, these are the primary and secondary walking routes as these are expected to have the highest demand for walking trips and are the busiest local routes, based on the definitions above.

The primary walking routes identified for auditing were discussed and agreed with stakeholders

during a workshop. Stakeholders were asked to review the trip attractors mapped in the data gathering process and identify any key origin and destination points that were missing from the plan.


Route selection and auditing

The LCWIP Technical Guidance recommends the use of the Walking Route Audit Tool (WRAT) tool for auditing potential walking routes. The primary function of the WRAT is to assess the current condition and suitability of a walking route. The WRAT has been used during site visits as a reporting mechanism to ensure that the following criteria are considered:

Attractiveness Comfort Directness Safety Coherence

The criteria and scored using the following scale:

  1. for poor provision;

  2. for provision which is adequate but should be improved if possible;


  3. for good quality provision.

WRAT scores are presented below. Note that not all routes have all features in the scoring matrix (for example, controlled crossings) so the maximum possible score for each route varies, so percentages of maximum give a more realistic benchmark.



image

image

image

A summary of the walking routes is identified below:



Route


Route Name


Score


Maximum

Percentage Score (%)

NW8

Dodnor Lane/Monks Brook to B&Q roundabout (junction with NW7)

16

36

44

NW9

Fairlee Rd/Medina College to Newport Quay

23

34

68

NW10

Cross Medina Route




NW11

Little London

15

34

44

NW12

Riverway

22

36

61

NW13

Wellington Road

30

36

83

RW1

RW1: Tesco to Appley Road

19

40

48

RW2

Appley to top of High Street

13

40

33

RW3

Monkton St to Esplanade

21

34

62

RW4

Smallbrook Lane to St John’s Rd

20

34

59

RW5

Upton Rd to south end of High Street

23

38

61

RW6

Binstead Hill to Ryde town centre

14

40

35

RW7

Binstead estate to Ryde town centre

18

40

45

RW8

Pellhurst Rd to Ryde Golf Club

26

40

65

image

image

image

image

The DfT LCWIP guidance states that where routes score less than 70 per cent, interventions should be identified to improve the pedestrian environment. The following chart shows which routes fall below 70 per cent and this assessment has helped us identify appropriate interventions on the walking network.


These interventions are described in the text below with further details in the Appendix F.

Newport walking routes

image

image

WRAT audit scoring


image image image

image

The walking routes which are to be taken forward for prioritisation are shown in the figure below and discussed in this section, the accompanying maps and intervention costs in Appendix D.


Route summary

NW1: Halberry Lane to Newport Quay

This route connects a large area of existing housing in north east Newport with the town centre. There are also housing developments planned on the edge of north east Newport that would be connected by this route. It connects with the proposed NW10 Cross Medina walking route for access to large employment areas on the west side of the Medina River. Other amenities that are linked by it are Medina Leisure Centre and Theatre, Medina College (secondary school) and Mountbatten Hospice. The route largely follows an existing traffic free pathway (an old railway track) and will benefit from improved surfacing and lighting, which constitute the main proposals for its upgrade.

NW2: Wellesley Way (Pan) to Coppins Bridge

Route NW2 links residential areas to the east of the town centre with the main pedestrian crossing


point into the core walking zone. Key services and destinations along the route are Barton Primary School and early years/ community centre, a playing field, parade of local shops and the post office. A mixture of schemes are proposed, ranging from improved crossings over side roads and footway widening to two key junction redesigns. The larger of these at the Furrlongs/Royal Exchange junction will entail the creation of a pedestrian plaza in front of the shops, rationalise parking arrangements and street clutter and improve crossing facilities to the school/community centre. NW3: Furrlongs to St George’s Way

In addition to NW2, this route forms the other main walking artery into Newport town centre from housing estates on the east of the town, including the new and expanding Pan Meadows development. Numerous pedestrian alleyways and paths feed into this route from either side and the route crosses NW2 at the junction of Furrlongs/Royal Exchange mentioned above. It enters Newport town centre at the site of a retail/leisure complex. The main challenges at present are to do with poor pedestrian priority



when crossing side roads along the length of the route. Many side roads are relatively minor, so the implementation of numerous continuous footways and raised tables is proposed. Where the route meets the edge of the core walking zone at St George’s Way, a junction re-design is required to make the crossing of this busy road safe, convenient and comfortable.


NW4: St John’s Road to Medina Avenue

This short route has been chosen because it represents the most direct line into the core walking zone from the south of the town. Other surrounding residential streets do not afford straight line access into the town centre and so feed into this route, which culminates on the edge of the retail area, at the Island Innovation Sixth Form College and a short walk from the bus station. It runs through an older residential part of the town and so suffers from absent/narrow footways in places and some stretches that are an impediment to people with restricted mobility.

Proposals include footway widening and levelling out some steep inclines, as well as improved pedestrian priority through raised tables, tighter junction geometry and continuous footways at side roads.

NW5: Carisbrooke Road to Newport town centre

This route follows the alignment of the busy B3323 road. It is the most direct route into the town centre from Carisbrooke and pedestrians from surrounding streets funnel into it. Coupled with the spur route of NW13 (see below) this route connects large residential areas, two secondary schools (Carisbrooke and Christ the King), two primary schools (Carisbrooke Church of England and St Thomas of Canterbury) and


Newport walking network

image

© openstreetmap.org contributors & opendatacommons.org


a doctors’ surgery. Traffic dominates this route and conditions for pedestrians are poor. Existing junction designs at the principal junctions on the route are geared towards speed of entry/ exit for motorists and make for dangerous and intimidating crossing conditions. Major re-designs of these have been proposed, along with smaller schemes to improve priority across more minor roads and widen footways where possible.

NW6: Mountbatten Drive to Sainsburys/ Mill Street

This route links a series of modern housing estates in the west of Newport with the town centre. The planned route uses a combination of

an existing unsurfaced rural footpath, lightly trafficked and often traffic-calmed roads, as well as some traffic-free pathways that run between housing developments. The main improvements required along the route involve upgrading the rural public footpath; prioritising pedestrians over vehicles at side roads and at entrances to driveways by installing continuous footways and uncontrolled crossings; improving some pathway widths and providing lighting along pathways with low levels of natural surveillance. NW7: Parkhurst to Newport town centre

This route runs from the northern outskirts of Newport to the town centre. It has potential to be a major active travel corridor as it links a series of large employers and trip generators: the prison, existing housing, proposed new housing at Camphill, St Mary’s Hospital, numerous employers at the nearby industrial estates, the



Isle of Wight College, the Wakes retail park and the Newport Harbour regeneration area.

Upgrading this route will provide much needed pedestrian connectivity between these sites and the town centre, helping to reduce traffic congestion in the area. The route runs next to busy roads and crosses a number of side roads and two major junctions. A high-quality shared use route is proposed along its length and is possible given the available verge space. A three metre wide route is proposed, along with safe, convenient crossings of the two major junctions, possibly including a new bridge over Riverway.

NW8: Dodnor Lane/Monks Brook to B&Q roundabout

This route connects St Cross Business Park, Dodnor Park Industrial Estate and the eastern side of the St Mary’s Hospital site into route NW7 for travel onwards into the town centre. It has relatively high levels of vehicle traffic, especially at rush hour. It joins route NW7 by the B&Q store at what is currently a busy roundabout with very poor pedestrian crossing facilities and high vehicle approach speeds. Proposals for this route include redesigning the B&Q roundabout, installing a zebra crossing and a whole new section of footway adjacent to the hospital where there is currently none despite clear evidence of pedestrian desire lines where the grass verge is currently being used.

This figure on the previous page shows the proposed strategic routes for walking in Newport.


Ryde walking routes

The walking routes which are to be taken forward for prioritisation are shown in the figure below and discussed in this section, the accompanying maps and intervention costs in Appendix E. The following information shows the proposed strategic routes for walking in Ryde.

Route summary

RW1: Tesco to Appley Road

This route links Tesco, Westridge Business Park, existing residential areas at Elmfield and Bullen Village, the proposed Pennyfeathers and Hope Road housing developments and Oakfield School. It connects into RW2 for journeys towards the Esplanade, Ryde Transport Interchange (trains/ ferries/buses) and town centre. While traffic levels restrict the attractiveness of this route, it provides a direct option for utility journeys. Proposals iinclude modification of junctions at Bullen Cross and Appley Road to provide safe crossings and provision of continuous footways across all minor road junctions to provide pedestrian priority for much of the route. Localised widening would ensure adequate footway width is provided for the whole length, some sections of which are well below standard. RW2: Appley to top of High Street

While this route is unlikely to be walked in its entirety, it is heavily used for shorter sections linking other routes and a range of local amenities (Oakfield School, local shops, Ryde St John’s rail station) and the southern end town centre. The road has a significant severance effect, with heavy traffic volumes creating a barrier to north-south pedestrian movements. Proposed improvements include: footway widening around Oakfield School to accommodate high peak footfall and provide a safer environment; modifications to major junctions to reduce vehicle speeds and reduce crossing distance; continuous footway across many of the minor road junctions to improve pedestrian priority; creation of new crossings of the main road and introduction of a 20mph limit on part of the route to reduce the severance effect.

RW3: Monkton Street to Ryde Esplanade

This route is the most direct conduit for pedestrian traffic between the south of the town and the seafront, other than through the central walking zone. It connects into route RW2 and links large areas of housing, Ryde


St John’s rail station, the Esplanade and Ryde Transport Interchange (trains/ferries/buses). It carries substantial vehicular through-traffic and a frequent bus service. It is characterised by substandard pavement widths in places and poor pedestrian priority over minor side roads, hence proposals for localised footway widening and a series of continuous footways. At its northern end a small areas of shops/cafes/pubs has potential to become a neighbourhood focal point. Proposals are included for streetscape improvements that would foster a sense of place and diminish the impact of through traffic.

RW4: Smallbrook Lane to St John’s Road

This route serves existing housing at Oakfield, St John’s rail station and the Nicholson Road Industrial Estate. There are also a number of proposed new developments that would be connected by the route, namely new light industrial units/offices, a doctors surgery, and housing at Rosemary Vineyard and Pennyfeathers. Construction of almost 1km of

paved route and street lighting along an existing bridleway is proposed, along with home zone and shared space-style schemes on a short stretch of the residential Meaders Road at the north end of the route.

RW5: Upton Road to south end of High Street

Upton Road is a radial route linking large areas of housing on both sides of it with the town centre. School children from two local schools, Haylands Primary and Ryde Academy (Secondary), use part of the route in large numbers. Ryde Medical Centre is also on the route. There is footway on only one side along large sections as well as sub- standard pavements widths and junction geometry that hinders safe crossing. Proposals include extensive footway widening, continuous footways, raised tables, footway ‘build outs’ to create pedestrian passing places/traffic calming features. At the northern end where a parade of shops is located the proposal is to remove some on street parking and create more space for pedestrians to encourage a sense of place and dwell time for shopping.

RW6: Binstead Hill to Ryde town centre

This route connects large areas of housing in west Ryde and Binstead with the town centre, the Esplanade and Ryde Transport Interchange (trains/ferries/buses). Ryde School (secondary) is also located on the route. Part of the route follows the Coastal Path, an important recreational facility for local residents and visitors. The westerly section of the route follows the busy A3054 road. Opportunities for footway widening are limited so many proposed interventions focus on pedestrian priority at side roads. Major schemes include junction remodelling and signalling at Binstead Rd/Ringwood Rd mini-roundabout and 300 metres of carriageway realignment to enable footway widening.

RW7: Binstead estate to Ryde town centre

At its western end is the large area of housing on Binstead Estate. From there the route connects with one local primary school (Greenmount) and two secondary schools (Ryde Academy and Ryde School) and continues on to the town centre.

Narrow footways and poor junction geometry hinder pedestrian movement, but space exists to widen footways and re-design junctions to prioritise pedestrians. Existing mini-roundabouts encourage traffic to cross junctions at speed so new T-junctions and raised tables are proposed. At the east end of the route two major junction remodelling schemes are proposed at Queens Road/Mayfield Road and at Queens Road/West Street. Removal of guard railing, narrowing of traffic lanes, shortening of pedestrian crossing points and improved pedestrian desire lines are all proposed.

RW8: Pellhurst Rd to Ryde Golf Club

This route is the only one in Ryde that doesn’t link directly with the core walking zone, but it provides a connector function to three other routes (RW5, RW6 and RW7) that do. As well as its connecting function to those routes, it was selected for treatment because it carries large numbers of school children to Ryde Academy, the main secondary school in the town. It also passes



through housing on either side and connects Ryde Medical Centre. In general, existing footways are of adequate width. The main challenge is to make the crossing of side roads safer and more convenient and so the main recommendations involve a series of continuous footways and raised tables being introduced.

Proposed changes to the major junction at Queens Road/Mayfield Road is addressed under route RW7.

Ryde central walking zone (CWZ)

This area encompasses the main town centre retail area, cinema, library, public transport interchange (bus, train, ferries) and town centre car parks.


Ryde walking network

Recommendations for improvements to streets in the CWZ includes footway widening, removal of through traffic in some streets, use of continuous footway in numerous locations to provide pedestrian priority at minor junctions and new formal crossings. Improvements to the pedestrian zone around the High Street are recommended, as is a comprehensive approach to improving Union Street to make it a more attractive place to spend time and reduce the dominance of parked cars on the historic streetscape.


image

© openstreetmap.org contributors & opendatacommons.org

Stage 5 – action plan

The plan’s objectives are to:

Create and maintain fully connected walking and cycling networks in Ryde and Newport; Supporting the application and delivery of the Transforming Cities Bid, Ryde;

Increase cycling activity, where cycling activity is measured;

Increase walking activity, where walking activity is measured;

Increase the percentage of children aged five to ten that usually walk to school;


Support appropriate training of young people, eg, Bikeability to primary schools;

To increase the percentage of children and young people using active travel modes;

Ensuring future infrastructure designs support the development of healthy and active communities;

image

To promote the Island as walking and cycling destination supporting an increase in sustainable transport, green tourism and regional and national events.

A detailed action plans for cycling and walking routes has been developed (appendix H and G).


Stage 6 – alignment to

local policy and strategies



Policy or strategy

Isle of Wight local cycling and walking infrastructure plan objectives

Local Transport Plan 3 The Local Transport Plan recognises that:

(2011-2038) • for short trips, cycling and walking can achieve journey time reduction over equivalent trips by private car;

The Isle of Wight Local Transport • the Island has an extensive rights of way network including some Plan is known as the Island excellent cycleways linking some of our major towns;

Transport Plan (ITP). Formally • there are considerable health benefits associated with walking adopted by the Isle of Wight Council and cycling and, on an Island where every day journeys are often

on 15 June 2011, it covers the years less than 5km, journeys can be quicker and more conveniently 2011-2038. made by cycle or foot.

Relevant objectives in the ITP include:

Objective B – Maintain and improve journey time reliability and predictability for all road users. Objective C – Protect and enhance the environment and quality of life.

Objective D –Improve road safety and health. Objective F – Promote travel choice.

Rights of Way Improvement Plan

(2018-2028)

Isle of Wight Council

A statutory plan which sets out how improvements made to the public rights of way network.

The Isle of Wight Council recognises the importance of maintaining and improving the network of public rights of way, and the publication of its first Rights of Way Improvement Plan in 2018 has been authoritative in decisions taken over the last ten years. A thoroughly researched document, the 2018 plan provides a detailed analysis of issues relating to the network and the needs of different types of users.

Emerging policies in the plan include:

Policy A: Maintaining a high-quality rights of way network. Policy B: Making improvements to the existing network.

Policy C: Creating new access. Policy D: Promotion.

Supporting the new coastal path when it is introduced across the Island.



Policy or strategy

Isle of Wight local cycling and walking infrastructure plan objectives

Island Plan Core Strategy

(2014-2027)

The Island Plan Core Strategy, the spatial vision for the Island 2027.

DM18: Sustainable travel – the council will support proposals that increase travel choice and provide alternative means of travel to the car. Development proposals will be expected to contribute to meeting the aims and objectives of the Isle of Wight Local Transport Plan.

Isle of Wight Council Corporate Plan (2019-2022)

The corporate plan, the priorities it sets and the outcomes it seeks are designed to achieve the council’s vision.

The council’s corporate plan (2019-2022) has recently been updated to put wellbeing being at the heart of the council’s agenda.

Relevant outcomes include:

people have healthy lifestyles that avoid the need for service intervention;

an improved planning framework that promotes business growth; a well-connected transport system.

Health and Wellbeing Strategy

(2018-2021)

Isle of Wight Council

Sets out the key priorities and focus of work for the organisation’s involved in the health and wellbeing board. Walking and cycling to improve health and wellbeing is a critical benefit when designing new and improved routes. The recently produced report ‘Spatial Planning for Health’ by Public Health England highlights the importance of resource planning and design to create healthier communities.


Climate and Environment Strategy

(2020-2030)


image

The Climate Change and Environment Strategy sets out undertakings to reduce the Isle of


image

Wight Council’s carbon footprint.

road and public rights of way

Data from the Sport England 2017/18 Active Lives survey shows that almost two out of three (62.3 per cent) adults on the Isle of Wight are classified as overweight or obese with 16.1 per cent classified as ‘physically inactive’. This is in line with our comparator authorities.

Cycling and walking have been linked to many health benefits both physical (reduced risk of coronary heart disease, cancer, stroke and Type 2 Diabetes) and mental (improved concentration, better memory function, reduction in anxiety, stress and depression).

National Institute for Health and Care Excellence (NICE) guidance suggests that active travel can help boost mental wellbeing, with those who travel on foot or cycle benefitting from improved mental wellbeing in comparison with those who travelled by car.

People make healthy choices for healthy lifestyles.

The Isle of Wight is a better place to live: The Isle of Wight is well known for the quality of its environment with extensive

network providing access to the countryside by bike and on foot.

Actions to protect and enhance the Island natural environment by managing land sustainably and connecting people with the environment.


Reduction of transport emissions (25 per cent) by promoting cycling and walking.



Policy or strategy

Isle of Wight local cycling and walking infrastructure plan objectives


Transport Investment Plan

(May 2016)

Solent LEP

Investment framework for planning and delivery of strategic transport across all modes in the Solent.

Recognises that there are a number of transport issues on the Isle

of Wight which affect its economic performance, including cross Solent connectivity and congestion in and on approach to Newport. There is also recognition that support for active modes schemes form a key part of local transport initiatives.

CycleWight Cycling Strategy

(2017)

CycleWight

The draft cycling strategy includes a section on improving cycling infrastructure and presents the following principles:

Principle 1

A network of high quality routes will be completed throughout the Island, providing convenient and safe access for utility and leisure cycling.

Principle 2

Wherever possible measures will be provided which give people who cycle priority over motorised traffic in terms of accessibility and journey time.

Isle of Wight Council Regeneration Strategy

The 2019-2030 Regeneration Strategy for the Isle of Wight sets out how the council is leading the agenda to ensure the economic future of the Island and create the Island that is a great place to grow up, live, work and visit. The strategy sets out the actions and activities we believe will enable the vision for the future to be realised.

Specific links to the LCWIP include the Transforming Cities programme in Ryde, Nicholson Road development in Ryde and Newport Harbour regeneration proposals have been made

Shaping Newport

A collaboration between the Isle of Wight Council, Newport Parish Council and Newport Business Association, set out to ask the people of the county town for their experiences and opinions of the place, its positives and negatives.


Local cycling and walking infrastructure plan

l')lt:' uf i.'V.07 ( - .. p01 ell U r\ \ ~e, - 2u-2u30


image

image

       w.

41

image

If you have difficulty understanding this document, please contact us on 01983 821000 and we will do our best to help you.

46lSNBH 3/20 SC


image

APPENDIX A

Network Planning Maps

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030


image


Supporting Network Planning Maps


The range of data maps contained within this appendix helped identify the key cycling and walking routes

Newport Origins by Type:


The map displays the distribution of the origin points within a buffer of a radius of 5km from the town centre. This buffer considers a “cyclable” distance of 5km. The origins are represented by the LSOA Population Weighted Centroids and the future developments considered within the analysis (those of over 100 units in size only)


image


image



Ryde Origins by Type:


The map displays the distribution of the origin points within a buffer of a radius of 5km from the

image

town centre. This buffer considers a “cyclable” distance of 5km. The origins are represented by the LSOA Population Weighted Centroids and the future developments considered within the analysis (those of over 100 units in size)





Newport ODs:


image

The map shows the different kinds of origins and destinations located within the study area. The origins are represented as a single group with a red dot, while the destinations are illustrated with an orange/yellow dot for Employment Areas and Town Centres, and a blue dot for all other destinations.




image



Newport and Ryde ODs and Weighted Desire Lines:


The map displays the origins and destinations represented in the previous map together with the Weighted Desire Lines. These lines illustrate the paths between the origins and destinations drawn as straight lines. The Desire Lines are drawn using the following parameters:

Origins: LSOA Population Weighted Centroids and future developments with 100+ dwellings were given a weight based on their estimated population. LSOA PWC population was obtained from the ONS 2016 estimates. Future development population was estimated by multiplying the number of units by 2.4 in line with ONS recommendations.


Destinations: destinations were given a weight based on their type.

Key employment areas – the weight applied was based on the estimated number of jobs. This was calculated by halving the area of the building footprint to give an estimated usable floorspace. 1 job was assumed for every 30m2.

Town centres – each town centre was given a value from 1 – 10 representing its attractiveness, ie. a major town centre would be given a value of 10, a local or district centre would be given a lower value.

All other types of destinations were treated equally.


For key employment areas and town centres, desire lines were drawn all to all, ie. from each origin point to each key employment area point and from each origin point to each town centre point. The desire line retains a weight based on how the weights of the point are distributed, which reflects theoretical trips. The assumption behind this is that people may not work in their closest employment area, and are likely to travel to different town and local centres depending on the facilities offered.


For all other destination types, a desire line was drawn from each origin to the closest of each type. The assumption behind this is that people are likely to only travel to their closest for example library or leisure centre.


image


image




image

image



Newport Weighted Desire Lines and Clustered Desire Lines:

image

The map illustrates the Weighted Desire Lines together with the Clustered Desire Lines. The Clustered Desire Lines derive from the Weighted Desire Lines and represent the main potential cycling flow between origins and destinations (see Clustering LCWIPs document for further detail).





Proportion of adults that cycle for travel, by frequency (2017-2018)


image

image

image

image

image

image

Proportion of adults that cycle for travel, by frequency


Five times per week Three times per week

Once per week Once per month

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0


Isle of Wight South East ENGLAND

The chart below shows the proportion of Isle of Wight adult residents which cycle for travel across four frequency criteria. Cycling for travel refers to cycling from place to place, e.g. from home to work. The chart shows that cycling five times per week, or three times per week, at 2.1% and 3.5% respectively, is higher than the data for England as a whole, but slightly slower than the data for the south east. The proportion of adults cycling less frequently, once a month or once a week, is lower than the equivalent data for both the south east and England as a whole.



Proportion of adults that walk for utility purposes, by frequency (2017-2018).

The chart below shows the proportion of Isle of Wight adult residents which walk across four frequency criteria. Walking for travel refers to walking from place to place, e.g. from home to a place of employment. The proportion of Isle of Wight residents walking five times a week (18.2%) or three times a week (23.6%) is higher than the both the south east and England as a whole. The proportion walking at least once a month (86%) is significantly higher than the equivalent frequency for the south east (81.5%) and England as a whole (78.2%).



image

image

image

image

image

image

Proportion of adults that walk for travel, by frequency


Five times per week Three times per week

Once per week Once per month Once per month

0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0


Isle of Wight South East ENGLAND

Ryde Weighted Desire Lines and Clustered Desire Lines: the map illustrates the Weighted Desire Lines together with the Clustered Desire Lines. The Clustered Desire Lines derive from the Weighted Desire Lines and represent the main potential cycling flow between origins and destinations (see Clustering LCWIPs document for further detail).


image


Ryde ODs: the map shows the different kinds of origins and destinations located within the study area. The origins are represented as a single group with a red dot, while the destinations are illustrated with an orange/yellow dot for Employment Areas and Town Centres, and a blue dot for all other destinations




image


image

APPENDIX B

Network Cycling Routes

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030


image


Newport Cycling Network: Route Proposals

NC1 Mews Lane to Newport Quay

Route Description

This route involves the Improvement of an existing sub-standard former railway line route to allow all-weather cycling, improve convenience and comfort and strengthen links with local residential areas. Improvements proposed include surfacing, widening and lighting of the route. It connects with the cycle route to Wootton/Ryde (NCN 22), existing and proposed housing, Medina College, Medina Leisure Centre, Orchards Hospital and Mountbatten Hospice. A spur links to Cooper Road providing connections to the quiet residential streets beyond. A short spur connects with NC9 and links Medina College directly to the route. Future extension of the route along the former railway line as far as Wootton Bridge would be desirable, creating a high-quality link between the two settlements and providing an improved route for NCN22.

Route Map


image


image

image

Former rail line parallel to Fairlee Road

Image X: Former rail line parallel to Fairlee

Road



Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1

Improvement of existing shared-

use track

510m of new 3m wide, 2-way cycle track along old railway line route. Addition of

lighting.

Mews Lane to Halberry Lane


£183,000


5

2


New cycle track

50m of 2.5m wide shared use route linking Fairlee Rd with old railway line route almost

opposite Medina College entrance

Fairlee Rd/Medina College access

road


£15,000


3

3

New cycle crossing

Toucan crossing across Fairlee Rd linking the

spur from the old railway line route with Medina College and leisure centre.

Fairlee Rd/Medina

College access road


£62,000


4

4

New cycle

crossing

Raised table, uncontrolled crossing at junction

of Halberry Lane.

Halberry Lane /old

railway line jct

£15,000

5

5


New cycle track

Removal of barriers at both ends of track and

drop kerbs at either end of lane that is already 3m wide but currently peds only

Between Cooper

rd and Halberry Lane.


£8,000


4

6


On road improvements


185m of Quietway treatment. Creation of seemless links to other portions of route

Length of Gordon Rd between Halberry Lane and old railway line

route


£18,500


5

7

Improvement of existing shared- use track

580m of new 3m wide, 2 way cycle track along old railway line route. Addition of lighting.

From junction of Halberry Lane /old railway line to St

Paul's View Rd


£210,000


5

8

Improvement of existing shared- use track

Re-grading of slope and re-aligment of track on the approach to the old railway tunnel in order to reduce cyclists' speed and potential

for pedestrian conflict

Slope down to old railway tunnel when approaching

from east


£30,000


4

9

Improvement of

existing shared- use track

Removal of chicane barrier at entrance to tunnel


Old railway tunnel


£2,000


5

10

Improvement of existing shared-

use track


Upgrade lighting in the tunnel


Old railway tunnel


£15,000


5

11

Improvement of existing shared- use track

100m of new 3m wide, 2 way cycle track. Creation of seemless link to next portion of route.

West end of railway tunnel to Riverside Centre

car park


£30,000


5

12

On road improvements

100m of Quietway treatment. Creation of seemless links to other portions of route

Riverside Centre

car park to the quayside.


£10,000


0


NC2: Pan to Furrlongs

Route Description:


This route links the south and west of the Pan housing estate and the new housing development off Godric Road with Newport town centre and NCN 23. New cycle tracks through Isobel Park and alongside Home Mead and the western end of Furrlongs are proposed. These sections are linked via Garden Way, improved as a Quietway. Junction improvements at St George’s Way provide a safe link on to NC3 next to Matalan. A short spur links the route along Garden Way to the new housing development off Godric Road.

Route Map


image


image

image

Junction of Pan Lane and Home Mead

Looking west along Garden Way


Route Selection Tool Assessment


image

Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


New cycle track

160m of new 3m wide, 2 way cycle track.

Creation of seemless link to next portion of route.

West side of

Isobel Park linking with Garden Way

£48,000


5

2

On road improvements

210m of Quietway treatment. Creation of seemless links to other portions of route

Garden Way to Pan Lane

£21,000

5

3


New cycle track


50m of new 3m wide, 2 way cycle track. Creation of seemless link to next portion of route.

Between Garden Way and new housing development off

Godric Road


£15,000


5

4


New cycle track


440m of new 3m wide, 2 way cycle track using highway verge. Creation of seemless link to next portion of route.

From Pan Lane, using highway verge alongside Homemeade to Furrlongs and then down to St George's Way

A3020.


£132,000


5

5

Junction improvement

Remodelling of junction to give priority to people cycling and walking

Jct of Furrlongs

and St George's Way


£200,000


4

6


On road improvements


75m of Quietway treatment. Creation of seemless links to other portions of route

Jct of Furrlongs and St George's Way to the jct of

NC3 (aka NCN23)


£7,500


5


NC3: Shide to Stag Lane

Route Description


An existing cycle route forming the main north-south route across Newport in need of improvement to reach the standards required to support growth in everyday cycling. Proposed improvements focus on removal of barriers and widening of narrow sections including several narrow bridges, new, safe road crossings and significant improvements to Little London to prioritise walking and cycling. This will make the route more attractive and accessible to ride and facilitate extended use of the route which will form a key link between other routes, connecting with NC1, NC2, NC4, NC5, NC7, NC8, NC9 and NC10. It also provides onward links to Cowes and Sandown.

Route Map


image



image

image

Bridge at Pan Mill Meadows

Little London, looking north



Route Selection Tool Assessment

image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1

New cycle

crossing

Install parallel zebra crossing across Shide Rd

Shide Rd and

NCN23

£30,000

5

2

Improvement of existing shared-use

track


Removal of bollards at entrance to Shide Path. Drop kerb installed.


Shide Path/Shide Lane jct.


£4,000


5

3

Improvement of existing shared-use

track


Removal of staggered barriers on Shide Path.


Shide Path


£2,000


5

4

New cycle bridge

Installation of 3m wide bridge to replace the existing 1.5m wide bridge

Where NCN23 crosses River Medina in Shide


£15,000


3

5

Improvement of existing shared-use track


Removal of guard railing where NCN23 meets St George's Way opposite Newport Football Club.

Where NCN23 meets St George's Way opposite Newport Football

Club.


£2,000


5

6

New cycle bridge

Installation of 3m wide bridge to replace the existing narrow bridge.

Where NCN23 crosses Pan

Stream


£15,000


3

7


New cycle track

50m of new 3m wide, 2 way cycle track

creating a link from NCN23 to St George's Approach up the embankment.

Jct NCN23 and St

George's Approach


£15,000


4

8

Improvement of existing shared-use

track


New cantilevered cycle track decking under bridge to provide 3m width

Under bridge at St George's Approach


£30,000


3

9

Improvement of existing shared-use

track


Installation of flush kerb for cyclists and peds and improved shared use signage

At jct of NCN23 and Matalan access road


£3,000


5

10


New cycle track

50m of new 3m wide, 2 way cycle track using verge alongside Matalan access road and ending just barriers the barriers that crosses the

access road.


Matalan access road


£15,000


3

11


On road improvements

190m of Quietway treatment along Matalan access road and then final stretch of Furrlongs leading to East Street, B3323, creation of

seemless links to other portions of route


Matalan access road, Furrongs


£19,000


5

12

On road improvements

Creation of raised table mini roundabout

junction to slow traffic and increase cycle safety.

Jct of East St and Furrlongs


£35,000


5

13


New cycle track


65m of new 3m wide, 2 way cycle track using edge of development site between East St and Pyle St.

Between Furrlongs and Pyle Street alongside East St.


£19,500


1

14

New cycle

crossing

Install parallel zebra crossing across Pyle Street

Pyle St jct with

East St

£30,000

4


15

Adjustment to existing controlled

crossing

Re-work the the controlled crossing across High St so that cyclists and peds get a green when High Street traffic is held.


High St/Coppins Bridge jct


£0


5

16


On road improvements


210m of Quietway treatment, creation of seemless links to other portions of route

From junction of Sea St/High St along to jct of Sea

St/Little London


£21,000


5

17

On road improvements

Remove redundant barrier apparatus in middle

of road on entrance to County Hall car parking area on Sea St.


Sea St


£2,000


5

18


Conversion of carriageway to cycle track

Prohibit motorised traffic along Little London from the Bargeman's Rest to Sea St. Install a turning head at south end of Bargemen's Rest, with filtered permeability towards Sea St.

Create 115m of 4m, 2 way cycle track along the

part of Little London no longer open to traffic.


Little London


£20,000


3

19


On road improvements


470m of Quietway treatment, creation of seemless links to other portions of route

Along Little London from Bargeman's Rest to Blackhouse Quay/start of

footpath N29


£47,000


5

20


Junction improvement

Re-work geometry of junction between Hurstake Rd and Little London to reduce vehicle speeds. Change priority so that users of the cycle route have priority over those travelling

along Hurstake Rd.


Jct Hurstake Rd/Little London


£10,000


5

21

Improvement of existing shared-use

track


Removal of chicane barriers.

Junction of cycle track and Blackhouse Quay.


£2,000


5

22

Improvement of existing shared-use

track


Replace bollards with single bollard inset into track (away from turning point)

Cycle track junction with Riverway.


£2,000


5

23

Improvement of existing shared-use track

Improved identification of cycle route status especially across car park entrance. Parking controls to stop parking on track.

Cycle track next to Riverside Park car park.


£10,000


5

24

Improvement of existing shared-use

track


Rearrange gated access to cycle track to provide cycle gaps of minimum 1.5m


Start of former railway line track


£2,000


5

25

Improvement of existing shared-use

track


Widen 250m long narrow concrete sections to minimum 2.5m

Between Riverway and Dodnor Lane.


£18,750


5

26

Improvement of existing shared-use

track


Raise ground height either side of cycle track level with track.

Between Riverway and Dodnor Lane.


£5,000


5


27


Junction improvement

Remove barriers, parking controls to stop parking on track/junction, priority for cycle track across junction, traffic calming on

approach.

Cycletrack junction with Dodnor Lane


£15,000


5

28

Improvement of existing shared-use

track

Replace bollards on bridge with single bollard either end, create smooth transition between bridge deck and track.


Ddonor Creek bridge


£5,000


5

29

Junction improvement

Reduce offset to create smooth curves to

crossing point, revert to cycle track priority over minor road. Remove all bollards.

Cycltrack junction with Stag Lane


£25,000


5

30

Lighting improvement


Add lighting to all unlit sections of route


Whole route


£150,000


5


NC4: Church Litten to Town Centre

Route Description


A new route providing safe access to the town centre from areas of housing on the south side of Newport, improving connectivity between NC3 and the town centre and increasing the permeability of the town centre by bike. A new cycle track is proposed alongside Church Litten, with improvements to junctions at Medina Avenue and South Street. A contraflow cycle track along Town Lane allows for two-way cycling in this section, and the east end of Pyle Street is proposed to be converted to a Quietway. Supporting measures to reduce traffic and improve permeability on surrounding streets would maximise the impact of this route.

Route Map

image


image

image

Church Litten, looking south

Junction of Church Litten/South Street/Town Lane



Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1

On road improvements

95m of Quietway treatment, creation of seemless links to other portions of route

York Rd

£9,500

5

2

Junction

improvement

Remodelling of junction to give priority to

people cycling and walking

Jct York Rd and

Medina Ave

£100,000

4

3


New cycle track

260m of new 3m wide, 2 way cycle track using combination of footway and carriageway on

west side of Church Litten (road).


Church Litten


£156,000


4

4

Junction improvement

Remodelling of junction to give priority to people cycling and walking.

Jct of Church Litten/ South

Street/Town Lane


£300,000


3

5


New cycle track

80m of contraflow, 1 way cycle cycle track (1.5m wide)

Along whole

length of Town Lane


£25,000


3

6

On road improvements

240m of Quietway treatment, creation of seemless links to other portions of route

Pyle St from Town Lane to Coppins

Bridge junction


£24,000


5


NC5 Gunville to Town Centre

Route Description


This provides a link between Gunville (residential areas and retail developments) and the town centre. This route would utilise Quietway treatment on Fieldfare Road, then a new dedicated cycle track from Purdy Road to Hazel Close, improved existing shared-use path to Foxes Road then Quietway treatment to Newport Harbour, including contraflow cycle track/lane on Crocker Street. A spur alongside Wellington Road provides access to the schools in this area. This route links five schools, multiple residential estates and the town centre. It also connects into NC3 at Newport harbour for onward links on the existing and proposed cycle network.

Route Map


image



image

image

Victoria Recreation Ground, looking south

Wellington Road, looking east


Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


On road improvements


650m of Quietway treatment, creation of seemless links to other portions of route

Starting at jct of Gunville Rd with Taylor Rd, running along Taylor Rd, Fieldfare Rd until junction with

Purdy Rd


£65,000


5

2


New cycle track


240m of new 3m wide, 2 way cycle track running along northern edge of school playing field/grounds

Christ the King school playing fields and grounds, from Purdy Rd to

Wellington Rd


£72,000


2

3

New cycle crossing

Replace existing zebra crossing with a parallel zebra crossing

In front of Christ the King school on Wellington Rd


£30,000


5

4


New cycle track


465m of new 3m wide, 2 way cycle track using combination of existing verge, footway and carriageway.

From Carisbrooke School entrance to footpath N58 near eastern end

of Wellington Rd


£279,000


4

5


New cycle track


650m of new 3m wide, 2 way cycle track running through playing fields and agreed access through primary school.

Through Vectis Playing Fields and Victoria Recreation Ground and along edge of Newport Primary School

land.


£195,000


4

6

New cycle crossing

Install parallel zebra crossing where cycle track crosses Snowberry Lane

Jct of Snowberry

Rd and shared use track


£30,000


5

7

Improvement of existing shared-use

track


Remove bollards

Jct of shared use track with Petticoat Lane


£2,000


5

8

Improvement of existing shared-use track


Improved route identity treatment on non- trafficked section for 100m.

Where shared use track approaches Foxes Rd at the back of

Sainsbury's


£5,000


5

9


On road improvements


165m of Quietway treatment, creation of seemless links to other portions of route

From Foxes Rd (back of Sainsbury's) to Mill Street, along Mill St to Crocker

St


£16,500


5


10


New cycle track


390m of 1.5m contraflow cycle lane with light segregation

Whole length of Crocker St, from Mill St to

Holyrood St


£78,000


3

11

Junction

improvement

Raised table junction and re-work geometry to

slow traffic

Jct of Crocker St

and St James St

£45,000

5

12


On road improvements


115m of Quietway treatment, creation of seemless links to other portions of route

Short section of Holyrood St and then western section of Sea St to junction with

Little London


£11,500


5


NC6 Mountbatten Drive to Petticoat Lane

Route Description


This proposal is for the improvement and completion of an existing link between a large housing estate and Petticoat Lane, for onward connections to the town centre via NC5. Widening and improvement of existing dedicated and shared use route sections, addition of priority crossings where the route meets roads and a new cycle track to fill in a missing section between St Augustine’s Road and the Petticoat Lane/Sylvan Drive junction are proposed. This route links housing with a local primary school and the wider existing and proposed cycle network.

Route Map


image



image

image

Shared use path off Ward Close

Junction of Sylvan Drive and Petticoat Lane



Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1

Improvement of existing shared-use

track

Widening of 130m narrow sections of shared/partially segregated tracks, improved identification of cycle route status.

Mountbatten Drive to Sylvan Drive


£26,000


5

2

New cycle

crossing

Install parallel zebra crossing where cycle track

crosses Sylvan Drive

Sylvan Drive

£30,000

5

3

Improvement of existing shared-use track

Re-lay shared use track to ensure it remains level, with drive crossover level changes within buffer zone between track and carriageway.

Distance of 220m. Continuous

footway/cycleway across Juniper Close.


From Sylvan Drive crossing to St Augustines Road


£44,000


5

4


New cycle track

200m of new 3m wide, 2 way cycle track joining existing cycle track that runs next to Sylvan Drive with Petticoat Lane. Installation of

lighting.

St Augustines Road - Petticoat Lane - Sylvan

Drive


£72,000


2

5

New cycle crossing

Install parallel zebra crossing where cycle track crosses Sylvan Drive

Crossing of Petticoat Lane

and Sylvan Drive


£30,000


5

6

Improvement of existing shared-use track


Improved route identity treatment on non- trafficked section for 175m. Install lighting

From crossing of Petticoat Lane and Sylvan Drive to junction with

NC5.


£20,000


5


NC7: Parkhurst to Town Centre

Route Description

This route will provide a high-quality route linking existing and planned housing at Parkhurst; St Mary’s Hospital; employment areas at Riverway and Dodnor; Isle of Wight College and Wakes retail park with the town centre, Newport Harbour regeneration area and other cycle routes. The route would require new track alongside Medina Way, possibly within hospital land, a safe, convenient crossing of the link between St Mary’s junction and the B&Q roundabout, a new track alongside Medina Way between the IW college and Little London, with a safe, convenient crossing of Riverway, possibly in the form of a new bridge and controlled crossing. This route could also provide a key connection to proposed new housing on the Camp Hill site.

Route Map


image


image

Medina Way, looking south Footpath alongside Medina Way approaching the Isle of Wight College


Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


New cycle track

710m of new 3m wide, 2 way cycle track running along east side of Medina Way in front of hospital and using existing verge. 2 new raised table crossings across access roads to St

Mary's Hospital.


From Hewitt Crescent to jct with Dodnor Lane


£426,000


3

2


New cycle crossing

Install parallel zebra crossing where cycle track crosses Dodnor Lane between St Mary's roundabout and B&Q roundabout. Note: planned junction changes may mean an

alternative crossing type is more appropriate.

Dodnor Lane between St Mary's roundabout and B&Q roundabout


£30,000


3

3


New cycle track

880m of new 3m wide, 2 way cycle track running along east side of the dual carriageway (Medina Way) using existing verge and incorporating new bridge over Riverway and

signal crossing of Medina Way slip road.


From Dodnor Lane to Little London


£764,000


3


NC8: Dodnor Lane (North to South)

Route Description


Part of this route involves the creation of a cycle priority route on a lightly trafficked lane (a rural Quietway) connecting the existing Cowes-Newport cycle track to the Dodnor and Riverway industrial estates. The second part involves the construction of a new cycle track along the west side of the more heavily trafficked part of Dodnor Lane between Sevenacres and the B&Q roundabout. This route offers a high-quality link between St Mary’s Hospital and the Cowes-Newport cycle track and provide key connectivity between routes NC3 and NC7 and various parts of the employment area. It also connects housing to the north of Newport to Cowes and ferry services to the mainland.

Route Map


image




Dodnor Lane, looking west

Dodnor Lane, looking south



image

Route Selection Tool Assessment


image

Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


On road improvements

670m of cycle and pedestrian priority treatment on lightly trafficked lane. Reduction of speed limit to 20mph. High visual priority for cycling and pedestrians. Addition of street

lighting.

From jct of Dodnor Lane and NCN23 to rear entrance to Seven Acres unit at

St Mary's Hospital.


£140,000


4

2


New cycle track


575m of new 3m wide, 2 way cycle track with street lighting running along west side of Dodnor Lane and using hospital land.

From rear entrance to Seven Acres unit at St Mary's Hospital to B&Q

roundabout.


£380,000


2


NC9: Medina College/Leisure Centre to town centre

Route Description

Improvements to this sub-standard cycle route are proposed to include widening, surfacing and improved crossings and creation of a Quietway section along Newport Quay. This would be accompanied by a short extension to provide a safe onward link to Fairlee Road and NC1 using a combination of new two-way cycle track and improvements to the car park access road including a contraflow cycle track. This route provides a key link between the town and Medina College (secondary school) and Medina Leisure Centre, improved sustainable access to Seaclose Park and connectivity to the Newport Harbour regeneration area. It also forms part of the link to Island Harbour (proposed to continue to East Cowes in the future).


Route Map

image


image

Medina College access road Shared use route south of Medina Leisure Centre

Route Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


New cycle track


60m of new 3m wide, 2 way cycle track

From Fairlee Rd to the access road to Medina College across area of verge to the north of Medina College

entry road


£18,000


5

2

On road improvements

Installation of 80m of 1.5m contraflow

cycle track along Medina College access road

Medina College access road


£10,000


5

3


Junction improvement


Create greater sense of priority for cycling and install traffic calming

At jct of Medina Leisure Centre car park egress road and cycle track (outside Medina Theatre

entrance)


£10,000


5

4

Improvement of existing shared-use track

Widen to 3m and re-surface 720m of existing shared use track from Medina Theatre to Seaclose access road (running alongside Seaclose playing fields), addition

of lighting.


Medina Theatre to Seaclose


£188,000


5


5

Junction improvement

Install parallel zebra crossing where cycle track crosses Seaclose access road.

Jct of Seaclose access road and

cycle track


£30,000


5

6


New cycle track

180m of new 3m wide, 2 way cycle track using space on playing fields and running parallel to footpath N120, addition of

lighting.

On playing fields between Seaclose access road and

Newport quay.


£60,000


4

7

On road improvements

400m of Quietway treatment, creation of seamless links to other portions of route

Quayside to Sea Street junction

40000+C125:F131

5


NC10: Cross Medina Route

Route Description


This ambitious new route offers a valuable new connection across the River Medina providing key east-west connectivity and linking NC1, NC9 and NC10. The route involves improvements to the Seaclose/Fairleee Road junction to provide a safe cycle crossing, creation of a two-way cycle track alongside the Seaclose access road, construction of a new walking/cycling bridge across the Medina and improvement of the existing cycle link between NC3 and Riverway to create a link to the employment area here and Isle of Wight College. It also links the two National Cycling Network routes NCN 22 and NCN 23.


Route Map


image


image

image

Fairlee Road/Seaclose Park

Seaclose Park looking west



Routes Selection Tool Assessment


image


Infrastructure Improvements



Scheme Type

Description

Location

Indicative Cost

Deliverability

1


New cycle track

25m of 3m, 2 way cycle track joining old railway line route (NC1) with Fairlee Rd at the junction of Fairlee Rd and Seaclose.

Along urban footpath that runs down the south side of Exotic

Pets shop.


£7,500


3

2

Junction

improvement

Remodelling of junction to give priority to

people cycling and walking.

Fairlee Rd/Seaclose

access road junction

£200,000

3

3

New cycle track

330m of new 3m wide, 2 way cycle track

running parallel to Seaclose access road

Seaclose

£99,000

4

4

New cycle bridge

Cycle and pedestrian bridge spanning River Medina for approx 200m from Seaclose to

Blackhouse Quay

Seaclose to Blackhouse Quay


£5,000,000


2

5

Improvement of existing shared-use

track

60m of new 3m wide, 2 way cycle track creating a spur linking into Riverway Ind Est.

Along public footpath N29 from Riverway to Blackhouse Quay


£180,000


1


image

APPENDIX C

Ryde Cycling Routes

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030


image


Ryde Cycling Network: Route Proposals

RC1: Tesco to Esplanade

Route Description

This route links Ryde Esplanade with large areas of housing at Elmfield and Bullen Village, Westridge Business Park and Tesco. It also provides connectivity to the proposed Pennyfeathers and Hope Road housing developments. The route requires a new two-way cycle track along Brading Road, and a shared use route alongside Marlborough Road where available width is restricted. Junction remodelling is required at Bullen Cross and the Appley Road mini-roundabout. From Appley Road the route would use the existing traffic-free link to the Esplanade, upgraded as required. The route then joins RC3 for onward connection to Ryde Transport interchange (trains/ferries/buses) and town centre.


Route Map


image


image

image

Marlborough Road, looking north Brading Road, looking north Route Selection Tool Assessment


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

New cycle track

640m 3m wide 2 way cycle track along west side of Brading Rd.

Tesco to Bullen Cross

£192,000

1

2

Junction

improvement

Remodelling of junction to give

prioirity to people cycling and walking

Bullen Cross

£200,000

1


3

New shared- use track

900m 2.5-3 wide shared-use cycle track along west side of Marlborough

Rd.


Bullen Cross to Appley Rd


£540,000


3

4

Junction

improvement

Remodelling of junction to give

priority to people cycling

Appley Rd mini-roundabout

£200,000

3

5

Improvement of existing shared-use

track


Removal of two barriers. 575m of street-lighting. Quietway treatment.


Appley Rd to Esplanade


£92,000


5

6

New cycle route junction

New transition to Esplanade cycle route

Esplanade

£15,000

5


RC2: Appley Road

Route Description


This short route connects residential estates to the east of Ryde into RC1 for onward trips towards Tesco or the Esplanade and provides a safe route to Oakfield primary school. The route runs adjacent to various areas of proposed future housing development. It requires creation of new sections of shared use route linked by a Quietway along Seldon Avenue. The links between the shared use sections and quietway will need to ensure a seamless connection and avoid cyclists being interrupted by side roads that cross the route.

Route Map


image


image

image

Appley Road, looking west

Seldon Avenue, looking west



Route Selection Tool Assessment


image


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1


New cycle track

270m 2.5-3 wide shared-use cycle track on north side of Appley Rd


Puckpool Hill to Seldon Ave


£81,000


3

2

On road improvements

250m of Quietway treatment,

creation of seemless links to other portions of route


Seldon Ave


£25,000


5

3

New cycle track

70m 2.5-3 wide shared-use cycle

track on north side of Appley Rd

Alongside Appley Rd

£21,000

3


RC3: Puckpool to Ryde Interchange

Route Description


This route follows the seafront and involves the improvement and extension of an existing route to provide a high-quality route from Puckpool to Ryde Transport Interchange (trains/ferries/buses) and town centre. This route plays an important role in interconnecting several other routes (RC1, RC4 and RC6), provides a route for people passing through Ryde, links with the interchange and forms part of an important tourist cycle route along the north coast. It lays the foundation for further extension to Seaview, St Helens and Bembridge. New cycle track takes the route through Puckpool Park onto the existing shared use route which will be improved with a particular focus on minimising conflict between people walking and cycling. From the end of the current route to the transport interchange a new cycle track is proposed using excess carriageway width.

Route Map

image


image

Puckpool Park Ryde Esplanade, looking west


Route Selection Tool Assessment


image


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1


New cycle track

500m 3m wide 2 way cycle track on route of existing lower gravel path on northern side of Puckpool Park.

Through Puckpool Park from the Boathouse at bottom of Puckpool Hill to

Dell Café on Appley Walk.


£150,000


4

2

Improvement of existing shared-use track

Resurfacing of existing shared use route that runs next to beach for 840m. Widening where possible. Creation of seemless links to other

portions of route.


From the Dell Café to Ryde Lifeboat


£168,000


5

3

Improvement of existing shared-use

track


Removal of barriers (gate) across route.


Jct of Garden Walk and Appley Walk


£2,000


5

4

Improvement of existing

Improved route identity treatment on non-trafficked section for 650m.

Ryde Lifeboat to western end of North Walk/junction

with A3055


£32,500


5



shared-use track

Along shared use route by beach/boating lake.




5

Improvement of existing shared-use

track

Relocate poorly positioned street furniture (eg benches and shelter) to create clearer pathway

Various locations between Ryde Lifeboat to western end of North Walk/junction

with A3055


£10,000


5

6


New cycle track

540m of 3m wide 2 way cycle track

using space from current carriageway on northern side of A3055.

North Walk/junction with

A3055 along to bridge over railway to Hovertravel


£324,000


4

7


New cycle track

Re-engineering of existing carriageway, taxi rank and bus station accesses to create a 175m long, 3m wide east-west cycle track to join with

RC6


From bridge over railway to Hovertravel through to Western Gardens


£1,000,000


2


RC4: Smallbrook Lane to Esplanade

Route Description


A new route using a mixture of dedicated off-road routes and quiet streets. This route links the Esplanade with housing at Oakfield, St John’s Station, Nicholson Road industrial estate, proposed housing at Rosemary Vineyard and Pennyfeathers and the Nicholson Road regeneration area. The southern section utilises an existing bridleway, which requires upgrading to allow all-weather cycling. Most of the remainder of the route is on local streets proposed for Quietway treatment. Ideally the route will pass through what is current a BT depot between Park Road and Rink Road; it may be possible to achieve this as part of a redevelopment of this area. Alternatively, a less direct and hillier route could be provided on existing roads. The route passes through Simeon Street Recreation Ground, where the existing path built alongside the flood containment wall requires widening to allow shared use.

Route Map


image


image

Bridleway adjacent Nicholson Road industrial estate

Simeon Street Recreation Ground



Route Selection Tool Assessment


image


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1


New cycle track

Construction of 900m of 3m wide, 2 way cycle track constructed over existing bridleway and permissive path that runs to the east side of the railway line. Addition of street

lighting.


From Smallbrook Lane (next to railway bridge) to the Oakvale Estate


£270,000


4

2

New cycle bridge

New 3m wide bridge to replace existing narrow footbridge at

southern entrance to Oakvale Estate

Southern entrance to Oakvale Estate


£20,000


3

3

On road improvements

160m of Quietway treatment,

creation of seemless links to other portions of route


Through Oakvale Estate


£16,000


3

4


New cycle ramp

Creation of a cycleable ramp linking Oakvale Est with Meaders Rd

Northern end of Oakvale Estate


£30,000


3

5


On road improvements

150m of quietway along the length of Meaders Rd, identification of cycle route status, creation of seamless

links to other portions of route


Meaders Rd


£15,000


5

6


On road improvements

Carriageway improvements to calm traffic, highlight cycle route and improve cycle safety on short 40m main road section.


Linking Meaders Rd to St John's Wood Rd


£15,000


5

7


On road improvements

320m of quietway along the length of St John's Wood Rd, identification of cycle route status, creation of seemless links to other portions of

route


St John's Wood Rd


£32,000


5

8


New cycle track

130m of new 3m wide, 2 way cycle track using some of the land that is currently occupied by the BT depot

between Park Rd and Rink Rd


BT depot between Park Rd and Rink Rd


£39,000


1

9


New cycle track

For 275m, widen existing 1.8m concrete path to create a 3m wide, 2 way cycle track. Creation of seemless

links to other portions of route

Through Simeon Park (south to north) to link with Simeon Street


£41,250


5

10


On road improvements

190m of Quietway treatment along Simeon Street and then Cromwell Street, creation of seemless links to

other portions of route

Short section of Simeon St and then Cromwell St to junction of A3055.


£19,000


5

11

New cycle crossing

Install parallel zebra crossing across A3055 to join with RC3

Junction of Cromwell St and A3055

£30,000

3


RC5: Great Preston Road to Ashey Road

Route Description


This route provides an important orbital link for the cycle network and will reduce community severance caused by the railway line. It requires the upgrade of an existing lane and bridleway to create an all-weather route providing an east-west link to the south of Ryde. It opens up new cycling possibilities between residential areas, employment opportunities and schools either side of the railway line. The route directly links into the planned Nicholson Road regeneration area. Surfacing upgrades are needed along the length of the route along with a bridge over the railway line to replace the current open level-crossing.

Route Map:


image


image

Bridleway south of Nicholson Road industrial estate

Level crossing looking towards Rosemary lane.



Route Selection Tool Assessment


image


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1


Improvement of existing shared-use track

Widening and resurfacing of 460m of existing shared use route. Addition of street lighting. Creation of seemless links to other portions of route and spurs into surrounding industrial

estate.


Great Preston Rd to cycle route RC4/adjacent to level crossing of railway


£92,000


5

2


New cycle bridge

New 70m cycle bridge spanning the railway and enabling cycle route to continue seemlessly east-west.

Bridge will also mitigate gradient

issues.


At level crossing over railway


£2,500,000


3

3


New cycle track

460m of new 3m wide, 2 way cycle

track along Rosemary Lane to link with new bridge and Ashey Rd


Rosemary Lane


£138,000


3


RC6: Binstead to Ryde Interchange

Route Description


Part of this route is already recognised as NCN 22 but requires upgrading. The rest of the route requires the construction of new cycle tracks. The route links the large Binstead residential estates with the town centre and Ryde Transport Interchange (trains/ferries/buses). It provides safe links to several schools near the route. The western end of the route is proposed be created on an existing bridleway and highway verges. Binstead Road (the A3054) requires realignment to allow creation of a cycle track alongside, and a safe crossing of the main road is also proposed. From Spencer Road to the town centre the route follows lightly trafficked roads where a Quietway is recommended.

Route Map


image


image

Binstead Road, looking east Spencer Road, looking north-east


Route Selection Tool Assessment


image


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

New cycle crossing

Raised table, uncontrolled crossing at junction of Hillrise Ave and bridleway

to Dame Anthony's Common

Hillrise Ave and bridleway to Dame

Anthony's Common


£15,000


5

2

Improvement of existing shared- use track

Widening and resurfacing of 480m of existing shared use route. Addition of street lighting. Creation of seemless

links to other portions of route.

From Hillrise Ave to Binstead Lodge Rd along existing

bridleway


£125,000


5

3


New cycle track and bridge

Creation of spur from main new cycle route onto Hamilton Rd, which entails a new 3m bridge across a stream and the widening of approx 60m of what

is currently urban footpath


Hamilton Rd to bridleway


£27,000


3

4


On road improvements

Carriageway improvements to calm traffic, highlight cycle route and improve cycle safety on short 60m

road section.


Binstead Lodge Rd


£21,000


5

5


New cycle track

180m of new 3m wide, 2 way cycle

track alongside the west side of Ringwood Rd within highway verge.


Ringwood Rd


£54,000


5

6

New cycle crossing

Parallel zebra crossing (east-west) of Ringwood Rd next to Binstead Rd

junction

Ringwood Rd/Binstead Rd

junction


£30,000


5

7


New cycle track

245m of new 3m wide, 2 way cycle track alongside the southern side of Binstead Rd A3054 using highway verge.

Ringwood Rd/Binstead Rd junction to point 70m west of Stonepitts

Close


£73,500


5

8

New cycle crossing

Toucan crossing taking cycle track

users across from south side to north side of Binstead Rd A3054.

Point approx 70m

west of Stonepitts Close


£62,000


4

9


New cycle track

180m of new 2.5-3m wide, 2 way cycle track alongside the north side of Binstead Rd A3054 using highway verge and partial realignment of carriageway. May require small land

acquistion from Ryde Golf Club.

Point approx 70m west of Stonepitts Close to junction Ladies Walk/Ryde House Drive


£154,000


2

10

Improvement of existing shared-

use track

Removal of chicane barrier at access to Spencer Rd

Spencer Rd/Ryde House Drive


£2,000


4

11


Improvement of existing shared- use track

Resurfacing of 200m of existing shared use route from start of Spencer Rd to Beech Grove junction. Currently surface is gravel and

uneven concrete.


Spencer Rd to Beech Grove junction.


£40,000


4


12


On road improvements


1km of Quietway treatment along Spencer Rd, junction with St Thomas's St and along Yelf's Rd.

From junction of Beech Rd and Spencer Rd to junction Yelf's Rd and

Church Lane.


£100,000


5

13


On road improvements

Prohibition of motor vehicles except for access. Quietway treatment along Church Lane for 250m.

Along length of Church Lane from Yelf's Rd to junction

of Union St.


£30,000


4

14


New cycle track

50m of new 3m wide, 2 way cycle track along eastern side of Union Street using existing, excess carriageway width.

From junction of Church Lane and Union St to bottom of Union St/jct with

Esplanade.


£30,000


5

15


New cycle crossing

Remove existing sub standard crossing that crosses Esplanade towards bus station and replace with toucan crossing that will link RC6 and

RC3.


Esplanade, opposite entrance to pier.


£62,000


5


image

APPENDIX D

Newport Walking Routes

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030



image


Newport Walking Network: Route Proposals

NW1: Halberry Lane to Newport Quay

Route Description

This route connects a large area of existing housing in north east Newport with the town centre. There are also housing developments planned on the edge of north east Newport that would be connected by this route. It connects with the proposed NW10 Cross Medina walking route for access to large employment areas on the west side of the Medina River. Other amenities that are linked by it are Medina Leisure Centre and Theatre, Medina College (secondary school) and Mountbatten Hospice. The route largely follows an existing traffic free pathway (an old railway track) and will benefit from improved surfacing and lighting, which constitute the main proposals for its upgrade.


Route Map


image


image

image

Former railway line adjacent Victoria

Road

Tunnel under Fairlee Road


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

5

Comfort

6

Directness

8

Safety

6

Coherence

2

Total

27


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway creation

Surface current unmade shared use path to a width of 3m.

Addition of lighting. Over length

of 620m.

Halberry Lane to old railway tunnel, including short links to side roads

£223,000

5

2

Lighting

Improve lighting through old

railway tunnel

Length of old railway tunnel

£15,000

5

3

Footway widening

Widen shared use path to 3.0m over length of 80m.

From western end of old railway tunnel to Riverside

Centre car park

£15,000

5

4

Footway

widening

Widen footway to 2.5m over

length of 90m.

Along west side of Riverside

Centre car park

£17,000

5


NW2: Wellesley Way (Pan) to Coppins Bridge

Route NW2 links residential areas to the east of the town centre with the main pedestrian crossing point into the core walking zone. Key services and destinations along the route are Barton Primary School and Early Years/Community Centre, a playing field, parade of local shops and the post office. A mixture of schemes are proposed, ranging from improved crossings over side roads and footway widening to two key junction re-designs. The larger of these at the Furrlongs/Royal Exchange junction will entail the creation of a pedestrian plaza in front of the shops, rationalise parking arrangements and street clutter and improve crossing facilities to the school/community centre.

Route Map


image


image

image

Junction of Barton Road/School Lane/Royal

Exchange

Junction of Royal Exchange and Furrlongs


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

4

Comfort

7

Directness

5

Safety

5

Coherence

0

Total

21


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Street furniture changes

Remove guard railings and soften curves of path

Entrance to Isobel Park from Wellesley Rd

£4,000

5

2

New/modified

crossing

Uncontrolled crossing

Across Wellesley Rd to link to

path into Isobel Park.

£2,000

5

3

Lighting

Addition of street lighting over

115m

In Isobel Park.

£7,000

5

4

Streetscape improvement scheme

Comprehensive scheme required to improve pedestrian movement and ability to follow desire lines; create increased footway space and safe crossing points; rationalise parking

arrangements and street clutter.

Junction of Furrlongs and Royal Exchange by local shops/Barton Primary School

£100,000

4

5

New/modified

crossing

Uncontrolled crossing on raised

table

On Royal Exchange just to

west of public footpath N42

£17,000

5

6

Street furniture changes

Bollard removal

Next to footpath to Manor Cres/outide 65 Royal

Exchange

£2,000

5

7

Footway widening

Widen footway to 2.0m on one side of road over length of 150m

On north side of road, from

65 Royal Exchange to junction with School Lane

£28,500

5


8

Junction improvements

Major alterations required to this junction, to include: widening of footways and changes to geometry to improve ped crossing safety and to deflect vehicles; remove guard railing; possibly turn mini roundabout

into a T junction.

Junction of Royal Exchange and School Lane

£100,000

4

9

Street furniture

changes

Remove guard railing

Barton Rd next to footpath to

Highfield Rd

£2,000

5

10

Junction improvements

Raised table crossing and improved junction geometry

Across Robin Hood St

£25,000

5

11

New/modified

crossing

Uncontrolled crossings x 2

Across Barton Rd either side

of Robin Hood St

£4,000

5

12

Footway widening

Widen footway to 2.0m on one side of road over length of 95m

South side of Barton Rd between Robin Hood St and

Beech Rd

£18,000

5

13

Junction improvements

Continuous footway; improved junction geometry. Possibility of road realignment of main road towards the north to slow traffic

and allow for footway widening.

Junction with Barton Rd and Highfield Rd

£50,000

4


NW3: Furrlongs to St George's Way

Route Description


In addition to NW2, this route forms the other main walking artery into Newport town centre from housing estates on the east of the town, including the new and expanding Pan Meadows development. Numerous pedestrian alleyways and paths feed into this route from either side and the route crosses NW2 at the junction of Furrlongs/Royal Exchange mentioned above. It enters Newport town centre at the site of a retail/leisure complex. The main challenges at present are to do with poor pedestrian priority when crossing side roads along the length of the route. Many side roads are relatively minor, so the implementation of numerous continuous footways and raised tables is proposed. Where the route meets the edge of the core walking zone at St George’s Way, a junction re-design is required to make the crossing of this busy road safe, convenient and comfortable.

image

Route Map Length: 0.8km

image


image

image

Junction of Barry Close and Furrlongs

Junction of Furrlongs and St George’s Way


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

7

Comfort

9

Directness

6

Safety

6

Coherence

1

Total

29


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Junction

improvements

Continuous footway; improved

junction geometry

Across Meadowside

£25,000

5

2

New/modified crossing

Continuous footway

Entrance to car park/garages behind Greenways

£15,000

5

3

New/modified crossing

Continuous footway

Entrance to car park opposite Greenways

£15,000

5

4

Junction improvements

Continuous footway; improved junction geometry

Wallace Court

£25,000

5

5

Junction improvements

Remove mini roundabout and replace with T junction. Install

continuous footway

Manor Crescent (exit)

£25,000

5

6

New/modified

crossing

Uncontrolled crossing

On Furrlongs to north of

Manor Cres

£2,000

5

7

Junction

improvements

Continuous footway; improved

junction geometry

Manor Crescent (entrance)

£25,000

5

8

New/modified

crossing

Uncontrolled crossings x 2

Across Furrlongs either side

of Manor Cres (entrance)

£4,000

5

9

Street furniture

changes

Remove bollards around bus

stop

Both sides of Furrlongs next

to Barton Primary School

£2,000

5

10

New/modified

crossing

Continuous footway

Barton School access road

£15,000

5

11

Junction

improvements

Continuous footway; improved

junction geometry

Across Tinker's Hill

£25,000

5


12

Junction

improvements

Continuous footway; improved

junction geometry

Across Grove Close

£25,000

5

13

New/modified

crossing

Raised table crossing

Across Pan Lane

£15,000

5

14

Junction

improvements

Continuous footway; improved

junction geometry

Across Berry Close

£25,000

5

15

Junction

improvements

Continuous footway; improved

junction geometry

Across Downs View Rd

£25,000

5

16

Junction

improvements

Raised table crossing; improved

junction geometry

Across Robin Hood St

£25,000

5

17

Junction

improvements

Raised table crossing; improved

junction geometry

Across Homemeade

£25,000

5

18

Junction

improvements

Continuous footway; improved

junction geometry

Across Ash Rd

£25,000

5

19

Junction

improvements

Continuous footway; improved

junction geometry

Across Pan Close

£25,000

5

20

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. In particular ensure that peds coming from housing at south west end of Furrlongs can easily access safe crossing of St George's Way - only crossing options that currently exist lie a long way from the main junction of St George's Way and

necessitate a long walk round.

Junction of Furrlongs and St George's Way

£150,000

4


NW4: St John's Rd to Medina Ave

Route Description


This short route has been chosen because it represents the most direct line into the core walking zone from the south of the town. Other surrounding residential streets do not afford straight line access into the town centre and so feed into this route, which culminates on the edge of the retail area, at the Island Innovation Sixth Form College and a short walk from the bus station. It runs through an older residential part of the town and so suffers from absent/narrow footways in places and some stretches that are an impediment to people with restricted mobility. Proposals include footway widening and levelling out some steep inclines, as well as improved pedestrian priority through raised tables, tighter junction geometry and continuous footways at side roads.


Route Map


image




Junction of St John’s Road and Drake Road

St John’s Road, looking north


image

Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

8

Comfort

7

Directness

4

Safety

4

Coherence

0

Total

23


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

New/modified crossing

Raised table crossing

Over Shide Rd approach to mini roundabout

£15,000

5

2

New/modified crossing

Raised table crossing

Across St John's Rd north of mini roundabout

£15,000

5

3

Footway widening

Widen footway to 2.0m on one side of road over length of 160m. Consider levelling the raised footpath on approach to Cypress

Rd.

On east side of St John's Rd, from Shide Rd to Cypress Rd

£30,000

5

4

New/modified

crossing

Continuous footway

Across St John's Close

£15,000

5

5

Junction improvements

Continuous footway; improved junction geometry

Across Cypress Rd

£25,000

5

6

New/modified crossing

Uncontrolled crossing

Across St John's Rd to just north of Cypress Rd

£2,000

5

7

Junction

improvements

Continuous footway; improved

junction geometry

Drake Rd

£25,000

5

8

New/modified crossing

Raised table crossing

Across St John's Rd just

before junction with Medina Ave

£15,000

5

9

New/modified

crossing

Continuous footway

Across Terrace Rd

£15,000

5


NW5: Carisbrooke Rd to town centre

Route Description

This route follows the alignment of the busy B3323 road. It is the most direct route into the town centre from Carisbrooke and pedestrians from surrounding streets funnel into it. Coupled with the spur route of NW13 (see below) this route connects large residential areas, two secondary schools (Carisbrooke and Christ the King), two primary schools (Carisbrooke C of E and St Thomas of Canterbury) and a doctors’ surgery. Traffic dominates this route and conditions for pedestrians are poor. Existing junction designs at the principal junctions on the route are geared towards speed of entry/exit for motorists and make for dangerous and intimidating crossing conditions. Major re- designs of these have been proposed, along with smaller schemes to improve priority across more minor roads and widen footways where possible.

Route Map


image


image

image

Carisbrooke Road, near junction with Cedar

Hill

Junction of Carisbrooke Road and Castle Road


WRAT Assessment


Criterion

Performance Scores

Attractiveness

6

Comfort

5

Directness

3

Safety

0

Coherence

1

Total

15


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Suggest the following as minimum: widen footway on west side of mini roundabout over distance of approx 30m, remove parking on south east side of junction, install controlled crossing across Carisbrooke Rd to

east of junction.

Carisbrooke Rd at junction with Cedars Hill

£100,000

4

2

New/modified crossing

2 x accessible ramps installed on raised section of footpath on south side of Carisbrooke Rd between Cedars Hill and Wellington Rd to allow crossing from narrow section of footway on north side. Uncontrolled

crossings at each ramp.

Carisbrooke Rd between Cedars Hill and Wellington Rd

£40,000

5


3

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Suggest the following as minimum: tighten the geometry to prevent vehicles speeding across the mini roundabout into Wellington Rd, plus adding a zebra crossing across Wellington Rd. Also may be possible to install a "continental-style"

roundabout.

Junction of Carisbrooke Rd and Wellington Rd

£150,000

4

4

New/modified crossing

2 x continuous footway

Across entrances to Carisbrooke garage

£30,000

5

5

New/modified

crossing

Continuous footway

Across driveway next to 120

Carisbrooke Rd

£15,000

5

6

New/modified

crossing

Raised table crossing

Across Recreation Ground Rd

£15,000

5

7

Junction improvements

Change junction geometry to create a 90 degree entrance into Castle Rd to slow traffic and provide opportunity for footway widening (both on south side and on central "island"). Replace puffin with a zebra crossing across Castle Rd. Build out footway between Trafalgar Rd and Castle Rd to generally provide more ped and dwelling space. Re-design should aim to better link south side of Castle Rd with the central gardens area/war memorial and create

an improved sense of place.

Junction of Castle Rd and Carisbrooke Rd

£100,000

4

8

New/modified crossing

Widen Puffin crossing to minimum 4.0m

Across Carisbrooke Rd at junction of Castle Rd and Carisbrooke Rd

£10,000

5

9

New/modified

crossing

Continuous footway

Across Melbourne Street

£15,000

5

10

New/modified crossing

2 x accessible ramps installed on

raised section of footpath on north side of Carisbrooke Rd

On Carisbrooke Rd opposite Bedford Row and Portland St

£40,000

5

11

New/modified

crossing

Raised table crossing

Across Portland St to join two

areas of raised footway

£15,000

5


NW6: Mountbatten Drive to Sainsbury's / Mill St

Route Description


This route links a series of modern housing estates in the west of Newport with the town centre. The planned route uses a combination of an existing unsurfaced rural footpath, lightly trafficked and often traffic-calmed roads, as well as some traffic-free pathways that run between housing developments. The main improvements required along the route involve upgrading the rural public footpath; prioritising pedestrians over vehicles at side roads and at entrances to driveways by installing continuous footways and uncontrolled crossings; improving some pathway widths and providing lighting along pathways with low levels of natural surveillance.


Route Map


image


image

image

Uncontrolled crossing on Sylvan Drive, looking

east

Petticoat Lane, looking east



Walking Route Assessment Tool


Criterion

Performance Scores

Attractiveness

7

Comfort

6

Directness

7

Safety

6

Coherence

1

Total

27


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway

widening

Widening to 3.0m of 130m of

shared use route

Between Mountbatten Drive

and Sylvan Drive

£25,000

5

2

New/modified crossing

Install parallel zebra

Across Sylvan Drive near 90 degree bend west of Acacia

Close

£30,000

5

3

Footway improvements

Relay shared use track to ensure it remains level with drive crossover level changes within buffer zone between track and

carraigeway. Distance of 220m.

From Sylvan Drive (where new parallel zebra is proposed) to St Augustines Rd

£44,000

5

4

New/modified

crossing

Continuous footway

Across Juniper Close

£15,000

5

5

New/modified

crossing

New uncontrolled crossing

Just west of Acacia Close

£2,000

5

6

New/modified

crossing

Continuous footway

Across Acacia Close

£15,000

5

7

New/modified

crossing

New uncontrolled crossing

Across St Augustines Rd

£2,000

5


8

Footway creation

200m of new 3.0m wide shared use path. Addition of lighting

From St Augustines Rd to Petticoat Lane/Sylvan Drive

junction

£72,000

5

9

New/modified

crossing

Install parallel zebra

Petticoat Lane/Sylvan Drive

junction

£30,000

5

10


Addition of lighting over length of 350m

From junction of Petticoat Lane/Sylvan Drive to junction of Petticoat Lane/Rd and

Foxes Rd

£21,000

5

11

New/modified

crossing

Raised table crossing

Across Foxes Rd just west of

Mill St

£15,000

5

image


NW7: Parkhurst to town centre

Route Description


This route runs from the northern outskirts of Newport to the town centre. It has potential to be a major active travel corridor as it links a series of large employers and trip generators: the prison, existing housing, proposed new housing at Camphill, St Mary’s Hospital, numerous employers at the nearby industrial estates, the Isle of Wight College, the Wakes retail park and the Newport Harbour regeneration area. Upgrading this route will provide much needed pedestrian connectivity between these sites and the town centre, helping to reduce traffic congestion in the area. The route runs next to busy roads and crosses a number of side roads and two major junctions. A high-quality shared use route is proposed along its length and is possible given the available verge space. A 3m wide route is proposed, along with safe, convenient crossings of the two major junctions, possibly including a new bridge over Riverway.

Route Map


image


image

image

Medina Way, outside St Mary’s hospital,

looking north

Pedestrian route from Medina Way to

Riverway


Route Schemes




PLEASE SEE RECOMMENDATIONS UNDER "NC7" IN CYCLE INFRASTRUCTURE IMPROVEMENTS WHICH RELATE TO A NEW COMBINED CYCLING AND WALKING ROUTE


Hewitt Crescent (off Medina Way) to Little London, along eastern side of Medina Way


£1,220,000


3


NW8: Dodnor Lane/Monks Brook to B&Q roundabout

Route Description


This route connects St Cross Business Park, Dodnor Park Industrial Estate and the eastern side of the St Mary’s Hospital site into route NW7 for travel onwards into the town centre. It has relatively high levels of vehicle traffic, especially at rush hour. It joins route NW7 by the B&Q store at what is currently a busy roundabout with very poor pedestrian crossing facilities and high vehicle approach speeds. Proposals for this route include redesigning the B&Q roundabout, installing a zebra crossing and a whole new section of footway adjacent to the hospital where there is currently none despite clear evidence of pedestrian desire lines where the grass verge is currently being used.

Route Map


image


image

image

Dodnor Lane, looking north

Dodnor Lane, junction with hospital access,

looking south


Walking Route Assessment Tool


Criterion

Performance Scores

Attractiveness

4

Comfort

9

Directness

3

Safety

0

Coherence

0

Total

16


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Junction improvements

Raised table crossing; improved junction geometry (especially on

north side)

Across Dodnor Park

£25,000

5

2

New/modified

crossing

New uncontrolled crossing

St Mary's Hospital exit onto

Dodnor Lane

£2,000

5

3

New/modified crossing

New zebra crossing . Consider negotiating changes to vehicle entrance to industrial units on

south side.

Across Daish Way just to east of junction with Dodnor Lane

£25,000

5

4

Street furniture changes

Change traffic sign from two poles to a cantilevered sign

On footway outside Island Mobility

£5,000

5

5

New/modified

crossing

Continuous footway

Island Mobility entrance

£15,000

5

6

Junction improvements

Major re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Current junction allows high vehicles speeds, has poor visibility for peds, long crossing distances, narrow waiting areas, fails to allow peds for follow

desire lines.

B&Q roundabout junction

£150,000

4


7

Footway creation

Need for a pedestrian route on north side of Dodnor Lane using hospital land. 290m of new 2.0m

wide footway.

North side of Dodnor Lane between entrance to Seven Acres and thr B&Q

roundabout.

£174,000

3


NW9: Fairlee Rd/Medina College to Newport Quay

Route Description

This is a relatively lengthy route that connects Medina College (secondary school), Medina Leisure Centre, Seaclose Park, Newport Quay and the town centre. Much of it follows a recreational walking and cycling route that is free from traffic but in need of some upgrading. It also passes through the Newport Harbour regeneration area. Proposed improvements involve widening of footways, traffic calming and improved crossings at points where roads cross the route, installation of street lighting to increase night-time usage and a shared space scheme along the quayside which is currently dominated by vehicle access and parking bays.


Route Map


image


image

Access to Medina College/Leisure centre off Fairlee Road

Newport Quay, looking north


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

4

Comfort

5

Directness

7

Safety

6

Coherence

1

Total

23


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Junction improvements

improved junction geometry to prevent vehicles entering/leaving at speed. Raised zebra across access road where current

uncontrolled crossing is sited.

Entrance to Medina College from Fairlee Rd

£45,000

4

2

Street furniture changes

Remove gates on either side of road (to free of up footway

space)

Entrance to Medina College from Fairlee Rd

£4,000

5

3

Junction improvements

Improved junction geometry to prevent vehicles entering car park at speed. Raised table

crossing.

Entrance to Beaulieu House car park.

£25,000

5

4

Footway widening

Footway widening to 2.5m for 80m on one side of road.

Possible removal of on street

parking that is adjacent to the footway.

On access road to Medina College.

£15,000

4


5

New/modified crossing

Raised table zebra x 2

Next to bollards on route into Seaclose and across exit route from Medina Leisure Centre (next to disabled car parking

spaces)

£60,000

5

6

Junction improvements

Traffic calming to slow vehicles leaving car park and crossing the

walking/cycling route

Across exit road from Beaulieu House car park

£5,000

5

7

Street furniture

changes

Removal of bollard to create

wider entrance

Start of path into Seaclose

Park

£2,000

5

8

Footway widening

Along distance of 720m, widen and resurface shared use path to

3.0m. Addition of lighting.

Between Medina Theatre to Seaclose access road (next to

Seaclose IWC offices)

£188,000

5

9

Junction

improvements

Install raised parallel zebra

crossing

Across Seaclose access road

(next to Seaclose IWC offices)

£35,000

5

10

Footway improvements

Along distance of 180m, resurface shared use path. Addition of lighting.

On footway between Seaclose access road and the quayside (next to Jubilee

Stores)

£30,000

5

11

Shared space

scheme

Implement shared space scheme

for 380m

Along quayside from Jubilee

Stores to Riverside Centre

£50,000

5

12


PLEASE SEE RECOMMENDATIONS UNDER "NC10" IN CYCLE INFRASTRUCTURE IMPROVEMENTS WHICH RELATE TO A NEW COMBINED CYCLING

AND WALKING ROUTE

From old railway line route NC1 to Blackhouse Quay

£5,486,500

2


image

APPENDIX E

Ryde Walking Routes

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030



image


Ryde Walking Network: Route Proposals


RW1: Tesco to Appley Road

Route Description:

This route links Tesco, Westridge Business Park, existing residential areas at Elmfield and Bullen Village, the proposed Pennyfeathers and Hope Road housing developments and Oakfield School. It connects into RW2 for journeys towards the Esplanade, Ryde Transport Interchange (trains/ferries/buses) and town centre. While traffic levels restrict the attractiveness of this route, it provides a direct option for utility journeys. Proposals iinclude modification of junctions at Bullen Cross and Appley Road to provide safe crossings and provision of continuous footways across all minor road junctions to provide pedestrian priority for much of the route. Localised widening would ensure adequate footway width is provided for the whole length, some sections of which are well below standard.

Route Map


image




Marlborough Road, looking north

Marlborough Road, looking north


image

Walking Route Assessment Tool Assessment


Criterion

Performance Scores

Attractiveness

5

Comfort

4

Directness

9

Safety

1

Coherence

0

Total

19


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen ramp's entry into Tesco to 2m over distance

of 20m

Ped entrance to Tesco

£3,800

3

2

New/modified crossing

Install puffin crossing

Immediately to north of Tesco roundabout

£55,000

5

3

Junction improvements

Continuous footway and improved junction

geometry

McDonalds access road

£25,000

5

4

Junction improvements

Improved junction geometry and add zebra

crossing

Cothey Way jct Brading Rd

£35,000

5

5

Junction improvements

Pedestrian phase on all arms; widening of footways on all arms

approaching junction

Bullen Cross

£40,000

4

6

Street furniture changes

Replace two doubled poled traffic signs with 2 x

East side of Marlborough Rd just north of Bullen Cross

£5,000

5




cantilevered signs to reduce obstruction of

footway




7

Footway widening

Over distance of 900m widen footway to 2.0m

unless already 1.8m wide

Bullen Cross to Appley Rd

£85,000

4

8

New/modified crossing

Continuous footways at all side roads along both

sides of road. 9 in total.

Bullen Cross to Appley Rd

£135,000

5

9

Street furniture changes

Replace the doubled poled traffic signs with 1 x cantivered sign to reduce

obstruction of footway

Northern end of Marlborough Rd, west side just before roundabout

£2,500

5

10

New/modified crossing

Additional of 2 new uncontrolled crossing points on Marlborough

Rd

North of Salisbury Rd and north of Arundel Rd

£4,000

5

11

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian

crossings

Jct of Marlborough Rd and Appley Rd

£150,000

4


RW2: Appley to top of High Street

Route Description


While this route is unlikely to be walked in its entirety, it is heavily used for shorter sections linking other routes and a range of local amenities (Oakfield School, local shops, Ryde St John’s rail station) and the southern end town centre. The road has a significant severance effect, with heavy traffic volumes creating a barrier to north-south pedestrian movements. Proposed improvements include: footway widening around Oakfield School to accommodate high peak footfall and provide a safer environment; modifications to major junctions to reduce vehicle speeds and reduce crossing distance; continuous footway across many of the minor road junctions to improve pedestrian priority; creation of new crossings of the main road and introduction of a 20mph limit on part of the route to reduce the severance effect.


Route Map


image


image


Junction of Alexandra Road and St John’s Hill Junction of St Johns Hill and Bennet Street


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

3

Comfort

4

Directness

5

Safety

1

Coherence

0

Total

13


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway creation

250m of new 2m wide footway

From Puckpool Hill to start of Seldon Ave, on

north side of Appley Rd.

£75,000

5

2

Shared space scheme

Implement shared space on quiet access road as footway improvements are impractical.

250m.

Length of Seldon Ave

£50,000

5

3

Footway widening

80m of new 2m footway

From west end of Seldon Ave to Marlborough Rd

junction

£24,000

5

4

New/modified crossing

Uncontrolled crossing x 5 as follows: from Thornton Close across Appley Rd; across Grasmere Ave; across Derwent Dr; across Appley Rd adjacent to Derwent Dr; across Appley Rd adjacent to Marina Ave western entrance.

Appley Rd from Puckpool to Marlborough Rd

£10,000

5


5

New/modified

crossing

Continuous footway across Appley

Lane

Southern end of Appley

Lane

£15,000

5

6

Footway widening

Over distance of 150m widen footway to 2.0m

Jct of Appley Rd and Marlborough Rd to jct Appley Rd and High Park

Rd

£28,500

5

7

Footway widening

Some localised footway widening for 30m or so near controlled crossing - to improved space available to peds

waiting to cross

North side of Appley Rd near bus stop by Oakfield School.

£6,000

5

8

Footway widening

Over distance of 150m widen footway to 2.0m using space from redundant footway on other side of

road where possible.

Between Appley Rd and West Hill Rd on south/east side of road.

£28,500

5

9

Junction

improvements

Improved junction geometry and

widen refuge

Jct of Appley Rd and High

Park Rd

£15,000

5

10

Junction

improvements

Improved junction geometry and

raised table crossing

Jct of High Park Rd and

Alexandra Rd

£25,000

5

11

Street furniture

changes

Remove bollards on footway

Alexandra Rd opposite jct

with West Hill Rd

£2,000

5

12

New/modified crossing

Uncontrolled crossing x 5 as follows: West Hill crossing Alexandra Rd to west of jct; St John's Ave; across St John's Hill to west of St John's Ave jct; across St John's Wood Rd; across St John's Hill between Meaders Rd and St John's Wood Rd

Between West Hill Rd and Meaders Rd

£10,000

5

13

Junction

improvements

Improved junction geometry and

raised table crossing

Jct of Alexandra Rd and St

John's Hill

£25,000

5

14

New/modified

crossing

Continuous footways x 3 at Lower

Highland Rd; School St; Meaders Rd

Between Upper Highland

Rd and Meaders Rd

£45,000

5

15

Junction

improvements

Improved junction geometry and

raised table crossing

High Street

£25,000

5

16

Junction improvements

Re-modelling of junction to create

safe, comfortable and convenient pedestrian crossings

Jct of St John's Rd and Monkton Street

£100,000

4

17

New/modified crossing

Continuous footways x 10 on all side roads between (but not including)

Monkton Street and the High Street.

On St John's Rd between Monkton St and High st

£150,000

5

18

New/modified crossing

Zebra crossing midway between Monkton St and High St.

On St John's Rd between Monkton St and High st

£25,000

5

19

Speed limit

change

20mph speed limit

On St John's Rd between

Meaders Rd and High St.

£15,000

3

20

Junction

improvements

Whole junction on raised table

Junction of High St and St

John's Rd

£35,000

5


RW3: Monkton St to Esplanade

Route Description


This route is the most direct conduit for pedestrian traffic between the south of the town and the seafront, other than through the central walking zone. It connects into route RW2 and links large areas of housing, Ryde St John’s rail station, the Esplanade and Ryde Transport Interchange (trains/ferries/buses). It carries substantial vehicular through-traffic and a frequent bus service. It is characterised by sub-standard pavement widths in places and poor pedestrian priority over minor side roads, hence proposals for localised footway widening and a series of continuous footways. At its northern end a small areas of shops/cafes/pubs has potential to become a neighbourhood focal point. Proposals are included for streetscape improvements that would foster a sense of place and diminish the impact of through traffic.


Route Map


image


image

Monkton Street, looking north Junction of Monkton Street and East Street


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

6

Comfort

5

Directness

5

Safety

5

Coherence

0

Total

21


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

New/modified crossing

Continuous footways x 7 as follows: Jubilee Place; Winton St; Wood St; Melville St; Bellevue Rd; East St (east

side of Monkton St); Simeon St.

The whole length of Monkton St from junction with St John's Rd to The

Strand.

£105,000

5

2

New/modified crossing

Raised tables x 3 as follows: Park Rd; Rink Rd; East St (west side of Monkton St)

The whole length of Monkton St from junction with St John's Rd to The

Strand.

£75,000

5

3

Footway widening

Footway widening to 2.0m over distance of 80m

On west side of Monkton

St between Melville St and East St

£15,000

5

4

Streetscape improvement scheme

Local streetscape improvement scheme to include some or all of following: footway widening; opportunity for pavement seating;

planting; pocket park; cycle parking.

Monkton St between East St and The Strand.

£200,000

5


5

Junction improvements

Improvements to junction to create connectivity between Monkton St streetscape improvements and gardens that lead to Esplanade. To include footway widening, increased pedestrian priority, possible raised

table or at grade crossing.

Junction of Monkton St and The Strand

£35,000

5


RW4: Smallbrook Lane to St John's Rd

Route Description

This route serves existing housing at Oakfield, St John’s rail station and the Nicholson Rd Industrial Estate. There are also a number of proposed new developments that would be connected by the route, namely new light industrial units/offices, a doctors surgery, and housing at Rosemary Vineyard and Pennyfeathers. Construction of almost 1km of paved route and street lighting along an existing bridleway is proposed, along with Home Zone and shared space-style schemes on a short stretch of the residential Meaders Rd at the north end of the route.


Route Map


image


image

Path at end of Slade Road, looking north Meaders Road, looking north


WRAT Assessment


Criterion

Performance Scores

Attractiveness

5

Comfort

3

Directness

6

Safety

6

Coherence

0

Total

20


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway creation

Surfacing current bridleway/footpath to minimum width of 3.0m and installing lighting

for a length of 900m.

From Smallbrook Lane to Oakvale Estate

£270,000

5

2

Streetscape improvement

scheme

Home Zone style treatment

Southern end of Meaders Rd

£50,000

5

3

Shared space

scheme

Implement shared space scheme

Northern end of Meaders

Rd

£50,000

5


RW5: Upton Rd to south end of High Street

Route Description


Upton Rd is a radial route linking large areas of housing on both sides of it with the town centre. School children from two local schools, Haylands Primary and Ryde Academy (Secondary), use part of the route in large numbers. Ryde Medical Centre is also on the route. There is footway on only one side along large sections as well as sub-standard pavements widths and junction geometry that hinders safe crossing. Proposals include extensive footway widening, continuous footways, raised tables, footway “build outs” to create pedestrian passing places/traffic calming features. At the northern end where a parade of shops is located the proposal is to remove some on street parking and create more space for pedestrians to encourage a sense of place and dwell time for shopping.

Route Map


image


image

image

Junction of Upton Road and Salters Road

High Street, looking north


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

7

Comfort

8

Directness

5

Safety

3

Coherence

0

Total

23


image

Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen footway to minimum 1.5m over a distance of 90m

Between Mitchell's Rd and Salter's Rd on east side of

Upton Rd

£17,000

5

2

Footway widening

Widen footway for distance of 20m by extending built out crossing. This will enable all road signage to be installed without narrowing footway

to sub-standard widths.

On west side of Upton Rd just to south of Corbett Rd

£4,000

5

3

Footway widening

Where there are narrow sections of footway but carriageway width does not allow for widening along substantial lengths of the road, implement localised widening of footways to act as "passing places" for pedestrians and to function as traffic calming by forcing traffic to give and take. Approx 6 such

schemes.

Along Upton Rd from Windmill Close to Ashey Rd

£30,000

4

4

Footway widening

Widen footway to 2.0 m over a distance of 75m

On west side of Swanmore Rd between Milligan Rd

and Hill Street.

£14,000

5


5

Streetscape improvement scheme

Reduce on street parking spaces to a maximum of 10 spaces, intermittently located. Substantially widen footways in gaps between parking to create movement and dwelling space for pedestrians,

seating areas, planting.

On High St between St John's Rd and Well St/Hill St junction.

£100,000

3

6

Traffic parking management

Reduce parking duration from 1 hr to 30 mins.

On High St between St

John's Rd and Well St/Hill St junction.

£2,000

4

7

New/modified

crossing

Continuous footway

Butt's Rd

£15,000

5

8

New/modified crossing

Raised table crossing to replace

current dropped kerb. Remove bollards on east side.

On Upton Rd just to south of Salter's Rd

£15,000

5

9

Junction improvements

Continuous footway and improved junction geometry

Grenville Drive

£25,000

5

10

Junction improvements

Improve junction geometry and introduce zebra crossing across

Upton Rd

Junction of Upton Rd and Bettesworth Rd/Colenutts

Rd

£35,000

5

11

New/modified

crossing

Continuous footway

St Mary's Close

£15,000

5

12

New/modified

crossing

Built out crossing

Across Upton Rd just

south of Pound Mead

£5,000

5

13

New/modified

crossing

Uncontrolled crossing

Across Pound Mead.

£2,000

5

14

New/modified

crossing

Continuous footway

Node Close

£15,000

5

15

New/modified

crossing

Continuous footway x 3

St Michael's Ave; William

St; Pitt St.

£45,000

5

16

Junction improvements

Improve junction geometry and

move uncontrolled crossing closer to desire line

Partlands Ave

£15,000

5

17

Junction improvements

Re-modelling of junction to improve visibility for peds, slow traffic and create safe, comfortable and convenient pedestrian crossing.

Possible inclusion of zebra crossing.

Junction of Ashey Rd and Upton Rd

£50,000

5

18

New/modified

crossing

Continuous footway

Partlands Close

£15,000

5

19

Junction improvements

Re-design whole junction with a focus on pedestrian desire lines and using spare carriageway for wider footways and to create a sense of

place/meeting point.

Junction of Ratcliffe Ave, Osborne Rd and Swanmore Rd.

£100,000

4

20

New/modified

crossing

Raised table crossing

Weeks Rd

£15,000

5

21

New/modified crossing

Continuous footway

At entrance to unnamed cul de sac just to north of Weeks Rd (on west side of

Swanmore Rd)

£15,000

5

22

New/modified

crossing

Improve junction geometry and

install raised table crossing

Milligan Rd

£25,000

5


23

New/modified

crossing

Improve junction geometry and

install raised table crossing

Hill St

£25,000

5

24

New/modified

crossing

Raised table crossing

Well St

£15,000

5

25

New/modified crossing

Uncontrolled controls x 2: just to

south of Well St/Hill St; between Milligan Rd and Weeks Rd.

Along Swanmore Rd

between Well St and Weeks Rd

£4,000

5

26

New/modified crossing

Uncontrolled crossing

On High St between St John's Rd and Well St/Hill

St junction.

£2,000

5

27

Street furniture changes

Removal of bollards on footway

On High St between St John's Rd and Well St/Hill

St junction.

£2,000

5


RW6: Binstead Hill to Ryde town centre

Route Description


This route connects large areas of housing in west Ryde and Binstead with the town centre, the Esplanade and Ryde Transport Interchange (trains/ferries/buses). Ryde School (secondary) is also located on the route. Part of the route follows the Coastal Path, an important recreational facility for local residents and visitors. The westerly section of the route follows the busy A3054 road. Opportunities for footway widening are limited so many proposed interventions focus on pedestrian priority at side roads. Major schemes include junction remodelling and signalling at Binstead Rd/Ringwood Rd mini-roundabout and 300m of carriageway re-alignment to enable footway widening.

Route Map


image




Junction of Binstead Hill and Chapel Road

Binstead Road, looking north


image

Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

5

Comfort

4

Directness

5

Safety

0

Coherence

0

Total

14


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Junction improvements

Re-modelling of junction to improve visibility for peds, slow traffic and create safe, comfortable and convenient pedestrian crossings. At very least widen refuges and install correct

tactile paving.

Mini roundabout at junction of Binstead Hill and Church Rd

£100,000

4

2

Street furniture

changes

Reorientation of bus shelter to

maximise footway width

Opposite Arnold Rd on

Binstead Hill (north side)

£4,000

5

3

Footway widening

Remove bus lay by and widen footway to create passing place

for peds/waiting area for bus

Opposite Arnold Rd on Binstead Hill (north side)

£10,000

5

4

Footway widening

Remove bus lay by and widen footway to create passing place for peds/waiting area for bus

Just east of post office on north side of Binstead Rd

£10,000

5

5

New/modified crossing

Raised table crossings x 4 at:

Arnold Rd; Chapel Rd; Cemetery Rd; Pitts Lane.

Along Binstead Hill/Rd

between mini roundabout at western end and Pitts Lane

£60,000

5


6

Footway widening

Create wider waiting area next to pelican crossing by taking small

area of land from Binstead Park.

On north side of Binstead Rd near Chapel Rd junction

£5,000

4

7

Footway widening

Create wider waiting area next to pelican crossing by adopting some

land outside post office.

On south side of Binstead Rd near Chapel Rd junction

£5,000

1

8

Street furniture changes

Remove street clutter (including bollards) outside post office

By post office next to Chapel Rd junction

£2,000

5

9

New/modified crossing

Improve standard of existing continuous footway to create level

crossing of junction

Quarry Stone Close

£5,000

5

10

New/modified crossing

Improve standard of existing

continuous footway to create level crossing of junction

Kenstone Court

£5,000

5

11

New/modified

crossing

Continuous footway

Drill Hall Lane

£15,000

5

12

New/modified crossing

Continuous footway and improved junction geometry

Brookfield Gdns

£25,000

5

13

Junction improvements

Replace with signal-controlled junction or remodel to create safe, comfortable and convenient pedestrian crossings. Current crossing arrangements involve dangerously narrow refuges, lack of tactile paving in places, high vehicle speeds - all on a junction that links two major bus stops

serving a large housing estate.

Junction of Binstead Rd and Ringwood Rd

£150,000

4

14

Footway widening

Re-align carriageway for 300m to enable footway widening to 2.0m

On north side of Binstead Rd

between Ringwood Rd and Stonepitts Close

£300,000

5

15

New/modified

crossing

Continuous footway

Stonepitts Close

£15,000

5

16

Footway

widening

Footway widening using verge to

2.0m over distance of 100m

Stonepitts Close to Ryde

House Drive

£19,000

5

17

Junction improvements

Improved legibility of walking

routes and reduce primacy of motor vehicles

Entrance to Ryde House Drive/Ryde Golf Course

£10,000

5

18

Street furniture

changes

Removal of barrier at entrance to

Spencer Rd

Western end of Spencer Rd

£2,000

5

19

Footway creation

Recommend adoption of Spencer Rd from western end to junction with Beech Grove and creation of shared space scheme from western end of Spencer Rd to just east of Buckland Gdns - length of Spencer Rd currently without

footway.

Along Spencer Rd from western end to just east of Buckland Gdns.

£40,000

3

20

Footway widening

Localised widening of footway and removal of some parking to reduce sense of enclosure along

some stretches of road

Along Spencer Rd between Buckland Gdns and West St

£30,000

5


21

New/modified

crossing

Continuous footway

Augusta Rd

£15,000

5

22

New/modified

crossing

Continuous footway

Westfields Park (west

entrance)

£15,000

5

23

New/modified

crossing

Continuous footway

Westfields Park (east

entrance)

£15,000

5

24

Junction

improvements

Raised table junction; improved

junction geometry

Junction of West St and

Spencer Rd

£40,000

5

25

Footway widening

Widen footway to 2.0m for distance of 180m

On north side of Spencer Rd between West St and St

Thomas St

£34,000

5

26

New/modified

crossing

Continuous footway

Buckingham Rd

£15,000

5

27

New/modified

crossing

Raised table crossing

St James St

£15,000

5


RW7: Binstead estate to Ryde town centre

Route Description


At its western end is the large area of housing on Binstead Estate. From there the route connects with one local primary school (Greenmount) and two secondary schools (Ryde Academy and Ryde School) and continues on to the town centre. Narrow footways and poor junction geometry hinder pedestrian movement, but space exists to widen footways and re-design junctions to prioritise pedestrians. Existing mini-roundabouts encourage traffic to cross junctions at speed so new T junctions and raised tables are proposed. At the east end of the route two major junction remodelling schemes are proposed at Queens Rd/Mayfield Rd and at Queens Rd/West St. Removal of guard railing, narrowing of traffic lanes, shortening of pedestrian crossing points and improved pedestrian desire lines are all proposed.


Route Map


image


image

Junction of Broadway Crescent and Jellicoe Road

Junction of Newport Street/West Street/Queen Street/John Street


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

4

Comfort

6

Directness

4

Safety

4

Coherence

0

Total

18


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen footways on both sides of road to 2.0m for distance of 750m

Starting at the junction of Wellington Rd/Winston Ave and running along Wellington Rd, Broadway Cres, St Vincent Rd and Mayfield as far as junction

with Binstead Rd

£285,000

5

2

Speed limit change

Recommend adoption of 20mph speed limit/zone

Starting at the junction of Wellington Rd/Winston Ave and running along Wellington Rd, Broadway Cres, St Vincent Rd and Mayfield as far as junction

with Binstead Rd

£15,000

3

3

Junction improvements

Uncontrolled crossings x 3

located on desire lines; improved junction geometry

Winston Ave

£6,000

5

4

Junction

improvements

Uncontrolled crossing ; improved

junction geometry

Victory Close

£12,000

5


5

Footway

creation

Create new footway section on

site of turning head

Opposite number 38

Wellington Rd

£2,000

5

6

Junction improvements

Improved junction geometry; raised table across Wellington Rd and short section of new footway

with regrading of slope

Wellington Rd/Broadway Cres/Winston Ave junction

£30,000

5

7

Junction improvements

Improved junction geometry; regrade slope to allow footway on western side to gently come down to meet Maybrick Rd; raised table

across entrance.

Maybrick Rd

£30,000

5

8

New/modified

crossing

Continuous footway

Jellicoe Close

£15,000

5

9

Junction

improvements

Conversion of mini roundabout to

T junction and raised table

Junction of Broadway Cres

and Jellicoe Rd

£35,000

5

10

Junction

improvements

Conversion of mini roundabout to

T junction and raised table

Sherbourne Ave

£35,000

5

11

New/modified crossing

Continuous footways x 2

Across car park entrance opposite Sherbourne Ave and across Greenmount

School entrance

£30,000

5

12

Street furniture changes

Remove all guard railing at raised crossing into school.

Entrance to Greenmount Sch on St Vincent's Rd

£4,000

5

13

Junction improvements

Change to priority junction on raised table (priority being given

from St Vincent's Rd)

Junction of Mayfield Rd and St Vincent's Rd

£35,000

5

14

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings that allow

peds to follow desire lines.

Junction of Mayfield Rd/Binstead Rd/Queens Rd/Pellhurst Rd

£150,000

4

15

New/modified

crossing

Continuous footway; improved

junction geometry

Westwood Rd

£25,000

5

16

Footway widening

Adopt small area of land from All Saints Church, Ryde and relocate bus stop away from carriageway to allow more space for

pedestrians using footway

Bus stop opposite Ryde School with Upper Chine

£5,000

1

17

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings that allow

peds to follow desire lines.

Five Way junction (Queens Rd/West St/Newport St/ St John's St junction)

£150,000

4

18

Shared space scheme

Implement shared space scheme and Access Only restriction for

vehicles. Distance of 160m.

On Newport St from Five Ways junction to Station St

£130,000

5

19

Footway widening

Widen footways on both sides of road to 2.0m for distance of 75m;

implement loading restrictions

On Newport St from Station St to the High St.

£28,500

5


RW8: Pellhurst Rd to Ryde Golf Club

Route Description


This route is the only one in Ryde that doesn’t link directly with the Core Walking Zone, but it provides a connector function to three other routes (RW5, RW6 and RW7) that do. As well as its connecting function to those routes, it was selected for treatment because it carries large numbers of school children to Ryde Academy, the main secondary school in the town. It also passes through housing on either side and connects Ryde Medical Centre. In general, existing footways are of adequate width. The main challenge is to make the crossing of side roads safer and more convenient and so the main recommendations involve a series of continuous footways and raised tables being introduced. Proposed changes to the major junction at Queens Rd/Mayfield Rd is addressed under route RW7.


Route Map


image


image

image

Junction of Pellhurst Road and Pell Lane

Junction of Binstead Road and Thornbrough

Close


Walking Route Audit Tool Assessment


Criterion

Performance Scores

Attractiveness

6

Comfort

9

Directness

5

Safety

4

Coherence

2

Total

26


Infrastructure Improvements



Type

Description

Location

Indicative cost

Deliverability

1

Footway creation

Create direct footway across entrance to health centre and re- configure vehicular access to provide better priority for ped movements. Also possible relocation of bus stop to location

with wider footway

Area around entrance to Ryde Health and Wellbeing Centre

£20,000

5

2

New/modified

crossing

Raised table crossing

Partlands Ave

£15,000

5


New/modified

crossing

Raised table crossing

Ratcliffe Ave

£15,000

5


Junction improvements

Raised table crossing; improved junction geometry

Pell Lane

£25,000

5


New/modified

crossing

Raised table crossing

Arthur St

£15,000

5


Junction improvements

Consider changes to junction that would increase footway (though very limited options given space

restrictions)

Junction of Argyll St and Pellhurst Rd

£100,000

5



Junction improvements

Junction of Pellhurst Rd and Queens Rd is addressed as part of

RW7 recommendations

Junction of Pellhurst Rd and Queens Rd

£0

4


Junction improvements

Continuous footway; improved junction geometry

Thornbrough Close

£25,000

5


New/modified

crossing

Continuous footway

Gwydyr Close

£15,000

5


Footway widening

Widen footways on both sides of road to 2.0m for distance of 230m

Along Binstead Rd between Queens Rd and Ryde House Drive

£87,000

5


Footway widening

Seek to adopt land next to Treefields in order to relocate bus shelter further from carriageway and create more footway space

for peds.

Bus stop just east of Ryde House Drive on north side of Binstead Rd

£5,000

3


Ryde Central Walking Zone (CWZ)


Description

This area encompasses the main town centre retail area, cinema, library, public transport interchange (bus, train, ferries) and town centre car parks. Recommendations for improvements to streets in the CWZ includes footway widening, removal of through traffic in some streets, use of continuous footway in numerous locations to provide pedestrian priority at minor junctions and new formal crossings. Improvements to the pedestrian zone around the High Street are recommended, as is a comprehensive approach to improving Union Street to make it a more attractive place to spend time and reduce the dominance of parked cars on the historic streetscape.

CWZ Map


image


Infrastructure Improvements CWZ: St Thomas St (N to S)


Type

Description

Location

Indicative cost

Deliverability

1

Speed limit change

Introduction of 20mph speed limit throughout central walking zone

Whole of CWZ

£50,000

3

2

Streetscape improvement scheme

Comprehensive redevelopment of Esplanade/A3055 road between junction of Union St and St Thomas St and the Dover St roundabout. See

Appendix A for details.

Esplanade/A3055 road between junction of Union St and St Thomas St and the Dover St roundabout.

£2,000,000

2

3

New/modified crossing

Continuous footway

St Thomas St (north) car park

£15,000

5

4

New/modified

crossing

Continuous footway

Slipway

£15,000

5

5

Junction improvements

Continuous footway; improved junction geometry

St Thomas St (south) car park

£25,000

5

6

New/modified

crossing

Continuous footway

Buckingham Rd

£15,000

5


7

Footway widening

Narrow sections of footway but carriageway width does not allow for widening so implement localised widening of footways to act as "passing places" for pedestrians and to function as traffic calming.

Propose 2 such measures on this

stretch of road.

Along Thomas St from junction with Union St to junction of Spencer Rd

£10,000

5

8

Traffic parking management

Point closure

Halfway along southern half of St Thomas St between

Yelf's Rd and Lind St

£12,000

3

9

Footway widening

Widen footways on both sides of road to 2.0m for distance of 100m; level the footways which currently

exhibit very bad crossfall.

Along southern half of St Thomas St between Yelf's Rd and Lind St

£38,000

5



CWZ: Church Lane



Type

Description

Location

Indicative cost

Deliverability

1

Shared space scheme

Implement shared space scheme; prohibit motor vehicles except for

access. Distance of 350m.

Church Lane

£50,000

3


CWZ: Union St (N to S)



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen footways on both sides of road to 3.5m for distance of 325m

Whole length of Union St

£124,000

5

2

Streetscape improvement scheme

Comprehensive streetscape improvement scheme to include some or all of following: footway widening (see above) and build outs in areas vacated by removal of some parking provision; opportunity for pavement seating/tables; planting; pocket parks; relocation of cycle parking and other street furniture

onto built out areas.

Whole length of Union St

£500,000

3

3

Footway widening

In addition to the above, additional widening of footway at bus stop to allow disembarkation of bus passengers without disrupting

general ped movements.

Southern end of Union St, next to Wetherspoons

£4,000

5

4

New/modified crossing

New zebra crossing

Just north of Church Lane on Union St

£35,000

5

5

New/modified crossing

Installation of zebra crossing at current uncontrolled crossing point

Midway along Union St

£35,000

5

6

New/modified crossing

2 x uncontrolled crossing points

Between proposed new zebra crossings

£4,000

5


7

New/modified crossing

Install wide raised tables at each of the three existing zebra crossing points (retain zebras); enlarge central island to create increased movement space and relocate some street furniture away from desire

lines

Junction of Union St/Cross St

£60,000

5



CWZ: High St (N to S)



Type

Description

Location

Indicative cost

Deliverability

1

Streetscape improvement scheme

Improve entrance to High St from south by rationalising street furniture; repaving to show clear ped primacy; create sense of welcome with enhanced planting; traffic calming to slow permitted vehicles.

Southern entrance to High St

£20,000

5

2

Streetscape improvement scheme

Create consistent street surfacing to emphasise pedestrian zone; upgrade seating and street furniture; add planting and pocket park-style

features; enhance cycle parking.

High St from southern enrance to Star St

£150,000

5

3

Junction improvements

Widen footways on both sides to min 2.5m; install raised table junction; create sense of ped priority and need for vehicles to drive very slowly (eg 5mph) through the 90 degree turn.

High St/Star St junction as far as Newport St

£50,000

5

4

New/modified

crossing

Continuous footway

Newport St

£15,000

5

5

Streetscape improvement scheme

Reduce on street parking, create intermittent sections of street with no on street parking and substantially widen footways in gaps between parking to create movement and dwelling space for pedestrians, seating areas, planting.

High St from Newport St to just south of St Mary's Catholic Church.

£150,000

3

6

Footway widening

Widen footways for 40m section and reduce carriageway to one lane.

40m north from St John's Rd junction.

£15,000

5


CWZ: Castle St and Union Rd



Type

Description

Location

Indicative cost

Deliverability

1

Shared space

scheme

Implement shared space schemes

on both roads.

Castle St and Union Rd

£12,000

5


CWZ: George St (N to S)



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen footways on both sides to min 2.5m along 60m length.

On George St between Esplanade and Castle St

£23,000

5

2

Footway widening

Short section of build out on both sides of road just to south of

Castle St.

On George St just to south of Castle St.

£10,000

5

3

New/modified

crossing

2 x uncontrolled crossings

On George St, north and

south of Castle St junction

£4,000

5

4

Footway widening

Widen footways on one side of road to compensate for echelon parking overhang. For length of

130m.

On western side of George St where echelon parking is present

£25,000

5

5

New/modified

crossing

Uncontrolled crossing on a build

out

Midway between Castle St

and Melville St

£2,000

5

6

Footway widening

Extend existing build out to include area currently shown as

hatched on road.

Just north of junction with Cross St, west side of George

St.

£7,500

5

7

Street furniture changes

Relocate traffic sign from footway onto build out.

Just north of junction with Cross St, west side of George

St.

£2,000

5

8

New/modified

crossing

Uncontrolled crossing

Melville St

£2,000

5

9

New/modified crossing

Uncontrolled crossing on a build out (on both sides of road)

On George St, just to south of junction with Melville St/Cross St

£12,000

5

10

New/modified

crossing

Continuous footway

St George's Close

£15,000

5

11

New/modified

crossing

Raised table crossing

Entrance to Co-op car park

£15,000

5

12

Footway

widening

Extend build out and relocate bus

shelter onto enlarged build out

Outside Ryde Library, east

side of George St

£10,000

5

13

Street furniture changes

Relocate bus shelter further back from carriageway onto cinema land (necessitates land

acquisition)

Opposite Ryde Library, west side of George St

£5,000

1

14

Footway widening

Widen footways to 4.0m on both sides of the road at approach to junction (to slow traffic speeds and reduce ped crossing

distance). Length of 20m.

Final 20m stretch of George St at southern end.

£15,000

5


CWZ: Star St



Type

Description

Location

Indicative cost

Deliverability

1

Footway widening

Widen footways to minimum of

2.0m on one side of the road. Length of 70m.

North side of Star St

between George St and High St

£13,500

5

CWZ: Anglesey St



Type

Description

Location

Indicative cost

Deliverability

1

Shared space

scheme

Extend existing shared space

scheme

Eastern section of Anglesey

St

£30,000

5


CWZ: Cross St



Type

Description

Location

Indicative cost

Deliverability

1


Footway widening

Widen footways to 2.5m on both sides of the road. Length of 100m. Remove on street parking (loss of

approx 6 spaces).


Whole length of Cross St


£38,000


4

CWZ: Lind St (W to E)



Type

Description

Location

Indicative cost

Deliverability

1


Traffic parking management


Remove on street parking (loss of 4 spaces)

On south side of Lind St, just

to west of Lind Hill (access road to Travelodge)


£2,000


4

2

New/modified

crossing


Built out crossing

Across Lind St just to the

west of St James St


£5,000

5

3

New/modified

crossing


Built out crossing


Across St James St


£5,000

5

4

New/modified

crossing


Continuous footway

Across Lind Hill (access road

to Travelodge)


£15,000

5

5

New/modified

crossing


Continuous footway


Across St Thomas St


£15,000

5

6

New/modified

crossing


Continuous footway


Across Church Lane


£15,000

5


CWZ: Garfield St



Type

Description

Location

Indicative cost

Deliverability

1

Footway

widening

Build out around corner

Corner of Garfield Rd and

Victoria St

£5,000

5

2

New/modified

crossing

Uncontrolled crossing x 3 on

three arms of junction

Across Garfield Rd (x2) and

Victoria St

£6,000

5

3

Traffic parking management

Remove small number of parking spaces that reduce crossing

visibility

Garfield Rd (near junction with Victoria St)

£2,000

4


image

APPENDIX F

Network Cost Estimates

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030



image

Cost Estimates for Cycling Interventions

In developing the cost estimates for each route the following assumptions have been made:

Recommendations are based on a high-level audit of streets rather than detailed surveys. Recommendations have only been included where they appear to be deliverable but there may be issues beyond the scope of the audit which would restrict deliverability.


Recommendations are relatively general, more specific scheme details will require more detailed survey and design work.

In many situations there are multiple options for delivery, and the specific recommendations are based on the professional opinion of the audit team based on the information available to them and primarily considering benefit for people walking and cycling, rather than issues like impact on traffic flow.


In all assessments maintenance issues (including poor surface quality) that will be attended to during the core improvement period of the highways PFI have been ignored for scoring purposes and recommendations for remedial action.


Traffic flows and speeds are estimated except where survey data was provided.


All new/improved routes for walking or cycling are assumed to be provided with a bituminous surface or similar to provide a smooth, comfortable surface for walking/cycling. Cycle tracks and shared use paths are assumed to be machine-laid.


It is assumed that all schemes will be designed to a high standard, using modern design principles that provide high-quality walking and cycling environments. This is likely to require a change in approach from recently delivered walking and cycling infrastructure projects on the Isle of Wight.


All cycle routes will require signage. This is not explicitly addressed within individual schemes but would need to be of a high quality and employ a consistent approach across the network.


Some schemes for walking and cycling may not be compatible with one another. Where possible we have sought to ensure compatibility but, in some situations, the ideal walking and cycling schemes require the same space. If both walking and cycling schemes were to be advanced in these locations, it may be necessary to identify an alternative approach which addresses both but with some compromises.

image


In a few situations combined projects for walking and cycling have been identified and these are appropriately cross referenced between the walking and cycling schedules. Generally stand-alone walking and cycling schemes have been shown.


2m has been used as the minimum desirable width for new footways, but where widths are already 1.8m (a previously applied standard) it is anticipated footways would not be widened to 2m unless wider changes are required.


3m as the minimum desirable width for new cycleways, but where widths are already 2.5m it is anticipated routes would not normally be widened, though as the network develops and demand grows this may become necessary in some cases.


All section lengths specified are approximate.


Some sub-standard sections (particularly in terms of width) may be necessary on pragmatic grounds but this should always be seen as a last resort to complete a section of route.


When assessing scores for the cycling Route Selection Tool post-improvement scores assume all parts of the proposed network have been completed.


Estimated volumes of users are based on very limited data availability and should be treated with extreme caution.


Where two routes share a junction, recommendations for that junction are only listed under one route

Cost Estimates for Walking Interventions

Cost estimates for the above proposed walking routes are shown in Appendix C and D. In developing the cost estimated the following assumptions have been assumed.


In general, there is a need for better visual identification of cycle tracks through use of coloured surfacing, road markings etc. rather than large amounts of additional signage. Routes should be legible and easily identifiable. Dutch practice gives good examples of this, where cycle track designs are obvious (usually surfaced in red tarmac and distinctly marked) and signage plays a secondary role.

It is anticipated that as part of all schemes that street furniture would be assessed and rationalised, with consolidation of street furniture, removal of unnecessary items and relocation of items which cause an impediment to pedestrians.

It is anticipated that as part of all schemes any incorrect tactile paving will be re-laid correctly and any poorly dropped kerbs will be replaced with fully flush kerbs.

In many locations on-street parking is located too close to junctions and crossings, impeding visibility. Some of the worst cases have been identified within specific schemes but as a general principle greater distances between crossings and legal parking should be improved.

While the focus of the commission as on walking and cycling routes, it is also important to consider the importance of creating low-traffic neighbourhoods. Here an area wide treatment needs to be used, possibly alongside route-based treatments along main roads bordering the neighbourhood or “cell”. This approach can humanise local neighbourhoods but also provide key connectivity to, from and between main routes.

Wider traffic management is needed in some areas; this is beyond the scope of this commission, which only highlights some relatively minor traffic management issues with limited knock-on effects. However, the ability to change traffic flows, introduce restrictions on HGVs in some areas and manage parking controls more holistically would unblock further improvements.

Controlled crossing where observed to be almost universally provided to the minimum width, many would be improved by providing wider crossings. 2.4m shouldn’t be seen as a standard, but as a minimum. Specific cases where a large improvement would be made by widening crossings are highlighted in individual schemes but there are few cases where wider crossings would not bring benefit to pedestrians.

There is a need for clear quality and designs standards to create a high-quality environment for walking and cycling. These standards should be applied across all street improvement schemes. Examples include keeping footways level rather than allowing vehicle crossovers and similar to continually disrupt levels, parking meters should not be located on footways, street furniture should generally be located to the rear of the footway, and signage attached to buildings where possible and street furniture, signage etc should be consolidated. Quality standards should also be embedded in the planning systems to ensure new developments meet the highest standards, possibly through creation of Supplementary Planning Guidance on Active Travel infrastructure provision.


image

APPENDIX G

Cycle Network Action Plan

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030



image

Cycling Network Action Plan Newport


Scheme Type

Description: NC1 Mews Lane to Newport Quay

Location

Timetable

1

Improvement of existing shared-use track

510m of new 3m wide, 2-way cycle track along old railway line route. Addition of lighting.


Mews Lane to Halberry Lane


1-3 years

2


New cycle track

50m of 2.5m wide shared use route linking Fairlee Rd with old railway line route almost opposite Medina College entrance


Fairlee Rd/Medina College access road

1-3 years

3

New cycle crossing

Toucan crossing across Fairlee Rd linking the spur from the old railway line route with

Medina College and leisure centre.

Fairlee Rd/Medina College access road

1-3 years

4

New cycle crossing

Raised table, uncontrolled crossing at junction of Halberry Lane.

Halberry Lane /old railway line jct

1-3 years

5

New cycle track

Removal of barriers at both ends of track and drop kerbs at either end of lane that is already 3m wide but currently peds only

Between Cooper rd and Halberry Lane.

1-3 years

6

On road improvements

185m of Quietway treatment. Creation of seemless links to other portions of route

Length of Gordon Rd between Halberry

Lane and old railway line route

1-3 years

7

Improvement of existing shared-use track

580m of new 3m wide, 2 way cycle track along old railway line route. Addition of lighting.

From junction of Halberry Lane /old railway line to St Paul's View Rd

1-3 years

8

Improvement of existing

shared-use track

Re-grading of slope and re-aligment of track on the approach to the old railway tunnel

in order to reduce cyclists' speed and potential for pedestrian conflict

Slope down to old railway tunnel when

approaching from east

1-3 years

9

Improvement of existing shared-use track

Removal of chicane barrier at entrance to tunnel

Old railway tunnel

1-3 years

10

Improvement of existing

shared-use track

Upgrade lighting in the tunnel

Old railway tunnel

1-3 years

11

Improvement of existing shared-use track

100m of new 3m wide, 2 way cycle track. Creation of seemless link to next portion of route.

West end of railway tunnel to Riverside Centre car park

1-3 years

12


On road improvements


100m of Quietway treatment. Creation of seemless links to other portions of route


Riverside Centre car park to the quayside.

1-3 years


Scheme Type

Description: NC2: Pan to Furrlongs

Location

Timetable

1


New cycle track

160m of new 3m wide, 2 way cycle track. Creation of seemless link to next portion of route.

West side of Isobel Park linking with Garden Way


3-6 years

2

On road improvements

210m of Quietway treatment. Creation of seemless links to other portions of route

Garden Way to Pan Lane

3-6 years

3


New cycle track

50m of new 3m wide, 2 way cycle track. Creation of seemless link to next portion of route.

Between Garden Way and new housing development off Godric Road

3-6 years

4


New cycle track

440m of new 3m wide, 2 way cycle track using highway verge. Creation of seemless link to next portion of route.

From Pan Lane, using highway verge

alongside Homemeade to Furrlongs and then down to St George's Way A3020.

3-6 years

5

Junction improvement

Remodelling of junction to give priority to people cycling and walking

Jct of Furrlongs and St George's Way

3-6 years

6


On road improvements


75m of Quietway treatment. Creation of seemless links to other portions of route

Jct of Furrlongs and St George's Way to the jct of NC3 (aka NCN23)

3-6 years




Scheme Type

Description: NC3: Shide to Stag Lane

Location

Deliverability

1

New cycle crossing

Install parallel zebra crossing across Shide Rd

Shide Rd and NCN23

1-3 years

2


Improvement of existing shared-use track


Removal of bollards at entrance to Shide Path. Drop kerb installed.


Shide Path/Shide Lane jct.

1-3 years

3


Improvement of existing shared-use track


Removal of staggered barriers on Shide Path.


Shide Path

1-3 years

4


New cycle bridge


Installation of 3m wide bridge to replace the existing 1.5m wide bridge

Where NCN23 crosses River Medina in Shide

1-3 years

5

Improvement of existing shared-use track

Removal of guard railing where NCN23 meets St George's Way opposite Newport Football Club.

Where NCN23 meets St George's Way opposite Newport Football Club.

1-3 years

6


New cycle bridge


Installation of 3m wide bridge to replace the existing narrow bridge.


Where NCN23 crosses Pan Stream

1-3 years

7


New cycle track

50m of new 3m wide, 2 way cycle track creating a link from NCN23 to St George's Approach up the embankment.


Jct NCN23 and St George's Approach

1-3 years

8

Improvement of existing shared-use track


New cantilevered cycle track decking under bridge to provide 3m width


Under bridge at St George's Approach

1-3 years

9

Improvement of existing shared-use track


Installation of flush kerb for cyclists and peds and improved shared use signage


At jct of NCN23 and Matalan access road

1-3 years

10


New cycle track

50m of new 3m wide, 2 way cycle track using verge alongside Matalan access road and ending just barriers the barriers that crosses the access road.


Matalan access road

1-3 years

11


On road improvements

190m of Quietway treatment along Matalan access road and then final stretch of Furrlongs leading to East Street, B3323, creation of seemless links to other portions of route


Matalan access road, Furrongs

1-3 years

12


On road improvements

Creation of raised table mini roundabout junction to slow traffic and increase cycle safety.


Jct of East St and Furrlongs

1-3 years

13


New cycle track


65m of new 3m wide, 2 way cycle track using edge of development site between East St and Pyle St.


Between Furrlongs and Pyle Street alongside East St.

1-3 years

14

New cycle crossing

Install parallel zebra crossing across Pyle Street

Pyle St jct with East St

1-3 years

15

Adjustment to existing controlled crossing

Re-work the the controlled crossing across High St so that cyclists and peds get a green when High Street traffic is held.


High St/Coppins Bridge jct

1-3 years

16


On road improvements


210m of Quietway treatment, creation of seemless links to other portions of route

From junction of Sea St/High St along to jct of Sea St/Little London

1-3 years

17

On road improvements

Remove redundant barrier apparatus in middle of road on entrance to County Hall

car parking area on Sea St.

Sea St

1-3 years

18


Conversion of carriageway to cycle track

Prohibit motorised traffic along Little London from the Bargeman's Rest to Sea St. Install a turning head at south end of Bargemen's Rest, with filtered permeability towards Sea St. Create 115m of 4m, 2 way cycle track along the part of Little London

no longer open to traffic.


Little London

1-3 years

19

On road improvements

470m of Quietway treatment, creation of seemless links to other portions of route

Along Little London from Bargeman's Rest to Blackhouse Quay/start of footpath N29

1-3 years

20


Junction improvement

Re-work geometry of junction between Hurstake Rd and Little London to reduce vehicle speeds. Change priority so that users of the cycle route have priority over those travelling along Hurstake Rd.


Jct Hurstake Rd/Little London

1-3 years

21


Improvement of existing shared-use track


Removal of chicane barriers.


Junction of cycle track and Blackhouse Quay.

1-3 years

22

Improvement of existing

shared-use track

Replace bollards with single bollard inset into track (away from turning point)

Cycle track junction with Riverway.

1-3 years

23


Improvement of existing shared-use track


Improved identification of cycle route status especially across car park entrance. Parking controls to stop parking on track.


Cycle track next to Riverside Park car park.

1-3 years

24


Improvement of existing shared-use track


Rearrange gated access to cycle track to provide cycle gaps of minimum 1.5m


Start of former railway line track

1-3 years

25

Improvement of existing shared-use track

Widen 250m long narrow concrete sections to minimum 2.5m

Between Riverway and Dodnor Lane.

1-3 years

26

Improvement of existing shared-use track

Raise ground height either side of cycle track level with track.

Between Riverway and Dodnor Lane.

1-3 years

27


Junction improvement

Remove barriers, parking controls to stop parking on track/junction, priority for cycle track across junction, traffic calming on approach.


Cycletrack junction with Dodnor Lane

1-3 years

28

Improvement of existing shared-use track

Replace bollards on bridge with single bollard either end, create smooth transition between bridge deck and track.


Ddonor Creek bridge

1-3 years

29

Junction improvement

Reduce offset to create smooth curves to crossing point, revert to cycle track priority over minor road. Remove all bollards.

Cycltrack junction with Stag Lane

1-3 years

30


Lighting improvement


Add lighting to all unlit sections of route


Whole route

1-3 years



Scheme Type

Description: NC4: Church Litten to Town Centre

Location

Deliverability

1

On road improvements

95m of Quietway treatment, creation of seemless links to other portions of route

York Rd

3-6 years

2

Junction improvement

Remodelling of junction to give priority to people cycling and walking

Jct York Rd and Medina Ave

3-6 years

3


New cycle track

260m of new 3m wide, 2 way cycle track using combination of footway and carriageway on west side of Church Litten (road).


Church Litten

3-6 years

4

Junction improvement

Remodelling of junction to give priority to people cycling and walking.

Jct of Church Litten/ South Street/Town Lane

3-6 years

5

New cycle track

80m of contraflow, 1 way cycle cycle track (1.5m wide)

Along whole length of Town Lane

3-6 years

6

On road improvements

240m of Quietway treatment, creation of seemless links to other portions of route

Pyle St from Town Lane to Coppins Bridge junction

3-6 years


Scheme Type

Description: NC5 Gunville to Town Centre

Location

Deliverability

1


On road improvements


650m of Quietway treatment, creation of seemless links to other portions of route


Starting at jct of Gunville Rd with Taylor Rd, running along Taylor Rd, Fieldfare Rd until junction with Purdy Rd


1-3 years

2


New cycle track

240m of new 3m wide, 2 way cycle track running along northern edge of school playing field/grounds

Christ the King school playing fields and grounds, from Purdy Rd to Wellington Rd

1-3 years

3


New cycle crossing


Replace existing zebra crossing with a parallel zebra crossing

In front of Christ the King school on Wellington Rd

1-3 years

4


New cycle track


465m of new 3m wide, 2 way cycle track using combination of existing verge, footway and carriageway.

From Carisbrooke School entrance to footpath N58 near eastern end of Wellington Rd

1-3 years

5


New cycle track

650m of new 3m wide, 2 way cycle track running through playing fields and agreed access through primary school.

Through Vectis Playing Fields and Victoria

Recreation Ground and along edge of Newport Primary School land.

1-3 years

6

New cycle crossing

Install parallel zebra crossing where cycle track crosses Snowberry Lane

Jct of Snowberry Rd and shared use track

1-3 years

7

Improvement of existing shared-use track

Remove bollards

Jct of shared use track with Petticoat Lane

1-3 years

8

Improvement of existing shared-use track


Improved route identity treatment on non-trafficked section for 100m.

Where shared use track approaches Foxes Rd at the back of Sainsbury's

1-3 years

9


On road improvements


165m of Quietway treatment, creation of seemless links to other portions of route

From Foxes Rd (back of Sainsbury's) to Mill Street, along Mill St to Crocker St

1-3 years

10

New cycle track

390m of 1.5m contraflow cycle lane with light segregation

Whole length of Crocker St, from Mill St to Holyrood St

1-3 years

11

Junction improvement

Raised table junction and re-work geometry to slow traffic

Jct of Crocker St and St James St

1-3 years

12


On road improvements

115m of Quietway treatment, creation of seemless links to other portions of route

Short section of Holyrood St and then

western section of Sea St to junction with Little London

1-3 years



Scheme Type

Description: NC6 Mountbatten Drive to Petticoat Lane

Location

Deliverability

1

Improvement of

existing shared-use track

Widening of 130m narrow sections of shared/partially segregated tracks, improved identification of cycle route status.


Mountbatten Drive to Sylvan Drive

1-3 years

2

New cycle crossing

Install parallel zebra crossing where cycle track crosses Sylvan Drive

Sylvan Drive

1-3 years

3


Improvement of existing shared-use track


Re-lay shared use track to ensure it remains level, with drive crossover level changes within buffer zone between track and carriageway. Distance of 220m. Continuous footway/cycleway across Juniper Close.


From Sylvan Drive crossing to St Augustines Road

1-3 years

4

New cycle track

200m of new 3m wide, 2 way cycle track joining existing cycle track that runs

next to Sylvan Drive with Petticoat Lane. Installation of lighting.

St Augustines Road - Petticoat Lane - Sylvan

Drive

1-3 years

5

New cycle crossing

Install parallel zebra crossing where cycle track crosses Sylvan Drive

Crossing of Petticoat Lane and Sylvan Drive

1-3 years

6

Improvement of existing shared-use track

Improved route identity treatment on non-trafficked section for 175m. Install lighting

From crossing of Petticoat Lane and Sylvan Drive to junction with NC5.

1-3 years



Scheme Type

Description: NC7: Parkhurst to Town Centre

Location

Deliverability

1


New cycle track

710m of new 3m wide, 2 way cycle track running along east side of Medina Way

in front of hospital and using existing verge. 2 new raised table crossings across access roads to St Mary's Hospital.

From Hewitt Crescent to jct with Dodnor Lane


6 -10 years

2


New cycle crossing


Install parallel zebra crossing where cycle track crosses Dodnor Lane between St Mary's roundabout and B&Q roundabout. Note: planned junction changes may mean an alternative crossing type is more appropriate.


Dodnor Lane between St Mary's roundabout and B&Q roundabout

6 -10 years

3


New cycle track

880m of new 3m wide, 2 way cycle track running along east side of the dual carriageway (Medina Way) using existing verge and incorporating new bridge over Riverway and signal crossing of Medina Way slip road.


From Dodnor Lane to Little London

6 -10 years


Scheme Type

Description: NC8: Dodnor Lane (North to South)

Location

Deliverability

1


On road improvements


670m of cycle and pedestrian priority treatment on lightly trafficked lane. Reduction of speed limit to 20mph. High visual priority for cycling and pedestrians. Addition of street lighting.


From jct of Dodnor Lane and NCN23 to rear entrance to Seven Acres unit at St Mary's Hospital.

6 -10 years

2


New cycle track


575m of new 3m wide, 2 way cycle track with street lighting running along west side of Dodnor Lane and using hospital land.


From rear entrance to Seven Acres unit at St Mary's Hospital to B&Q roundabout.

6 -10 years




Scheme Type

Description: NC9: Medina College/Leisure Centre to town centre

Location

Deliverability

1


New cycle track


60m of new 3m wide, 2 way cycle track

From Fairlee Rd to the access road to Medina College across area of verge to

the north of Medina College entry road


1-3 years

2


On road improvements

Installation of 80m of 1.5m contraflow cycle track along Medina College access road


Medina College access road

1-3 years

3


Junction improvement


Create greater sense of priority for cycling and install traffic calming

At jct of Medina Leisure Centre car park egress road and cycle track (outside Medina Theatre entrance)

1-3 years

4


Improvement of existing shared-use track

Widen to 3m and re-surface 720m of existing shared use track from Medina Theatre to Seaclose access road (running alongside Seaclose playing fields), addition of lighting.


Medina Theatre to Seaclose

1-3 years

5


Junction improvement


Install parallel zebra crossing where cycle track crosses Seaclose access road.


Jct of Seaclose access road and cycle track

1-3 years

6


New cycle track

180m of new 3m wide, 2 way cycle track using space on playing fields and running parallel to footpath N120, addition of lighting.

On playing fields between Seaclose access road and Newport quay.

1-3 years

7

On road improvements

400m of Quietway treatment, creation of seamless links to other portions of route

Quayside to Sea Street junction

1-3 years



Scheme Type

Description: NC10: Cross Medina Route

Location

Deliverability

1


New cycle track


25m of 3m, 2 way cycle track joining old railway line route (NC1) with Fairlee Rd at the junction of Fairlee Rd and Seaclose.


Along urban footpath that runs down the south side of Exotic Pets shop.


1-3 years

2

Junction improvement

Remodelling of junction to give priority to people cycling and walking.

Fairlee Rd/Seaclose access road junction

1-3 years

3

New cycle track

330m of new 3m wide, 2 way cycle track running parallel to Seaclose access

road

Seaclose

1-3 years

4

New cycle bridge

Cycle and pedestrian bridge spanning River Medina for approx 200m from Seaclose to Blackhouse Quay

Seaclose to Blackhouse Quay

1-3 years

5

Improvement of existing shared-use track

60m of new 3m wide, 2 way cycle track creating a spur linking into Riverway Ind Est.

Along public footpath N29 from Riverway to Blackhouse Quay

1-3 years

Cycling Network Action Plan Ryde



Type

Description: RC1: Tesco to Esplanade

Location

Deliverability

1

New cycle track

640m 3m wide 2 way cycle track along west side of Brading Rd.

Tesco to Bullen Cross

1

2

Junction improvement

Remodelling of junction to give prioirity to people cycling and walking

Bullen Cross

1

3

New shared-use track

900m 2.5-3 wide shared-use cycle track along west side of Marlborough Rd.

Bullen Cross to Appley Rd

3

4

Junction improvement

Remodelling of junction to give priority to people cycling

Appley Rd mini-roundabout

3

5

Improvement of existing shared-use track


Removal of two barriers. 575m of street-lighting. Quietway treatment.


Appley Rd to Esplanade


5

6

New cycle route junction

New transition to Esplanade cycle route

Esplanade

5



Type

Description: RC2: Appley Road

Location

Deliverability

1


New cycle track


270m 2.5-3 wide shared-use cycle track on north side of Appley Rd


Puckpool Hill to Seldon Ave


3

2

On road improvements

250m of Quietway treatment, creation of seemless links to other portions

of route

Seldon Ave

5

3

New cycle track

70m 2.5-3 wide shared-use cycle track on north side of Appley Rd

Alongside Appley Rd

3


Type

Description RC3: Puckpool to Ryde Interchange

Location

Deliverability

1


New cycle track


500m 3m wide 2 way cycle track on route of existing lower gravel path on northern side of Puckpool Park.

Through Puckpool Park from the Boathouse at bottom of Puckpool Hill to Dell Café on Appley Walk.


4

2

Improvement of existing

shared-use track

Resurfacing of existing shared use route that runs next to beach for 840m.

Widening where possible. Creation of seemless links to other portions of route.

From the Dell Café to Ryde Lifeboat

5

3

Improvement of existing shared-use track

Removal of barriers (gate) across route.

Jct of Garden Walk and Appley Walk

5

4

Improvement of existing shared-use track

Improved route identity treatment on non-trafficked section for 650m. Along shared use route by beach/boating lake.

Ryde Lifeboat to western end of North Walk/junction with A3055


5

5


Improvement of existing shared-use track


Relocate poorly positioned street furniture (eg benches and shelter) to create clearer pathway

Various locations between Ryde Lifeboat to western end of North Walk/junction with A3055


5

6


New cycle track

540m of 3m wide 2 way cycle track using space from current carriageway on northern side of A3055.

North Walk/junction with A3055 along to bridge over railway to Hovertravel


4

7


New cycle track


Re-engineering of existing carriageway, taxi rank and bus station accesses to create a 175m long, 3m wide east-west cycle track to join with RC6


From bridge over railway to Hovertravel through to Western Gardens


2


Type

Description RC4: Smallbrook Lane to Esplanade

Location


Deliverability

1


New cycle track


Construction of 900m of 3m wide, 2 way cycle track constructed over existing bridleway and permissive path that runs to the east side of the railway line. Addition of street lighting.


From Smallbrook Lane (next to railway bridge) to the Oakvale Estate


4

2


New cycle bridge

New 3m wide bridge to replace existing narrow footbridge at southern entrance to Oakvale Estate


Southern entrance to Oakvale Estate


3

3

On road improvements

160m of Quietway treatment, creation of seemless links to other portions of

route

Through Oakvale Estate

3

4


New cycle ramp


Creation of a cycleable ramp linking Oakvale Est with Meaders Rd


Northern end of Oakvale Estate


3

5


On road improvements

150m of quietway along the length of Meaders Rd, identification of cycle route status, creation of seamless links to other portions of route


Meaders Rd


5

6

On road improvements

Carriageway improvements to calm traffic, highlight cycle route and improve cycle safety on short 40m main road section.

Linking Meaders Rd to St John's Wood Rd

5

7


On road improvements


320m of quietway along the length of St John's Wood Rd, identification of cycle route status, creation of seemless links to other portions of route


St John's Wood Rd


5

8


New cycle track

130m of new 3m wide, 2 way cycle track using some of the land that is currently occupied by the BT depot between Park Rd and Rink Rd


BT depot between Park Rd and Rink Rd


1

9


New cycle track

For 275m, widen existing 1.8m concrete path to create a 3m wide, 2 way cycle track. Creation of seemless links to other portions of route

Through Simeon Park (south to north) to link with Simeon Street


5

10


On road improvements

190m of Quietway treatment along Simeon Street and then Cromwell Street, creation of seemless links to other portions of route

Short section of Simeon St and then Cromwell St to junction of A3055.


5

11

New cycle crossing

Install parallel zebra crossing across A3055 to join with RC3

Junction of Cromwell St and A3055

3



Type

Description RC5: Great Preston Road to Ashey Road

Location

Deliverability

1


Improvement of existing shared-use track


Widening and resurfacing of 460m of existing shared use route. Addition of street lighting. Creation of seemless links to other portions of route and spurs into surrounding industrial estate.


Great Preston Rd to cycle route RC4/adjacent to level crossing of railway


5

2


New cycle bridge


New 70m cycle bridge spanning the railway and enabling cycle route to continue seemlessly east-west. Bridge will also mitigate gradient issues.


At level crossing over railway


3

3


New cycle track

460m of new 3m wide, 2 way cycle track along Rosemary Lane to link with new bridge and Ashey Rd


Rosemary Lane


3



Type

Description RC6: Binstead to Ryde Interchange

Location


Deliverability

1


New cycle crossing

Raised table, uncontrolled crossing at junction of Hillrise Ave and bridleway to Dame Anthony's Common

Hillrise Ave and bridleway to Dame Anthony's Common


5

2


Improvement of existing shared-use track


Widening and resurfacing of 480m of existing shared use route. Addition of street lighting. Creation of seemless links to other portions of route.


From Hillrise Ave to Binstead Lodge Rd along existing bridleway


5

3


New cycle track and bridge

Creation of spur from main new cycle route onto Hamilton Rd, which entails a new 3m bridge across a stream and the widening of approx 60m of what is currently urban footpath


Hamilton Rd to bridleway


3

4


On road improvements


Carriageway improvements to calm traffic, highlight cycle route and improve cycle safety on short 60m road section.


Binstead Lodge Rd


5

5

New cycle track

180m of new 3m wide, 2 way cycle track alongside the west side of Ringwood Rd within highway verge.

Ringwood Rd

5

6


New cycle crossing

Parallel zebra crossing (east-west) of Ringwood Rd next to Binstead Rd junction


Ringwood Rd/Binstead Rd junction


5

7

New cycle track

245m of new 3m wide, 2 way cycle track alongside the southern side of

Binstead Rd A3054 using highway verge.

Ringwood Rd/Binstead Rd junction to

point 70m west of Stonepitts Close

5

8


New cycle crossing

Toucan crossing taking cycle track users across from south side to north side of Binstead Rd A3054.


Point approx 70m west of Stonepitts Close


4

9


New cycle track

180m of new 2.5-3m wide, 2 way cycle track alongside the north side of Binstead Rd A3054 using highway verge and partial realignment of

carriageway. May require small land acquistion from Ryde Golf Club.

Point approx 70m west of Stonepitts Close to junction Ladies Walk/Ryde House Drive


2

10

Improvement of existing shared-use track

Removal of chicane barrier at access to Spencer Rd

Spencer Rd/Ryde House Drive

4

11

Improvement of existing shared-use track

Resurfacing of 200m of existing shared use route from start of Spencer Rd to Beech Grove junction. Currently surface is gravel and uneven concrete.


Spencer Rd to Beech Grove junction.


4

12


On road improvements

1km of Quietway treatment along Spencer Rd, junction with St Thomas's St and along Yelf's Rd.

From junction of Beech Rd and Spencer Rd to junction Yelf's Rd and Church Lane.


5

13


On road improvements

Prohibition of motor vehicles except for access. Quietway treatment along Church Lane for 250m.

Along length of Church Lane from Yelf's Rd to junction of Union St.


4

14


New cycle track

50m of new 3m wide, 2 way cycle track along eastern side of Union Street using existing, excess carriageway width.

From junction of Church Lane and Union

St to bottom of Union St/jct with Esplanade.


5

15


New cycle crossing


Remove existing sub standard crossing that crosses Esplanade towards bus station and replace with toucan crossing that will link RC6 and RC3.


Esplanade, opposite entrance to pier.


5


image

APPENDIX H

Walking Network Action Plan

Loca eyeing and waking infrastructure pan

Isle of Wight (Newport and Ryde)

image

2020-2030



image

Walking Network Action Plan Newport


Type

Description NW1: Halberry Lane to Newport Quay

Location

Timetable

1

Footway creation

Surface current unmade shared use path to a width of 3m. Addition of lighting. Over length of 620m.

Halberry Lane to old railway tunnel, including short links to side roads

1—3 years

2

Lighting

Improve lighting through old railway tunnel

Length of old railway tunnel

1—3 years

3

Footway widening

Widen shared use path to 3.0m over length of 80m.

From western end of old railway tunnel to Riverside Centre car park

1—3 years

4

Footway widening

Widen footway to 2.5m over length of 90m.

Along west side of Riverside Centre car

park

1—3 years



Type

Description NW2: Wellesley Way (Pan) to Coppins Bridge

Location

Timetable

1

Street furniture changes

Remove guard railings and soften curves of path

Entrance to Isobel Park from Wellesley Rd

3 -6 years

2

New/modified crossing

Uncontrolled crossing

Across Wellesley Rd to link to path into

Isobel Park.

3 -6 years

3

Lighting

Addition of street lighting over 115m

In Isobel Park.

3 -6 years

4

Streetscape improvement scheme

Comprehensive scheme required to improve pedestrian movement and ability to follow desire lines; create increased footway space and safe crossing points; rationalise parking arrangements and street clutter.

Junction of Furrlongs and Royal Exchange by local shops/Barton Primary School

3 -6 years

5

New/modified crossing

Uncontrolled crossing on raised table

On Royal Exchange just to west of public

footpath N42

3 -6 years

6

Street furniture changes

Bollard removal

Next to footpath to Manor Cres/outide 65 Royal Exchange

3 -6 years

7

Footway widening

Widen footway to 2.0m on one side of road over length of 150m

On north side of road, from 65 Royal

Exchange to junction with School Lane

3 -6 years


8

Junction improvements

Major alterations required to this junction, to include: widening of footways and changes to geometry to improve ped crossing safety and to deflect vehicles; remove guard railing; possibly turn mini roundabout into a T junction.

Junction of Royal Exchange and School Lane

3 -6 years

9

Street furniture changes

Remove guard railing

Barton Rd next to footpath to Highfield

Rd

3 -6 years

10

Junction improvements

Raised table crossing and improved junction geometry

Across Robin Hood St

3 -6 years

11

New/modified crossing

Uncontrolled crossings x 2

Across Barton Rd either side of Robin

Hood St

3 -6 years

12

Footway widening

Widen footway to 2.0m on one side of road over length of 95m

South side of Barton Rd between Robin Hood St and Beech Rd

3 -6 years

13

Junction improvements

Continuous footway; improved junction geometry. Possibility of road

realignment of main road towards the north to slow traffic and allow for footway widening.

Junction with Barton Rd and Highfield Rd

3 -6 years




Type

Description NW3: Furrlongs to St George's Way

Location

Timetable

1

Junction improvements

Continuous footway; improved junction geometry

Across Meadowside

3 -6 years

2

New/modified crossing

Continuous footway

Entrance to car park/garages behind

Greenways

3 -6 years

3

New/modified crossing

Continuous footway

Entrance to car park opposite

Greenways

3 -6 years

4

Junction improvements

Continuous footway; improved junction geometry

Wallace Court

3 -6 years

5

Junction improvements

Remove mini roundabout and replace with T junction. Install continuous

footway

Manor Crescent (exit)

3 -6 years

6

New/modified crossing

Uncontrolled crossing

On Furrlongs to north of Manor Cres

3 -6 years

7

Junction improvements

Continuous footway; improved junction geometry

Manor Crescent (entrance)

3 -6 years

8

New/modified crossing

Uncontrolled crossings x 2

Across Furrlongs either side of Manor

Cres (entrance)

3 -6 years


9

Street furniture changes

Remove bollards around bus stop

Both sides of Furrlongs next to Barton

Primary School

3 -6 years

10

New/modified crossing

Continuous footway

Barton School access road

3 -6 years

11

Junction improvements

Continuous footway; improved junction geometry

Across Tinker's Hill

3 -6 years

12

Junction improvements

Continuous footway; improved junction geometry

Across Grove Close

3 -6 years

13

New/modified crossing

Raised table crossing

Across Pan Lane

3 -6 years

14

Junction improvements

Continuous footway; improved junction geometry

Across Berry Close

3 -6 years

15

Junction improvements

Continuous footway; improved junction geometry

Across Downs View Rd

3 -6 years

16

Junction improvements

Raised table crossing; improved junction geometry

Across Robin Hood St

3 -6 years

17

Junction improvements

Raised table crossing; improved junction geometry

Across Homemeade

3 -6 years

18

Junction improvements

Continuous footway; improved junction geometry

Across Ash Rd

3 -6 years

19

Junction improvements

Continuous footway; improved junction geometry

Across Pan Close

3 -6 years

20

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. In particular ensure that peds coming from housing at south west end of Furrlongs can easily access safe crossing of St George's Way

- only crossing options that currently exist lie a long way from the main junction of St George's Way and necessitate a long walk round.

Junction of Furrlongs and St George's Way

3 -6 years



Type

Description NW4: St John's Rd to Medina Ave

Location

Timetable

1

New/modified crossing

Raised table crossing

Over Shide Rd approach to mini roundabout

3-6 years

2

New/modified crossing

Raised table crossing

Across St John's Rd north of mini roundabout

3-6 years

3

Footway widening

Widen footway to 2.0m on one side of road over length of 160m. Consider levelling the raised footpath on approach to Cypress Rd.

On east side of St John's Rd, from Shide Rd to Cypress Rd

3-6 years

4

New/modified crossing

Continuous footway

Across St John's Close

3-6 years

5

Junction improvements

Continuous footway; improved junction geometry

Across Cypress Rd

3-6 years

6

New/modified crossing

Uncontrolled crossing

Across St John's Rd to just north of Cypress Rd

3-6 years

7

Junction improvements

Continuous footway; improved junction geometry

Drake Rd

3-6 years

8

New/modified crossing

Raised table crossing

Across St John's Rd just before junction with Medina Ave

3-6 years

9

New/modified crossing

Continuous footway

Across Terrace Rd

3-6 years



Type

Description NW5: Carisbrooke Rd to town centre

Location

Timetable

1

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Suggest the following as minimum: widen footway on west side of mini roundabout over distance of approx 30m, remove parking on south east side of junction, install controlled crossing across Carisbrooke Rd to east of junction.

Carisbrooke Rd at junction with Cedars Hill

3-6 years

2

New/modified crossing

2 x accessible ramps installed on raised section of footpath on south side of Carisbrooke Rd between Cedars Hill and Wellington Rd to allow crossing from narrow section of footway on north side. Uncontrolled crossings at each ramp.

Carisbrooke Rd between Cedars Hill and Wellington Rd

3-6 years

3

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Suggest the following as minimum: tighten the geometry to prevent vehicles speeding across the mini roundabout into Wellington Rd, plus adding a zebra crossing across Wellington Rd. Also may be possible to

install a "continental-style" roundabout.

Junction of Carisbrooke Rd and Wellington Rd

3-6 years

4

New/modified crossing

2 x continuous footway

Across entrances to Carisbrooke garage

3-6 years

5

New/modified crossing

Continuous footway

Across driveway next to 120

Carisbrooke Rd

3-6 years

6

New/modified crossing

Raised table crossing

Across Recreation Ground Rd

3-6 years

7

Junction improvements

Change junction geometry to create a 90 degree entrance into Castle Rd to slow traffic and provide opportunity for footway widening (both on south side and on central "island"). Replace puffin with a zebra crossing across Castle Rd. Build out footway between Trafalgar Rd and Castle Rd to generally provide more ped and dwelling space. Re-design should aim to better link south side of Castle Rd with the central gardens area/war memorial and create an improved sense of place.

Junction of Castle Rd and Carisbrooke Rd

3-6 years


8

New/modified crossing

Widen Puffin crossing to minimum 4.0m

Across Carisbrooke Rd at junction of Castle Rd and Carisbrooke Rd

3-6 years

9

New/modified crossing

Continuous footway

Across Melbourne Street

3-6 years

10

New/modified crossing

2 x accessible ramps installed on raised section of footpath on north side of Carisbrooke Rd

On Carisbrooke Rd opposite Bedford Row and Portland St

3-6 years

11

New/modified crossing

Raised table crossing

Across Portland St to join two areas of

raised footway

3-6 years



Type

Description NW6: Mountbatten Drive to Sainsbury's / Mill St

Location

Timetable

1

Footway widening

Widening to 3.0m of 130m of shared use route

Between Mountbatten Drive and

Sylvan Drive

3-6 years

2

New/modified crossing

Install parallel zebra

Across Sylvan Drive near 90 degree bend west of Acacia Close

3-6 years

3

Footway improvements

Relay shared use track to ensure it remains level with drive crossover level changes within buffer zone between track and carraigeway. Distance of 220m.

From Sylvan Drive (where new

parallel zebra is proposed) to St Augustines Rd

3-6 years

4

New/modified crossing

Continuous footway

Across Juniper Close

3-6 years

5

New/modified crossing

New uncontrolled crossing

Just west of Acacia Close

3-6 years

6

New/modified crossing

Continuous footway

Across Acacia Close

3-6 years

7

New/modified crossing

New uncontrolled crossing

Across St Augustines Rd

3-6 years

8

Footway creation

200m of new 3.0m wide shared use path. Addition of lighting

From St Augustines Rd to Petticoat Lane/Sylvan Drive junction

3-6 years

9

New/modified crossing

Install parallel zebra

Petticoat Lane/Sylvan Drive junction

3-6 years


10


Addition of lighting over length of 350m

From junction of Petticoat Lane/Sylvan Drive to junction of Petticoat Lane/Rd and Foxes Rd

3-6 years

11

New/modified crossing

Raised table crossing

Across Foxes Rd just west of Mill St

3-6 years



Type

Description NW7: Parkhurst

Location

Timetable

PLEASE SEE RECOMMENDATIONS UNDER "NC7" IN CYCLE INFRASTRUCTURE IMPROVEMENTS WHICH RELATE TO A NEW COMBINED

CYCLING AND WALKING ROUTE


Hewitt Crescent (off Medina Way) to Little London, along eastern side of Medina Way

3-6 years



Type

Description NW8: Dodnor Lane/Monks Brook to B&Q roundabout

Location

Timetable

1

Junction improvements

Raised table crossing; improved junction geometry (especially on north side)

Across Dodnor Park

1-3 years

2

New/modified crossing

New uncontrolled crossing

St Mary's Hospital exit onto Dodnor Lane

1-3 years

3

New/modified crossing

New zebra crossing . Consider negotiating changes to vehicle entrance to industrial units on south side.

Across Daish Way just to east of junction with Dodnor Lane

1-3 years

4

Street furniture changes

Change traffic sign from two poles to a cantilevered sign

On footway outside Island Mobility

1-3 years

5

New/modified crossing

Continuous footway

Island Mobility entrance

1-3 years


6

Junction improvements

Major re-modelling of junction to create safe, comfortable and convenient pedestrian crossings. Current junction allows high vehicles speeds, has poor visibility for peds, long crossing distances, narrow waiting areas, fails to allow peds for follow desire lines.

B&Q roundabout junction

1-3 years

7

Footway creation

Need for a pedestrian route on north side of Dodnor Lane using hospital land. 290m of new 2.0m wide footway.

North side of Dodnor Lane between entrance to Seven Acres and thr B&Q roundabout.

1-3 years



Type

Description NW9: Fairlee Rd/Medina College to Newport Quay

Location

Timetable

1

Junction improvements

improved junction geometry to prevent vehicles entering/leaving at speed. Raised zebra across access road where current uncontrolled crossing is sited.

Entrance to Medina College from Fairlee Rd

1—3 years

2

Street furniture changes

Remove gates on either side of road (to free of up footway space)

Entrance to Medina College from Fairlee Rd

1—3 years

3

Junction improvements

Improved junction geometry to prevent vehicles entering car park at speed. Raised table crossing.

Entrance to Beaulieu House car park.

1—3 years

4

Footway widening

Footway widening to 2.5m for 80m on one side of road. Possible removal of on street parking that is adjacent to the footway.

On access road to Medina College.

1—3 years

5

New/modified crossing

Raised table zebra x 2

Next to bollards on route into Seaclose and across exit route from Medina Leisure Centre (next to disabled car parking spaces)

1—3 years

6

Junction improvements

Traffic calming to slow vehicles leaving car park and crossing the walking/cycling route

Across exit road from Beaulieu House car park

1—3 years

7

Street furniture changes

Removal of bollard to create wider entrance

Start of path into Seaclose Park

1—3 years

8

Footway widening

Along distance of 720m, widen and resurface shared use path to 3.0m. Addition of lighting.

Between Medina Theatre to Seaclose access road (next to Seaclose IWC offices)

1—3 years

9

Junction improvements

Install raised parallel zebra crossing

Across Seaclose access road (next to

Seaclose IWC offices)

1—3 years


10

Footway improvements

Along distance of 180m, resurface shared use path. Addition of lighting.

On footway between Seaclose access road and the quayside (next to Jubilee Stores)

1—3 years

11

Shared space scheme

Implement shared space scheme for 380m

Along quayside from Jubilee Stores to

Riverside Centre

1—3 years

12


PLEASE SEE RECOMMENDATIONS UNDER "NC10" IN CYCLE INFRASTRUCTURE IMPROVEMENTS WHICH RELATE TO A NEW COMBINED CYCLING AND WALKING ROUTE

From old railway line route NC1 to Blackhouse Quay

1—3 years


Walking Network Action Plan Ryde


Type

Description RW1: Tesco to Appley Road

Location

Timetable

1

Footway widening

Widen ramp's entry into Tesco to 2m over distance of 20m

Ped entrance to Tesco

3-6 years

2

New/modified crossing

Install puffin crossing

Immediately to north of Tesco roundabout

3-6 years

3

Junction improvements

Continuous footway and improved junction geometry

McDonalds access road

3-6 years

4

Junction improvements

Improved junction geometry and add zebra crossing

Cothey Way jct Brading Rd

3-6 years

5

Junction improvements

Pedestrian phase on all arms; widening of footways on all arms approaching junction

Bullen Cross

3-6 years

6

Street furniture changes

Replace two doubled poled traffic signs with 2 x cantilevered signs to reduce obstruction of footway

East side of Marlborough Rd just north of Bullen Cross

3-6 years

7

Footway widening

Over distance of 900m widen footway to 2.0m unless already 1.8m wide

Bullen Cross to Appley Rd

3-6 years


8

New/modified crossing

Continuous footways at all side roads along both sides of road. 9 in total.

Bullen Cross to Appley Rd

3-6 years

9

Street furniture changes

Replace the doubled poled traffic signs with 1 x cantivered sign to reduce obstruction of footway

Northern end of Marlborough Rd, west side just before roundabout

3-6 years

10

New/modified crossing

Additional of 2 new uncontrolled crossing points on Marlborough Rd

North of Salisbury Rd and north of Arundel

Rd

3-6 years

11

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings

Jct of Marlborough Rd and Appley Rd

3-6 years



Type

Description RW2: Appley to top of High Street

Location

Deliverability

1

Footway creation

250m of new 2m wide footway

From Puckpool Hill to start of Seldon Ave,

on north side of Appley Rd.

1-3 years

2

Shared space scheme

Implement shared space on quiet access road as footway improvements are impractical. 250m.

Length of Seldon Ave

1-3 years

3

Footway widening

80m of new 2m footway

From west end of Seldon Ave to Marlborough Rd junction

1-3 years

4

New/modified crossing

Uncontrolled crossing x 5 as follows: from Thornton Close across Appley Rd; across Grasmere Ave; across Derwent Dr; across Appley Rd adjacent to Derwent Dr; across Appley Rd adjacent to Marina Ave western entrance.

Appley Rd from Puckpool to Marlborough Rd

1-3 years

5

New/modified crossing

Continuous footway across Appley Lane

Southern end of Appley Lane

1-3 years

6

Footway widening

Over distance of 150m widen footway to 2.0m

Jct of Appley Rd and Marlborough Rd to jct Appley Rd and High Park Rd

1-3 years

7

Footway widening

Some localised footway widening for 30m or so near controlled crossing - to improved space available to peds waiting to cross

North side of Appley Rd near bus stop by Oakfield School.

1-3 years

8

Footway widening

Over distance of 150m widen footway to 2.0m using space from redundant footway on other side of road where possible.

Between Appley Rd and West Hill Rd on south/east side of road.

1-3 years


9

Junction improvements

Improved junction geometry and widen refuge

Jct of Appley Rd and High Park Rd

1-3 years

10

Junction improvements

Improved junction geometry and raised table crossing

Jct of High Park Rd and Alexandra Rd

1-3 years

11

Street furniture changes

Remove bollards on footway

Alexandra Rd opposite jct with West Hill Rd

1-3 years

12

New/modified crossing

Uncontrolled crossing x 5 as follows: West Hill crossing Alexandra Rd to west of jct; St John's Ave; across St John's Hill to west of St John's Ave jct; across St John's Wood Rd; across St John's Hill between Meaders Rd and St John's Wood Rd

Between West Hill Rd and Meaders Rd

1-3 years

13

Junction improvements

Improved junction geometry and raised table crossing

Jct of Alexandra Rd and St John's Hill

1-3 years

14

New/modified crossing

Continuous footways x 3 at Lower Highland Rd; School St; Meaders Rd

Between Upper Highland Rd and Meaders

Rd

1-3 years

15

Junction improvements

Improved junction geometry and raised table crossing

High Street

1-3 years

16

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings

Jct of St John's Rd and Monkton Street

1-3 years

17

New/modified crossing

Continuous footways x 10 on all side roads between (but not including)

Monkton Street and the High Street.

On St John's Rd between Monkton St and

High st

1-3 years

18

New/modified crossing

Zebra crossing midway between Monkton St and High St.

On St John's Rd between Monkton St and High st

1-3 years

19

Speed limit change

20mph speed limit

On St John's Rd between Meaders Rd and

High St.

1-3 years

20

Junction improvements

Whole junction on raised table

Junction of High St and St John's Rd

1-3 years



Type

Description RW3: Monkton St to Esplanade

Location

Timetable

1

New/modified crossing

Continuous footways x 7 as follows: Jubilee Place; Winton St; Wood St; Melville St; Bellevue Rd; East St (east side of Monkton St); Simeon St.

The whole length of Monkton St from junction with St John's Rd to The Strand.

3-6 years

2

New/modified crossing

Raised tables x 3 as follows: Park Rd; Rink Rd; East St (west side of Monkton St)

The whole length of Monkton St from junction with St John's Rd to The Strand.

3-6 years


3

Footway widening

Footway widening to 2.0m over distance of 80m

On west side of Monkton St between Melville St and East St

3-6 years

4

Streetscape improvement scheme

Local streetscape improvement scheme to include some or all of following: footway widening; opportunity for pavement seating; planting; pocket park; cycle parking.

Monkton St between East St and The Strand.

3-6 years

5

Junction improvements

Improvements to junction to create connectivity between Monkton St streetscape improvements and gardens that lead to Esplanade. To include footway widening, increased pedestrian priority, possible raised table or at grade crossing.

Junction of Monkton St and The Strand

3-6 years



Type

Description RW4: Smallbrook Lane to St John's Rd

Location

Timetable

1

Footway creation

Surfacing current bridleway/footpath to minimum width of 3.0m and installing lighting for a length of 900m.

From Smallbrook Lane to Oakvale Estate

3-6 years

2

Streetscape improvement scheme

Home Zone style treatment

Southern end of Meaders Rd

3-6 years

3

Shared space scheme

Implement shared space scheme

Northern end of Meaders Rd

3-6 years



Type

Description RW5: Upton Rd to south end of High Street

Location

Timetable

1

Footway widening

Widen footway to minimum 1.5m over a distance of 90m

Between Mitchell's Rd and Salter's Rd on east side of Upton Rd

3-6 years

2

Footway widening

Widen footway for distance of 20m by extending built out crossing. This will enable all road signage to be installed without narrowing footway to sub- standard widths.

On west side of Upton Rd just to south of Corbett Rd

3-6 years

3

Footway widening

Where there are narrow sections of footway but carriageway width does

not allow for widening along substantial lengths of the road, implement localised widening of footways to act as "passing places" for pedestrians

Along Upton Rd from Windmill Close to Ashey Rd

3-6 years




and to function as traffic calming by forcing traffic to give and take. Approx 6 such schemes.



4

Footway widening

Widen footway to 2.0 m over a distance of 75m

On west side of Swanmore Rd between Milligan Rd and Hill Street.

3-6 years

5

Streetscape improvement scheme

Reduce on street parking spaces to a maximum of 10 spaces, intermittently located. Substantially widen footways in gaps between parking to create movement and dwelling space for pedestrians, seating areas, planting.

On High St between St John's Rd and Well St/Hill St junction.

3-6 years

6

Traffic parking

management

Reduce parking duration from 1 hr to 30 mins.

On High St between St John's Rd and Well

St/Hill St junction.

3-6 years

7

New/modified crossing

Continuous footway

Butt's Rd

3-6 years

8

New/modified crossing

Raised table crossing to replace current dropped kerb. Remove bollards on east side.

On Upton Rd just to south of Salter's Rd

3-6 years

9

Junction improvements

Continuous footway and improved junction geometry

Grenville Drive

3-6 years

10

Junction improvements

Improve junction geometry and introduce zebra crossing across Upton Rd

Junction of Upton Rd and Bettesworth

Rd/Colenutts Rd

3-6 years

11

New/modified crossing

Continuous footway

St Mary's Close

3-6 years

12

New/modified crossing

Built out crossing

Across Upton Rd just south of Pound Mead

3-6 years

13

New/modified crossing

Uncontrolled crossing

Across Pound Mead.

3-6 years

14

New/modified crossing

Continuous footway

Node Close

3-6 years

15

New/modified crossing

Continuous footway x 3

St Michael's Ave; William St; Pitt St.

3-6 years

16

Junction improvements

Improve junction geometry and move uncontrolled crossing closer to desire

line

Partlands Ave

3-6 years

17

Junction improvements

Re-modelling of junction to improve visibility for peds, slow traffic and create safe, comfortable and convenient pedestrian crossing. Possible

inclusion of zebra crossing.

Junction of Ashey Rd and Upton Rd

3-6 years

18

New/modified crossing

Continuous footway

Partlands Close

3-6 years


19

Junction improvements

Re-design whole junction with a focus on pedestrian desire lines and using spare carriageway for wider footways and to create a sense of place/meeting point.

Junction of Ratcliffe Ave, Osborne Rd and Swanmore Rd.

3-6 years

20

New/modified crossing

Raised table crossing

Weeks Rd

3-6 years

21

New/modified crossing

Continuous footway

At entrance to unnamed cul de sac just to

north of Weeks Rd (on west side of Swanmore Rd)

3-6 years

22

New/modified crossing

Improve junction geometry and install raised table crossing

Milligan Rd

3-6 years

23

New/modified crossing

Improve junction geometry and install raised table crossing

Hill St

3-6 years

24

New/modified crossing

Raised table crossing

Well St

3-6 years

25

New/modified crossing

Uncontrolled controls x 2: just to south of Well St/Hill St; between Milligan Rd and Weeks Rd.

Along Swanmore Rd between Well St and Weeks Rd

3-6 years

26

New/modified crossing

Uncontrolled crossing

On High St between St John's Rd and Well

St/Hill St junction.

3-6 years

27

Street furniture changes

Removal of bollards on footway

On High St between St John's Rd and Well

St/Hill St junction.

3-6 years



Type

Description RW6: Binstead Hill to Ryde town centre

Location

Timetable

1

Junction improvements

Re-modelling of junction to improve visibility for peds, slow traffic and create safe, comfortable and convenient pedestrian crossings. At very least widen refuges and install correct tactile paving.

Mini roundabout at junction of Binstead Hill and Church Rd

3 – 6 years

2

Street furniture changes

Reorientation of bus shelter to maximise footway width

Opposite Arnold Rd on Binstead Hill (north

side)

3 – 6 years

3

Footway widening

Remove bus lay by and widen footway to create passing place for

peds/waiting area for bus

Opposite Arnold Rd on Binstead Hill (north

side)

3 – 6 years


4

Footway widening

Remove bus lay by and widen footway to create passing place for peds/waiting area for bus

Just east of post office on north side of Binstead Rd

3 – 6 years

5

New/modified crossing

Raised table crossings x 4 at: Arnold Rd; Chapel Rd; Cemetery Rd; Pitts

Lane.

Along Binstead Hill/Rd between mini

roundabout at western end and Pitts Lane

3 – 6 years

6

Footway widening

Create wider waiting area next to pelican crossing by taking small area of

land from Binstead Park.

On north side of Binstead Rd near Chapel Rd

junction

3 – 6 years

7

Footway widening

Create wider waiting area next to pelican crossing by adopting some land outside post office.

On south side of Binstead Rd near Chapel Rd junction

3 – 6 years

8

Street furniture changes

Remove street clutter (including bollards) outside post office

By post office next to Chapel Rd junction

3 – 6 years

9

New/modified crossing

Improve standard of existing continuous footway to create level crossing of junction

Quarry Stone Close

3 – 6 years

10

New/modified crossing

Improve standard of existing continuous footway to create level crossing of junction

Kenstone Court

3 – 6 years

11

New/modified crossing

Continuous footway

Drill Hall Lane

3 – 6 years

12

New/modified crossing

Continuous footway and improved junction geometry

Brookfield Gdns

3 – 6 years

13

Junction improvements

Replace with signal-controlled junction or remodel to create safe, comfortable and convenient pedestrian crossings. Current crossing arrangements involve dangerously narrow refuges, lack of tactile paving in places, high vehicle speeds - all on a junction that links two major bus stops serving a large housing estate.

Junction of Binstead Rd and Ringwood Rd

3 – 6 years

14

Footway widening

Re-align carriageway for 300m to enable footway widening to 2.0m

On north side of Binstead Rd between

Ringwood Rd and Stonepitts Close

3 – 6 years

15

New/modified crossing

Continuous footway

Stonepitts Close

3 – 6 years


16

Footway widening

Footway widening using verge to 2.0m over distance of 100m

Stonepitts Close to Ryde House Drive

3 – 6 years

17

Junction improvements

Improved legibility of walking routes and reduce primacy of motor vehicles

Entrance to Ryde House Drive/Ryde Golf Course

3 – 6 years

18

Street furniture changes

Removal of barrier at entrance to Spencer Rd

Western end of Spencer Rd

3 – 6 years

19

Footway creation

Recommend adoption of Spencer Rd from western end to junction with Beech Grove and creation of shared space scheme from western end of Spencer Rd to just east of Buckland Gdns - length of Spencer Rd currently

without footway.

Along Spencer Rd from western end to just east of Buckland Gdns.

3 – 6 years

20

Footway widening

Localised widening of footway and removal of some parking to reduce sense of enclosure along some stretches of road

Along Spencer Rd between Buckland Gdns and West St

3 – 6 years


21

New/modified crossing

Continuous footway

Augusta Rd

3 – 6 years

22

New/modified crossing

Continuous footway

Westfields Park (west entrance)

3 – 6 years

23

New/modified crossing

Continuous footway

Westfields Park (east entrance)

3 – 6 years

24

Junction improvements

Raised table junction; improved junction geometry

Junction of West St and Spencer Rd

3 – 6 years

25

Footway widening

Widen footway to 2.0m for distance of 180m

On north side of Spencer Rd between West

St and St Thomas St

3 – 6 years

26

New/modified crossing

Continuous footway

Buckingham Rd

3 – 6 years

27

New/modified crossing

Raised table crossing

St James St

3 – 6 years



Type

Description RW7: Binstead estate to Ryde town centre

Location

Timetable

1

Footway widening

Widen footways on both sides of road to 2.0m for distance of 750m

Starting at the junction of Wellington Rd/Winston Ave and running along Wellington Rd, Broadway Cres, St Vincent Rd and Mayfield as far as junction with Binstead Rd

3-6 years


2

Speed limit change

Recommend adoption of 20mph speed limit/zone

Starting at the junction of Wellington Rd/Winston Ave and running along Wellington Rd, Broadway Cres, St Vincent Rd and Mayfield as far as junction with Binstead Rd

3-6 years

3

Junction improvements

Uncontrolled crossings x 3 located on desire lines; improved junction geometry

Winston Ave

3-6 years

4

Junction improvements

Uncontrolled crossing ; improved junction geometry

Victory Close

3-6 years

5

Footway creation

Create new footway section on site of turning head

Opposite number 38 Wellington Rd

3-6 years

6

Junction improvements

Improved junction geometry; raised table across Wellington Rd and short

section of new footway with regrading of slope

Wellington Rd/Broadway Cres/Winston Ave

junction

3-6 years

7

Junction improvements

Improved junction geometry; regrade slope to allow footway on western side to gently come down to meet Maybrick Rd; raised table across entrance.

Maybrick Rd

3-6 years

8

New/modified crossing

Continuous footway

Jellicoe Close

3-6 years

9

Junction improvements

Conversion of mini roundabout to T junction and raised table

Junction of Broadway Cres and Jellicoe Rd

3-6 years

10

Junction improvements

Conversion of mini roundabout to T junction and raised table

Sherbourne Ave

3-6 years

11

New/modified crossing

Continuous footways x 2

Across car park entrance opposite Sherbourne Ave and across Greenmount School entrance

3-6 years

12

Street furniture changes

Remove all guard railing at raised crossing into school.

Entrance to Greenmount Sch on St Vincent's Rd

3-6 years

13

Junction improvements

Change to priority junction on raised table (priority being given from St Vincent's Rd)

Junction of Mayfield Rd and St Vincent's Rd

3-6 years

14

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings that allow peds to follow desire lines.

Junction of Mayfield Rd/Binstead Rd/Queens Rd/Pellhurst Rd

3-6 years

15

New/modified crossing

Continuous footway; improved junction geometry

Westwood Rd

3-6 years


16

Footway widening

Adopt small area of land from All Saints Church, Ryde and relocate bus stop away from carriageway to allow more space for pedestrians using footway

Bus stop opposite Ryde School with Upper Chine

3-6 years

17

Junction improvements

Re-modelling of junction to create safe, comfortable and convenient pedestrian crossings that allow peds to follow desire lines.

Five Way junction (Queens Rd/West St/Newport St/ St John's St junction)

3-6 years

18

Shared space scheme

Implement shared space scheme and Access Only restriction for vehicles.

Distance of 160m.

On Newport St from Five Ways junction to

Station St

3-6 years

19

Footway widening

Widen footways on both sides of road to 2.0m for distance of 75m;

implement loading restrictions

On Newport St from Station St to the High

St.

3-6 years



Type

Description RW8: Pellhurst Rd to Ryde Golf Club

Location

Timetable

1

Footway creation

Create direct footway across entrance to health centre and re-configure vehicular access to provide better priority for ped movements. Also possible relocation of bus stop to location with wider footway

Area around entrance to Ryde Health and Wellbeing Centre

1 -3 years

2

New/modified crossing

Raised table crossing

Partlands Ave

1 -3 years


New/modified crossing

Raised table crossing

Ratcliffe Ave

1 -3 years


Junction improvements

Raised table crossing; improved junction geometry

Pell Lane

1 -3 years


New/modified crossing

Raised table crossing

Arthur St

1 -3 years



Junction improvements

Consider changes to junction that would increase footway (though very limited options given space restrictions)

Junction of Argyll St and Pellhurst Rd

1 -3 years


Junction improvements

Junction of Pellhurst Rd and Queens Rd is addressed as part of RW7 recommendations

Junction of Pellhurst Rd and Queens Rd

1 -3 years


Junction improvements

Continuous footway; improved junction geometry

Thornbrough Close

1 -3 years


New/modified crossing

Continuous footway

Gwydyr Close

1 -3 years


Footway widening

Widen footways on both sides of road to 2.0m for distance of 230m

Along Binstead Rd between Queens Rd and Ryde House Drive

1 -3 years


Footway widening

Seek to adopt land next to Treefields in order to relocate bus shelter further from carriageway and create more footway space for peds.

Bus stop just east of Ryde House Drive on north side of Binstead Rd

1 -3 years

Central Walking Zone Infrastructure Improvements



Type

Description CWZ: St Thomas St (N to S)

Location

Timetable

1

Speed limit change

Introduction of 20mph speed limit throughout central walking zone

Whole of CWZ

3 -6 years

2

Streetscape improvement scheme

Comprehensive redevelopment of Esplanade/A3055 road between junction of Union St and St Thomas St and the Dover St roundabout. See Appendix A for details.

Esplanade/A3055 road between junction of Union St and St Thomas St and the Dover St roundabout.

3 -6 years

3

New/modified crossing

Continuous footway

St Thomas St (north) car park

3 -6 years

4

New/modified crossing

Continuous footway

Slipway

3 -6 years

5

Junction improvements

Continuous footway; improved junction geometry

St Thomas St (south) car park

3 -6 years

6

New/modified crossing

Continuous footway

Buckingham Rd

3 -6 years

7

Footway widening

Narrow sections of footway but carriageway width does not allow for widening so implement localised widening of footways to act as "passing places" for pedestrians and to function as traffic calming. Propose 2 such measures on this stretch of road.

Along Thomas St from junction with Union St to junction of Spencer Rd

3 -6 years

8

Traffic parking

management

Point closure

Halfway along southern half of St Thomas

St between Yelf's Rd and Lind St

3 -6 years

9

Footway widening

Widen footways on both sides of road to 2.0m for distance of 100m; level the footways which currently exhibit very bad crossfall.

Along southern half of St Thomas St between Yelf's Rd and Lind St

3 -6 years



Type

Description CWZ: Church Lane

Location

Timetable

1

Shared space scheme

Implement shared space scheme; prohibit motor vehicles except for access. Distance of 350m.

Church Lane

6 – 10 years



Type

Description CWZ: Union St (N to S)

Location

Timetable

1

Footway widening

Widen footways on both sides of road to 3.5m for distance of 325m

Whole length of Union St

6 – 10 years

2

Streetscape improvement scheme

Comprehensive streetscape improvement scheme to include some or all of following: footway widening (see above) and build outs in areas vacated by removal of some parking provision; opportunity for pavement seating/tables; planting; pocket parks; relocation of cycle parking and other street furniture onto built out areas.

Whole length of Union St

6 – 10 years

3

Footway widening

In addition to the above, additional widening of footway at bus stop to

allow disembarkation of bus passengers without disrupting general ped movements.

Southern end of Union St, next to Wetherspoons

6 – 10 years

4

New/modified crossing

New zebra crossing

Just north of Church Lane on Union St

6 – 10 years

5

New/modified crossing

Installation of zebra crossing at current uncontrolled crossing point

Midway along Union St

6 – 10 years

6

New/modified crossing

2 x uncontrolled crossing points

Between proposed new zebra crossings

6 – 10 years

7

New/modified crossing

Install wide raised tables at each of the three existing zebra crossing points (retain zebras); enlarge central island to create increased movement space and relocate some street furniture away from desire lines

Junction of Union St/Cross St

6 – 10 years



Type

Description CWZ: High St (N to S)

Location

Timetable

1

Streetscape improvement scheme

Improve entrance to High St from south by rationalising street furniture; repaving to show clear ped primacy; create sense of welcome with enhanced planting; traffic calming to slow permitted vehicles.

Southern entrance to High St

3-6 years

2

Streetscape improvement scheme

Create consistent street surfacing to emphasise pedestrian zone; upgrade seating and street furniture; add planting and pocket park-style features; enhance cycle parking.

High St from southern enrance to Star St

3-6 years

3

Junction improvements

Widen footways on both sides to min 2.5m; install raised table junction; create sense of ped priority and need for vehicles to drive very slowly (eg 5mph) through the 90 degree turn.

High St/Star St junction as far as Newport St

3-6 years

4

New/modified crossing

Continuous footway

Newport St

3-6 years

5

Streetscape improvement scheme

Reduce on street parking, create intermittent sections of street with no on street parking and substantially widen footways in gaps between parking to create movement and dwelling space for pedestrians, seating areas, planting.

High St from Newport St to just south of St Mary's Catholic Church.

3-6 years

6

Footway widening

Widen footways for 40m section and reduce carriageway to one lane.

40m north from St John's Rd junction.

3-6 years



Type

Description CWZ: Castle St and Union Rd

Location

Timetable

1

Shared space scheme

Implement shared space schemes on both roads.

Castle St and Union Rd

6-10 years



Type

Description CWZ: George St (N to S)

Location

Timetable

1

Footway widening

Widen footways on both sides to min 2.5m along 60m length.

On George St between Esplanade and Castle St

3-6 years

2

Footway widening

Short section of build out on both sides of road just to south of Castle St.

On George St just to south of Castle St.

3-6 years

3

New/modified crossing

2 x uncontrolled crossings

On George St, north and south of Castle

St junction

3-6 years

4

Footway widening

Widen footways on one side of road to compensate for echelon parking overhang. For length of 130m.

On western side of George St where echelon parking is present

3-6 years

5

New/modified crossing

Uncontrolled crossing on a build out

Midway between Castle St and Melville

St

3-6 years

6

Footway widening

Extend existing build out to include area currently shown as hatched on road.

Just north of junction with Cross St, west

side of George St.

3-6 years

7

Street furniture changes

Relocate traffic sign from footway onto build out.

Just north of junction with Cross St, west

side of George St.

3-6 years

8

New/modified crossing

Uncontrolled crossing

Melville St

3-6 years

9

New/modified crossing

Uncontrolled crossing on a build out (on both sides of road)

On George St, just to south of junction

with Melville St/Cross St

3-6 years

10

New/modified crossing

Continuous footway

St George's Close

3-6 years

11

New/modified crossing

Raised table crossing

Entrance to Co-op car park

3-6 years

12

Footway widening

Extend build out and relocate bus shelter onto enlarged build out

Outside Ryde Library, east side of

George St

3-6 years

13

Street furniture changes

Relocate bus shelter further back from carriageway onto cinema land (necessitates land acquisition)

Opposite Ryde Library, west side of George St

3-6 years


14

Footway widening

Widen footways to 4.0m on both sides of the road at approach to junction (to slow traffic speeds and reduce ped crossing distance). Length of 20m.

Final 20m stretch of George St at southern end.

3-6 years



Type

Description CWZ: Star St

Location

Timetable

1

Footway widening

Widen footways to minimum of 2.0m on one side of the road. Length of 70m.

North side of Star St between George St

and High St

3 – 6 years



Type

Description CWZ: Anglesey St

Location

Timetable

1

Shared space scheme

Extend existing shared space scheme

Eastern section of Anglesey St

3-6 years



Type

Description CWZ: Cross St

Location

Timetable

1


Footway widening

Widen footways to 2.5m on both sides of the road. Length of 100m. Remove on street parking (loss of approx 6 spaces).


Whole length of Cross St

6 -10 years



Type

Description CWZ: Lind St (W to E)

Location

Timetable

1


Traffic parking management


Remove on street parking (loss of 4 spaces)


On south side of Lind St, just to west of Lind Hill (access road to Travelodge)


6 -10 years

2


New/modified crossing


Built out crossing

Across Lind St just to the west of St

James St

6 -10 years

3


New/modified crossing


Built out crossing


Across St James St

6 -10 years

4


New/modified crossing


Continuous footway

Across Lind Hill (access road to

Travelodge)

6 -10 years

5


New/modified crossing


Continuous footway


Across St Thomas St

6 -10 years

6


New/modified crossing


Continuous footway


Across Church Lane

6 -10 years



Type

Description CWZ: Garfield St

Location

Timetable

1

Footway widening

Build out around corner

Corner of Garfield Rd and Victoria St

6 -10 years

2

New/modified crossing

Uncontrolled crossing x 3 on three arms of junction

Across Garfield Rd (x2) and Victoria St

6 -10 years

3

Traffic parking management

Remove small number of parking spaces that reduce crossing visibility

Garfield Rd (near junction with Victoria St)

6 -10 years