This report includes a summary of the Beach Accessibility actioned in 2025 and outlines a request for the funds required for 2026.


Index Table:

Page 2 – 6 Summary of existing Beach Accessibility provision


Page 7 Background information

Page 7 Financial implications

Page 8 Options

image

BEACH ACCESSIBILITY –END OF SEASON REPORT & 2026 PLANS

RYDE TOWN COUNCIL

1

Page 8 Recommendations


  1. SUMMARY OF EXISTING BEACH ACCESSIBILITY PROVISION BOARDWALK

    Construction:

    An additional 130m of boardwalk was commissioned from NaShers, who once again stepped up and produced all boards ahead of the deadline in early March. This now brings the total length of boardwalk to 330m – which incidentally can be seen from space! (Or at least on google earth!)


    image image


    Usage:

    The boardwalk was used extensively by people of all ages and physical abilities from May Bank Holiday, as well as spectators and the RAF Falcon Parachute team during Armed Forces celebrations on 29th June! It has shown to be an essential addition to make the beach accessible for all!


    image


    Storage:

    Storage in the outdoor basement of No 11 St Thomas Square (No 11) worked well as the van can get close access down the ramp. We aim to use this again for over-winter storage.


    Installation:

    Each boardwalk section measures 1m x 1.8m and, while one person can carry a single board, the overall process is demanding: loading 330 sections into a van, offloading, and positioning them on the beach. Teams of two staff take turns to complete the installation and removal, which highlights the importance of allocating sufficient staff hours in the budget.

    We haven’t yet found a more efficient way to manage the installation and removal of the boards each season, so staff time continues to be built into planning. This year, the budget was exceeded when the boards had to be lifted and re-laid after the sand was levelled, and the additional hours involved are still being calculated.


    Events:

    There have been no events requiring the removal of the boardwalk from the beach this year. The Armed Forces Day celebrations made the most of it in fact and used it to roll out a canon onto the beach as well as a platform for fans to meet the RAF Falcon Parachute team.


    image image


    EQUIPMENT


    image

    There was no change to our provision this year and RTC once again offered a Mobi-Chair (floating water chair), Hippocampe (beach wheelchair), Wheeleez beach rollator, Stabilo Positioning Cushion alongside the Lifeguards’ two beach and one sea wheelchairs.

    The equipment was available free of charge from 1st July – 1st September and managed by the Lifeguards. They collected the equipment from storage (Canoe Lake), did handovers to users and washed down the chairs before storage at the end of each day.


    CHANGING PLACE TOILET

    The temporary seasonal unit was so successful, we extended its opening from 1st May until 30th September 2025.

    Over this time, we are happy to report that there was no vandalism on the unit. There was a small repair needed on the door handle and soft-close mechanism at the end of the summer, which was addressed very quickly by AMP Hire.

    image

    An option to purchase the unit has also been put forward, which would relieve the time- pressure surrounding the refit works on Eastern Gardens Toilets, but also provide us with a repositionable option once the refit has been completed; maybe to be sited near Appley toilets or within the boundaries of No 11 St Thomas Sq. See point 3 for financial implications.

    The second year (of the two-year contract) comes to an end on 30th September 2025, and we’ve received confirmation that we can renew the contract for 2026 on the same basis and cost as this year.


    image image


    MEDIA COVERAGE

    Feedback has again been very positive. Especially when sharing posts on Facebook groups such as Wheelchair Accessible Places and Activities.

    In June, we also had the pleasure of hosting a team from VisitEngland, led by Lady Victoria Borwick, Chair of VisitEngland, alongside Claire Ford, Regional Development Lead, David Curtis-Brignell, Chair of Visit Isle of Wight and Will Myles, Managing Director.


    The NaShers team were also in attendance and rightly commended for their outstanding work on the extensive 320m of boardwalk – a real highlight of our efforts to improve beach access.

    It was incredibly encouraging to hear Visit England’s positive feedback and enthusiasm for our Beach Accessibility provision.


    image


    Following discussion with Lady Borwick and Will Myles, and with their strong recommendations to do so, we will be applying to Blue Badge Access Awards and the Accessible & Inclusive Tourism Awards to bring recognition of our efforts to a wider regional and national audience.


  2. BACKGROUND INFORMATION


    For 2026, the aim is to at least cover the ongoing costs attached to the Beach Accessibility provision, such as:

  3. FINANCIAL IMPLICATIONS


    Funds that are needed to run the Beach Accessibility in 2026:

    1. Renewal of Changing Place unit contract. £10,970

    2. Annual wheelchair maintenance £1,000

    3. Insurance £214

    4. Labour (in-house) to handle boardwalk £2,800

    TOTAL A £14,984


    Alternatively, the purchase of the Changing Place unit as a longer-term investment would be

    image


    The costs would therefore be:

    1. Purchase of Changing Place unit

    2. Annual wheelchair maintenance

    3. Insurance

    4. Labour (in-house) to handle boardwalk

    TOTAL B

    £30,000

    £1,000

    £214

    £2,800

    £34,014

    £30,000.



  4. OPTIONS


    There are two options for the third-year provision, they are as follows:


    1. Fund the required year 3 running costs, in full, from the 2026/27 budget, totaling

      £14,984.


      OR


    2. Purchase the Changing Place unit for £30,000 and fund the running costs of £4,014, totaling £34,014


  5. RECOMMENDATIONS


Officer recommendation is:


To approve Option B, which is to purchase the Changing Place unit and secure this asset for future use.

And


Fund the running costs of the Beach Accessibility for 2026 from the 2026/27 budget


Total Cost: £34,014