Great Preston Road, Ryde, (Temporary Prohibition of Through Traffic) Order No 1 2021 Island Roads on behalf of The Isle of Wight Council give notice that from 0800 hours from Monday 07 June 2021 until Sunday 20 June 2021, or when the works has been completed, no person shall cause any vehicle to proceed along Great Preston Road for its entire length. The alternative route will be sign posted locally. The closure is required for safety during utility works.

Pell Lane, Ryde, (Temporary Prohibition of Through Traffic) Order No 2 2021 Island Roads on behalf of The Isle of Wight Council give notice that from 0800 hours until 2300 hours, for one day, from Wednesday 02 June 2021 until Friday 04 June 2021, or when the works has been completed, no person shall cause any vehicle to proceed along Pell Lane between its junctions with Coach House Lane and Tandy Close. The alternative route will be sign posted locally. The closure is required for safety during carriageway repairs.

Arthur Street, Ryde, Isle of Wight) (Temporary Road Closure and Parking Restrictions Order No 2 2021 – Arthur Street for its entire length. The restriction is required for safety during carriageway re-surfacing works. Island Roads on behalf of the Isle of Wight Council give notice that between 0600 hours and 1800 hours on approximately five to ten days, or when the works have been completed, whichever is the sooner; that no vehicle or person may use, or cause any animal to use the following roads; and that no vehicle is permitted to wait on the following roads or within 50 metres on any adjoining side road where indicated by traffic signs. The closures are for carriageway and footway repairs, resurfacing, drainage works, verge maintenance and kerbing works between Friday 28 May 2021 and Friday 09 July 2021. Exact dates, durations and access information will be communicated to affected businesses and residents via letter and advanced warning signs before the scheme commences. It may be necessary to close this section of road on more than one occasion within this timeframe:

Various Streets, Ryde, Isle of Wight) (Temporary Prohibition of Through Traffic) Order No 11 2021 Island Roads on behalf of The Isle of Wight Council give notice that

Various Streets, Ryde, (Temporary Prohibition of Through Traffic) Order No 11 2021 Island Roads on behalf of The Isle of Wight Council give notice that

Island Roads on behalf of the Isle of Wight Council give notice that between Friday 04 June 2021 and Friday 16 July 2021 the following restrictions will be in place for both day and night for a period of approximately six weeks, or when the works have been completed, for safety during footway re-surfacing works. No vehicle or person may use or cause any animal to use the following roads; and that no vehicle is permitted to wait on the following roads or within 50 metres on any adjoining side road where indicated by traffic signs. These works may include carriageway and footway reconstruction, resurfacing, drainage works, verge maintenance and kerbing works.  In some cases, it may be necessary to close these sections of roads on more than one occasion within this timeframe. Exact dates, durations and access information will be communicated to affected businesses and residents via letter and advanced warning signs before the scheme commences:


Island Roads on behalf of the Isle of Wight Council give notice that between Friday 28 May 2021 and Friday 09 July 2021 the following restrictions will be in place for both day and night for a period of approximately six weeks, or when the works have been completed, for safety during footway re-surfacing works. No vehicle or person may use or cause any animal to use the following roads; and that no vehicle is permitted to wait on the following roads or within 50 metres on any adjoining side road where indicated by traffic signs. These works may include carriageway and footway reconstruction, resurfacing, drainage works, verge maintenance and kerbing works.  In some cases, it may be necessary to close these sections of roads on more than one occasion within this timeframe. Exact dates, durations and access information will be communicated to affected businesses and residents via letter and advanced warning signs before the scheme commences:

About Author

Exit mobile version